The kedge-anchor
The Project Gutenberg eBook of The kedge-anchor This eBook is for the use of anyone anywhere in the United States and most other parts of the world at no cost and with almost no restrictions whatsoever. You may copy it, give it away or re-use it under the terms of the Project Gutenberg License included with this eBook or online at www.gutenberg.org. If you are not located in the United States, you will have to check the laws of the country where you are located before using this eBook. Title: The kedge-anchor or, Young sailors' assistant. Author: William N. Brady Release date: January 18, 2026 [eBook #77729] Language: English Original publication: New York: William Brady (Author), 1847 Other information and formats: www.gutenberg.org/ebooks/77729 Credits: Chris Curnow, Harry Lamé and the Online Distributed Proofreading Team at https://www.pgdp.net (This file was produced from images generously made available by The Internet Archive) *** START OF THE PROJECT GUTENBERG EBOOK THE KEDGE-ANCHOR *** Transcriber’s Notes Texts printed in italics, bold face or blackletter have been transcribed between _underscores_, =equal signs= and ~tildes~
The Project Gutenberg eBook of The kedge-anchor
This eBook is for the use of anyone anywhere in the United States and
most other parts of the world at no cost and with almost no restrictions
whatsoever. You may copy it, give it away or re-use it under the terms
of the Project Gutenberg License included with this eBook or online
at www.gutenberg.org. If you are not located in the United States,
you will have to check the laws of the country where you are located
before using this eBook.
Title: The kedge-anchor
or, Young sailors' assistant.
Author: William N. Brady
Release date: January 18, 2026 [eBook #77729]
Language: English
Original publication: New York: William Brady (Author), 1847
Other information and formats: www.gutenberg.org/ebooks/77729
Credits: Chris Curnow, Harry Lamé and the Online Distributed Proofreading Team at https://www.pgdp.net (This file was produced from images generously made available by The Internet Archive)
*** START OF THE PROJECT GUTENBERG EBOOK THE KEDGE-ANCHOR ***
Transcriber’s Notes
Texts printed in italics, bold face or blackletter have been
transcribed between _underscores_, =equal signs= and ~tildes~
respectively. Small capitals have been transcribed as ALL CAPITALS.
[Illustration: U. S. Frigate UNITED STATES, under full sail.]
THE
KEDGE-ANCHOR;
OR,
YOUNG SAILORS’ ASSISTANT.
APPERTAINING TO THE PRACTICAL EVOLUTIONS OF MODERN SEAMANSHIP,
RIGGING, KNOTTING, SPLICING, BLOCKS, PURCHASES, RUNNING-RIGGING,
AND OTHER MISCELLANEOUS MATTERS, APPLICABLE
TO SHIPS OF WAR AND OTHERS.
~Illustrated with Seventy Engravings.~
ALSO,
TABLES OF RIGGING, SPARS, SAILS, BLOCKS, CANVASS, CORDAGE, CHAIN AND
HEMP CABLES, HAWSERS, &c., &c., RELATIVE TO EVERY CLASS OF VESSELS.
BY WILLIAM BRADY, SAILING MASTER, U. S. N.
SIXTH EDITION.
IMPROVED AND ENLARGED, WITH ADDITIONAL MATTER, PLATES, AND TABLES.
NEW YORK:
PUBLISHED BY THE AUTHOR.
SOLD AT R. L. SHAW’S NAUTICAL STORE, NO. 222 WATER ST., AND THE
PRINCIPAL NAUTICAL AND STATIONERS’ STORES THROUGHOUT THE UNITED STATES.
1852.
Entered according to the Act of Congress, in the year 1847.
BY WILLIAM BRADY,
in the Clerk’s Office of the District Court for the Southern District
of New York
DEDICATED
TO THE
UNITED STATES’ NAVY
AND
MERCHANT SERVICE.
PREFACE.
In offering the following work to the public, the author deems no
apology necessary, as it was written for the use of the Naval and
Merchant Service of the United States, as a ready means of introducing
Young Sailors to the theory of that art by which they must expect
to advance in the profession they have chosen. He flatters himself,
however, that it will be found useful to many old and experienced
seamen, as well as to those who have just entered the sailors’ life,
and particularly to those destined for the Navy. Should it fall into
the hands of the learned, they will bear in mind that he is better
versed with the marlinespike than the pen, and that it was composed in
the hours of relaxation from official duties. He therefore hopes that
it may be received for that which it is intended to be, A KEDGE-ANCHOR,
for the youthful sailor. The work has been submitted to the inspection
of a number of experienced officers, both in the Navy and Merchant
Service, who have given it their decided approbation;--some of whose
names are appended to the work. With these few remarks, he submits it
to a discerning public, to stand or fall on its own merits.
[Illustration: W.M. Brady, Master
“U.S.N.”]
RECOMMENDATIONS.
I have examined the manuscript of Mr. Brady and approve of it, as
a very useful Book for young officers and others, in the Naval and
Merchant service.
JOHN GALLAGHER, _Captain U. S. Navy_.
I fully concur in the above.
E. PECK, _Commander U. S. Navy_.
I have examined the within treatise on Seamanship, and other
miscellaneous matter appertaining to ships and vessels of war (written
by William Brady, Master U. S. Navy). It affords me much pleasure to
recommend the same to the junior officers of the Navy, and others who
may be disposed to learn the profession of Seamanship.
W. C. WETMORE, _Commander U. S. Navy_.
Examined and approved as a work that will be useful to the Service.
J. D. L. SAUNDERS, _Commander U. S. Navy_.
J. MATTISON, _Commander U. S. Navy_.
This I conceive to be a valuable work, and well calculated to be useful
to the Service.
JOSHUA R. SANDS, _Commander U. S. Navy_.
I have closely examined the within work, and think it well calculated
for the instruction of young officers and others in the Navy.
JAMES RENSHAW, _Captain U. S. Navy_.
I fully concur in the above.
FRANCIS O. ELLISON, _Master U. S. Navy_.
I have carefully examined the within work on Seamanship, and think it
one well calculated for the instruction of young officers, and others.
C. G. HUNTER, _Lieutenant U. S. Navy_.
We cheerfully recommend this work of William Brady, S. Master U. S.
Navy, to the maritime community, and think it well calculated for the
instruction of all who may be disposed to learn the profession of
Seamanship.
ISAAC McKEEVER, Captain U. S. Navy.
JAMES McINTOSH, Commander U. S. Navy.
WILLIAM L. HUDSON, Commander U. S. Navy.
HENRY EAGLE, Commander U. S. Navy.
A. G. GORDON, Lieutenant U. S. Navy.
CADWALDER RINGGOLD, Lieutenant U. S. Navy.
WILLIAM F. LYNCH, Lieutenant U. S. Navy.
HENRY W. MORRIS, Lieutenant U. S. Navy.
FRANCIS B. ELLISON, Lieutenant U. S. Navy.
JAMES H. ROWAN, Lieutenant U. S. Navy.
JOHN COLHOUN, Lieutenant U. S. Navy.
T. TURNER, Lieutenant U. S. Navy.
T. A. HUNT, Lieutenant U. S. Navy.
HENRY MOORE, Lieutenant U. S. Navy.
JOHN J. GLASSON, Lieutenant U. S. Navy.
CHARLES HEYWOOD, Lieutenant U. S. Navy.
CHARLES S. BOGGS, Lieutenant U. S. Navy.
ALEXANDER GIBSON, Lieutenant U. S. Navy.
ALEXANDER M. PENNOCK, Lieutenant U. S. Navy.
MONTGOMERY HUNT, Lieutenant U. S. Navy.
FRANCIS HAGGERTY, Lieutenant U. S. Navy.
J. R. McMULLANY, Lieutenant U. S. Navy.
CAPT. HENRY D. HUNTER, Commanding U. S. Rev. Steamer Polk.
JOHN McGOWAN, 1st Lieutenant U. S. Rev. Marine.
WILLIAM H. BROWN, Lieutenant U. S. Rev. Marine.
JOSEPH C. NOYES, Lieutenant U. S. Rev. Marine.
CAPT. E. RICHARDSON, President American Seamen Friend Society.
CAPT. AUGUSTUS PROAL, Reviewer of the Work.
CAPT. SAMUEL YEATON, Commanding Packet ship Oxford.
CAPT. D. G. BAILEY, Commanding Packet ship Yorkshire.
CAPT. GEORGE B. CORNISH, Commanding Packet ship Sheridan.
CAPT. E. G. FURBER, Commanding Packet ship Europe.
CAPT. A. B. LOWBER, Commanding Packet ship Montezuma.
CAPT. J. A. WOTTEN, Commanding Packet ship Admiral.
CAPT. JOSEPH HAMILTON, Commanding Packet ship So. Carolina.
CAPT. CHARLES R. GRIFFITH, Commanding Ship Southport.
CAPT. JAMES RENNE, Commanding Ship Gondola.
CAPT. IRA BURSLEY, Commanding Ship Hottenger.
CAPT. GEORGE W. HOWE, Commanding Packet ship Bavaria.
[Illustration: United States’ Ship-of-the-Line OHIO.]
CONTENTS.
PART I.
Number. Page.
1. To knot a Rope-Yarn, 21
2. To make a Fox, 21
3. To make a Spanish Fox, 21
4. To make a Knittle, 22
5. Overhanded Knot, 22
6. Figure of Eight-Knot, 22
7. Two Half-Hitches, 22
8. Reef or Square Knot, 22
9. A Bowline Knot, 22
10. Bowline on the Bight, 23
11. A Running Bowline, 23
12. A Timber-Hitch, 23
13. A Fisherman’s Bend, 23
14. A Rolling Bend, 23
15. A Carrick Bend, 23
16. A Cat’s-Paw, 24
17. A Sheet or Becket Bend, 24
18. A Black-Wall Hitch, 24
19. A Rolling Hitch, 25
20. A Salvagee Strap, 25
21. A Pudding for a Mast or Yard, 25
22. A Short Splice, 25
23. A Long Splice, 26
24. An Eye Splice, 26
25. A Cut Splice, 27
26. A Flemish Eye, 27
27. An Artificial Eye, 27
28. To worm and serve a Rope, 27
29. To clap on a Throat and Quarter Seizing, 28
30. To make a Turk’s Head, 28
31. To Sheepshank a Rope or Backstay, 29
32. To put a Strand in a Rope, 29
33. To Wall and Crown, 29
34. To make a Mathew Walker, 29
35. A Spritsail Sheet Knot, 30
36. A Shroud-Knot, 30
37. A French Shroud Knot, 30
38. A single Diamond Knot, 30
39. A double Diamond Knot, 31
40. A Stopper Knot, 31
41. A Buoy-rope Knot, 31
42. A Common Sennit, 31
43. A Sea Gasket, 31
44. A Panch or Wrought Mat, 32
45. A Harbor Gasket or French Sennit, 32
46. Pointing a Rope, 32
47. To make a Grommet, 33
48. To pass a Rose-Lashing, 33
49. To weave a Sword Mat, 33
50. A Lashing Cleat, 34
51. A Shell, Pin and Sheave, 34
52. A Single, Double and Treble Block, 34
53. A Shoulder Block, 34
54. A Fiddle Block, 35
55. A Shoe Block, 35
56. A Sister Block, 35
57. A Dead-Eye, 35
58. A Heart, 36
59. A Belaying-pin Rack, 36
60. A Euphroe, 36
61. A Horn Cleat, 36
62. A B-Cleat, 36
63. A Strap for a Block, 36
64. A Tail Block, 37
65. A Purchase Block, 37
66. A Top Block, 37
67. A Cat Block, 38
68. A Snatch Block, 38
69. A Nun Buoy, 38
70. To bend a Buoy-Rope, 38
71. To Pudding the Ring of an Anchor, 39
72. A Jacob’s Ladder, 39
73. Can-Hooks, 40
74. Hogshead Slings, 40
75. Barrel Slings, 40
76. A Single Whip, 40
77. A Gun-Tackle Purchase, 41
78. A Luff-Tackle Purchase, 41
79. A Top Burton, 41
80. Whip and Runner, 41
81. Runner and Tackle, 41
82. A Twofold Purchase, 41
83. A Threefold Purchase, 42
84. Names of Ropes, 42
PART II.
85. Launching a Ship, 43
86. Cutting out Standing Rigging, 44
87. Cutting out Topmast and Top-gallant Rigging, 45
88. Cutting out Breast and Standing Back-stays, 45
89. Cutting out Catharpen Legs and Futtock Shrouds, 46
90. Cutting out Fore and Aft Stays, 46
91. Cutting out Lower Mast Head Pendants, 46
92. Cutting out Bobstays, 46
93. Cutting out Bowsprit Shrouds, 47
94. Cutting out Jib and Flying Jib Guys, 47
95. Cutting out Running Rigging, 47
96. Rigging Shears and taking in Masts and Bowsprit, 47
97. To take in the Mizen Mast, 50
98. To take in the Main and Foremast, 51
99. To take in the Bowsprit, 51
100. Gammoning the Bowsprit, 52
101. Fitting Rigging, 53
102. Fitting Mast-head Pendants, 54
103. Fitting Lower and Topmast Stays, 54
104. To Rig the Foremast, 55
105. Futtock Shrouds, 57
106. To Rig the Main and Mizen Mast, 58
107. To Rig the Bowsprit, 58
108. Getting Tops over (whole Tops,) 59
109. Getting Half-tops over, 60
110. Getting up Top-blocks, 61
111. Getting up Top-masts, 61
112. Getting the Cap into the Top, 62
113. Turning in Dead-eyes, 63
114. Getting Topmast Cross-trees over, 64
115. Placing Topmast Rigging, 65
116. To seize-in the Sister Blocks, 65
117. Backstays (Breast), 66
118. Standing After Backstays, 67
119. Main Topmast Stay, 67
120. Mizen Topmast Stay, 67
121. Getting the Topmast Caps on, 68
122. Mast-head Man-ropes, &c., &c., 68
123. Top-Tackle Pendants, 69
124. Preparing to Fid the Topmasts, 69
125. Rattling the Lower and Topmast Rigging, 70
126. Futtock Staves in Topmast Rigging, 71
127. To Rig the Jib-Boom, 71
128. Jib-Boom Martingale Stay, 72
129. Jib-Boom Guys, 72
130. Martingale Back-ropes, 73
131. Placing the Rigging on a Dolphin Striker, 73
132. Getting the Jib-Boom out, 73
133. Sending up Topgallant Masts, 74
134. Royal Rigging, 75
135. Short and Long Topgallant Mast Ropes, 76
136. To Rig the Flying Jib-Boom, 76
137. Spritsail Lifts, 77
138. Spritsail Braces, 77
139. Strapping Thimbles for Guys on Spritsail yard, 77
140. Crossing a Spritsail Yard, 78
141. Two Half-spritsail Yards, 78
142. Whiskers, 79
143. To get on board and rig Lower Yards, 79
144. Truss Straps, 80
145. Truss Pendants, 80
146. Quarter Blocks--Lower Yards, 80
147. Clew Garnet Blocks, 81
148. Lift Blocks--Lower Yards, 81
149. Foot Ropes and Stirrups, 81
150. Jack Stays--Bending and Reefing, 82
151. Brace Blocks--Lower Yards, 82
152. Placing the Rigging on Lower yards, 83
153. Getting up Jeer Blocks and Reeving Jeers, 84
154. Lower Lift Blocks, 84
155. Reeving Lower Lifts, 85
156. Main Braces, on Bumkin, &c., 85
157. Fore Braces, 85
158. Crossing the Lower Yards, 86
159. To get on board the Topsail Yards, 86
160. Rigging Topsail Yards, Fore and Main, 86
161. The Mizen-Topsail Yard, 88
162. Placing the Rigging on Topsail Yards, 88
163. Crossing the Topsail Yards, 88
164. Fitting Fly-Blocks for Topsail-Halliards, 89
165. Rigging Topgallant Yards, 90
166. Topgallant Braces, 91
167. Crossing Topgallant Yards, 92
168. Crossing Royal Yards, 93
169. Royal and Topgallant Gear, 94
170. Spanker-Boom, Trysail-Masts and Gaff, 94
171. Spanker-Boom Sheets and Guys in one, 95
172. Spanker-Boom Topping Lifts, 95
173. A Brig or Schooner’s Main-Boom, 96
174. Reeving Peak-Halliards, 96
175. Reeving Throat-Halliards, 96
176. To Fit Single Vangs, 96
177. To Fit Double Vangs, 97
178. Fitting Gaffs with Cheek or Brail-Blocks, 97
179. Getting up a Gaff, 97
180. Lower Studding-sail or Swinging-Booms, 98
181. Lower Studding-sail Outhaul-Blocks, &c., &c., 99
182. Topmast Studding-sail, Span-Blocks, Halliards, &c., 100
183. Topgallant Studding-sail Booms, 101
184. Getting Studding-sail Booms up, 101
185. Topgallant Studding-sail Gear, 102
186. Stowing Hold and Spirit Room (Ballast and Tanks), 103
187. Stowing Casks, 104
188. Stowage of Provisions and Naval Stores, 104
189. Stowing Chain Cables, 105
190. To get on Board and Stow the Hemp Cables, 105
191. Cat-head Stoppers, 106
192. Shank Painter, 106
193. Fish Davit Gear, 106
194. Getting on Board and Stowing Anchors, 108
195. Bending the Cables, 109
196. To Range and Stopper the Cables, 109
197. Stoppers, &c., 110
198. Compressors, or Combing Stoppers, 110
199. Putting on Nippers, 111
200. Iron Claw Stoppers, &c., 111
201. To Cut and Pass a Messenger, 112
202. Splicing Rope Cables, 112
203. To Ship and Unship a Rudder, 113
204. Getting the Guns on Board, 114
205. Fitting Shackle Breechings, 116
206. Triatic Stay, 116
207. Hoisting in Spars, 117
208. Stowing Booms, 117
PART III.
209. Fore Bowlines, 119
210. Fore Topsail Clewlines, 119
211. Topsail Buntlines, 120
212. Fore-Top Bowlines, 120
213. Main Buntlines, 120
214. Fore Buntlines, 121
215. Main Bowline, 121
216. Top-Gallant Sheets, 121
217. Top-Gallant Clewlines, 122
218. Fore Topgallant Bowlines, 122
219. Main Topgallant Bowlines, 122
220. Mizen Topgallant Bowlines, 122
221. Topgallant Buntlines, 123
222. Royal Bowlines, 123
223. Reef-Tackles, 123
224. Leech-lines, 124
225. Slab-lines, 124
226. Royal Clew-lines, 124
227. Fitting Tacks and Sheets, Bumkin, Gear, &c., 125
228. Yard-Tackle Tricing-lines, 125
229. To Reeve and Toggle Royal Halliards, 125
230. Fore-Storm Staysail Gear, 126
231. Main-Staysail Gear, 127
232. Mizen-Staysail Gear, 127
233. Topmast Staysails, &c. &c., 128
234. Setting up Rigging for a full due, 129
235. Staying Masts, 130
236. Blacking Rigging, 130
237. Stationing the Crew, 131
238. Stationing the Crew at Quarters, 132
239. Stationing the Crew for Mooring and Unmooring, 133
240. Loosing and Furling, 133
241. Stationing the Crew for Tacking and Veering, 134
242. Getting ready to Bend Sails, 134
243. Bending Sails, 135
244. Bending Small-sails, 136
245. Bending a Spanker, &c., 137
246. Fitting Sea-Gaskets, 138
247. Fitting Harbor-Gaskets, 138
248. Bunt-Gaskets, 139
249. Hammock Girtlines, 139
250. Stopping on Hammocks, 140
251. Furling or Stowing, the Bunt of a Sail, 140
252. Furling Courses, 140
253. Making up Sails, 141
254. To make up a Topmast Studding-sail, 142
255. Furling Fore and Aft Sails, with cloths or covers, 142
256. Reefing Courses, &c.,--Jackstays, 143
257. Reef Earings, 143
258. Bending Studding-sails, 144
259. Preparations for leaving the Wharf, and hauling out in the
Stream, 145
260. Carrying out an Anchor with a Boat, 146
261. Marking the Lead-line, 146
262. Heaving the Lead, 147
263. Marking a Log-line, 148
264. Getting ready for Sea, 148
265. Clear Hawse, 149
266. Weighing an Anchor with the Launch, 150
267. Weighing an Anchor with a Buoy Rope, 151
268. Boating an Anchor, 152
269. Taking in a Launch, 152
270. Taking in Boats both sides at once, 153
PART IV.
271. Getting under-weigh, 154
272. When the Messenger Strands, or is likely to part, 155
273. To get under-weigh, and stand before the Wind, 156
274. To get under-weigh and back a-stern to avoid danger, 157
275. Getting under-weigh--a Shoal on each Beam, 157
276. Getting under-weigh in a Narrow Channel, 158
277. Head to Wind--cast on Larboard Tack, 159
278. Windward Tide--get under-weigh and stand before the wind, 159
279. To get under-weigh, and stand out on a wind, 160
280. Riding head to Tide--wind on the Starboard Quarter, get
under-weigh on the Starboard Tack, 161
281. Getting under-weigh--wind across the Tide, 161
282. To back and fill in a Tideway, 162
283. Driving before the Wind, 162
284. Driving broadside-to, 163
285. Securing the Ship for Sea, 163
286. Stowing the Anchors for Sea, 163
287. Setting Topgallant sails--blowing fresh, 164
288. Setting Courses, 164
289. Setting the Spanker, 165
290. Setting the Jib, 165
291. Setting Lower Studding-sails, 166
292. Shifting a Course at Sea, 166
293. Taking in a Course in a Gale of Wind, 167
294. Taking in a Topsail in a Gale of Wind, 167
295. Taking in a Topgallant Sail, 168
296. Taking in a Spanker, 168
297. Setting a Close-reefed Topsail, 168
298. A Close-reefed Topsail Splits, 168
299. A Jib Splits, 169
300. Wearing a Ship under a Close-reefed Main-Topsail, and
Storm-staysail, 169
301. Wearing under a Main-sail, 170
302. Wearing under Bare Poles, 170
303. Cutting away the Masts, 170
304. Laying-to under Lower Stay-sails--Wear Ship, 170
PART V.
305. Precautions for Scudding, 171
306. Scudding--a Ship Broaches-to, 172
307. Scudding--brought by the Lee, 172
308. Heaving-to, 173
309. Taking in a Lower Studding-sail--blowing fresh, 173
310. To unbend a Topsail in a gale of wind, 174
311. Securing in a Gale, 174
312. Preparations for a Hurricane at Sea, 175
313. Preparations for a Hurricane, at Anchor, and Notes on
Barometer, 175
314. The Foremast is carried away, 178
315. To Rig a Jury Mast, 178
316. Accidents to Tiller in the event of losing a Mast, 178
317. The Mainmast is carried away, 179
318. The Bowsprit is carried away, 179
319. A Topmast is carried away, 179
320. The Jib-Boom is carried away, 179
321. The Foremast is sprung near the Hounds, or Bibbs, 180
322. The Foremast and Bowsprit are carried away, 180
323. The Bowsprit is Sprung, 180
324. A Topmast is Sprung near the Lower Cap, 181
325. To send aloft a Topmast, and a heavy Sea on, 181
326. The Gammoning carried away, 181
327. A Lower Cap splits, 181
328. The Trestle-trees are Sprung, 182
329. A Lower Yard is carried away in the Slings, 182
330. A Topsail Yard is carried away, 182
331. The Ship leaks faster than the Pumps can free her, 183
332. The Pumps are choked, 183
333. A Shot gets loose in a Gun secured for a Gale, 183
334. To throw a Lower-deck Gun overboard, 184
PART VI.
335. To turn Reefs out of the Topsails and Courses, 185
336. The Rudder is carried away--to fit another, 185
337. A Ship on fire at Sea, 186
338. A Ship on her beam ends, 187
339. Wind free, all sail set, struck by a Squall, 187
340. Struck by a Squall on a Lee Shore, 187
341. Struck by a Squall under whole Topsails and Courses, 188
342. On a wind under whole Topsails--part the weather Main Topsail
brace, 188
343. The Jib Downhaul parts, 188
344. To Chase, 188
345. To Chase to Windward, 189
346. Observations for a Ship to Windward that is chased, 189
347. To Chase to Leeward, 190
348. To Windward of an enemy within pistol-shot--the weather main
rigging is shot away, both ships with main Topsails to the
mast, 190
349. Wind on the Quarter, all sail set--bring by under
double-reefed Topsails, 191
350. Wind on the Quarter, all sail set--bring to on the other
Tack, under double-reefed Topsails, 191
351. How to get the Anchor off the Bows, 191
352. Anchor head to wind, wind free, 192
353. To Anchor on a Lee Shore, 192
354. Scudding under a Foresail--to come to an Anchor, 193
355. To make a Flying moor, 193
356. To Moor with a long scope of chain, 194
357. Blowing Fresh--in Port, 194
358. Send down Lower Yards, 194
359. To House Topmasts, 195
360. To back a Bower by a Stream, 195
361. To Sweep for an Anchor, 195
362. Preparations for leaving Harbor, 196
363. Weighing Anchor in a head Sea, 196
364. Casting or Cutting the Cable, 196
365. Clinching Cables, 197
366. Fitting Buoy-Ropes, 197
367. Jib-Halliards, with a Whip, 197
368. Jib-Sheets, double, 198
369. Wrecked in a Gale, 198
370. Setting up Rigging at Sea, 199
371. Slacking the Jib-stay in bad weather, 200
372. Stopping out Top-Gallant Yard Ropes, 200
373. Preventer Braces, 200
374. Keeping a Clear Anchor, 201
375. Anchor turning in the ground, 201
376. To tend to a weather Tide, 201
377. A Man overboard (at sea), 202
378. Jib and Staysail Halliard Blocks at Mast-head, 203
379. To keep the Hawse clear when Moored, 203
380. To tend to Windward--single Anchor, 203
381. To tend to Leeward, 203
382. To Back Ship at Anchor, 204
383. To break the Shear, 204
384. On Getting to Sea, 204
385. On Fire Regulations in the Merchant Service, 205
386. Station Bill for fire in the Merchant Service, 207
387. Taking to the Boats, 208
388. Losing a Rudder at a Critical Moment, &c., 209
389. Steamers getting aground, 209
390. The duty of remaining by a damaged Vessel, 210
PART VII.
391. On Squaring Yards, 213
392. Up Topgallant Masts and Yards--the Mast being on deck, 214
393. Down Topgallant Masts and Yards, 215
394. Crossing Topgallant and Royal Yards, and loosing Sails, 216
395. Top-Mast carried away, 217
396. Clearing the Wreck of a Topmast, 218
397. Carrying away a Jib-Boom, 218
398. To fish a Lower Yard in the Shortest Time, 218
399. Expectation of losing a Lower Mast, 219
400. Lying-to in a Gale, after the loss of Masts, 219
401. Spars to convert in case of need, 219
402. Getting aground, 220
403. The Ballast shifting at Sea, 221
404. Vessels Surprised on Opposite Tacks, 221
405. Meeting at Sea, 222
406. A Hint on Running too Long, 222
407. A Hint on Rounding-to in a Gale, 223
408. On Making your Port, 223
409. Laying off and on to enter a port, 223
410. To Anchor and Veer a long Scope of Cable, 224
411. Preparations--Going into Harbor, 224
412. Cautions at Night, (Lookouts), 224
413. Two Vessels in Collision, 225
414. Squalls, (Caution), 225
415. Water Spouts, (Caution,) 225
416. Pressure of Water at different depths, 226
417. On Stopping Leaks, 226
418. Examination of Chain Cables, 227
419. Minute Guns, 227
420. Hoisting on Board Money or Plate, 228
PART VIII.
421. Stowing Hammocks, 229
422. Cockbilling Yards, 230
423. Dressing Ship with Flags, 230
424. Keeping the Copper clean, 231
425. Furling from a Bowline, 232
426. High and Low Bunts, 233
427. To Clear Mast-heads, 233
428. Placing belaying-cleats in Tops, 234
429. Making Swabs, 234
430. Stowage of Swabs, 235
431. Junk, 235
432. Making Mats, and Chafing Gear, 235
433. Gaskets, 236
434. Scraping and Greasing Mats, 237
435. Manning Yards, 237
436. Man Ropes--(side), 238
437. Spare Dead-eyes, 238
438. Hide Rope, 239
439. Hawse-hole Windsail, 239
440. Fighting Ladders, 239
441. Hawse Bucklers, 239
442. Making-fast a Warp to a Vessel, 240
443. Fitting Quarter Boats’ Gripes, 240
444. Fitting Gigs’ Slings, 240
445. Scrubbing a Boat’s bottom on leaving Harbor, 241
446. Carrying Light Boats on Shore, 241
447. Miscellaneous Notes on Working Boats, 242
448. Duties of Boats’ Crews, 243
449. Boats going on Distant Service, 243
450. Boats under Sail, 244
451. Giving a rope to a Boat, 244
452. Crossing a Bar with Surf--in Boats, 245
453. Hauling up Boats, 246
454. Lowering Boats, 246
455. Turning up the Hands, 246
456. Inspection of Rigging, Morning and Evening, 247
457. Inspection of Stowed Anchors, at Sea, 247
458. Inspection of Boats at Sea, 248
459. Gammoning the Bowsprit, 248
460. Precaution in Reeving Running-rigging, 249
461. Topsail Tyes, 249
462. Precaution in Blacking Rigging, 250
463. Fore and Main Buntlines, 250
464. Topgallant Mast Ropes, 250
465. Futtock Shrouds, 251
466. Tops and Half-Tops, 251
467. Striking or Housing Topmasts, 251
468. Swaying up Topmasts, 252
469. Unmooring, 252
470. Reef-lines to the Topsails, 253
471. Reefing Courses, 253
472. Topgallant-Masts struck, 254
473. Hailing aloft, 254
474. Proportions for Cables (Hemp), 254
475. Proportions for Anchors, 254
476. What length is necessary to form a Clinch, 255
477. References to Sketch of Temporary Rudder, 255
478. To Splice an Old Cable to a new one, 255
479. Strip Ship, 256
480. Proportions of Spars of Merchant Ships, Length of Spars, &c. 256
481. Thickness of Spars (Masts), 257
482. Yards, 257
483. Distance for Placing Lower Masts, 257
484. Rule for Placing Masts in a Ship, 257
485. Raising Shears on a Wharf, 258
486. To find the Tonnage of a Vessel by U. S. Measurement, 259
487. Stepping and Raking Lower Masts, 259
488. Mooring, 260
PART IX.
489. Preparations for Heaving-down, 261
490. A Derrick, 269
General Cautions, 270
PART X.
491. Explanation of Sea Terms, 273
PART XI.
492. A table showing the weight of Cables and Anchors, used in
ships and vessels of war, in the U. S. Navy, 290
493. A table showing the weight of Guns and Carriages, 291
494. A table showing the weight of Chain Cables, 292
495. A table showing how many fathoms make 112 pounds of
four-strand shroud-laid rope, 292
496. Weight of one foot of Bar Iron, 293
497. A Table showing the weight of one hundred fathoms cable-laid
rope, from two to twenty-six inches, 293
498. A Table showing the strength of hemp-cables, their weight,
size, and number of yarns in each, 294
499. A Table showing the strength of plain-laid rope, three
strand, 295
500. A Table showing the strength of chain cable, as tested in
fifteen fathom lengths, 296
501. A Table showing the strength of short round-linked Bobstay,
Bowsprit shroud, or crane-chain without studs, such as is
used for rigging, &c. 297
502. Weight of Timber in a green and seasoned state, 298
503. A Table of measures and weights of different substances, 298
504. A Table of weight of tarred Cordage, 299
505. A Table showing the comparative strength between Iron Chains
and Hemp Cables, and the size required agreeably to the
Tonnage, 299
506. A Table showing the test required of flax and cotton Canvass,
as to quality and strength, before being received for use, in
the U. S. Naval service, 300
507. Cordage Table, showing the weight of one fathom of rope, from
one to twenty-four inches, plain-laid three strands, &c. 301
508. A Table showing the length of 1st warp of Standing Rigging, 302
509. A Table of Foreign Ordnance, 303
510. A Table showing the quantity of provisions, slop-clothing,
and small stores, for two hundred men for four months, U. S.
Navy, 304
511. A Table showing the component parts of the Navy ration, 305
512. A Table for finding the distance of an object by two
bearings, and the distance between them, 308
513. Dimensions of masts and spars, of the U. S. ship Princeton, 309
514. A Table of the size of short-linked chain, when used as
rigging, 310
515. A Table showing the dimensions of the masts and yards, of
American, English, and French ships, 312
516. A Table showing the compliment of Officers and Crew, allowed
to each class vessel in U. S. Navy, 314
517. A Table of spars, &c., for all classes of vessels, 318
518. A Table showing the dimensions and quality of materials, used
in constructing tops, trestle-trees, cross-trees, and caps,
in U. S. Navy, 324
519. A Table showing the complement and quality of Boats to each
class vessel in U. S. Navy, 326
520. A Table showing the weight, size, length and quality, of
anchors, cables, &c., allowed to the different class vessels
in U. S. Navy, 328
521. A Table showing the size, quantity, quality, and number of
sails, allowed to each class vessel U. S. Navy, 332
522. A Table showing the quantity of canvass, rope, &c., allowed
for one suit of sails, for each class of vessel U. S. Navy, 336
523. A Table showing the length and size of standing and
running-rigging, for all classes of vessels in U. S. Navy,
with miscellaneous articles, 340
524. A Table showing the size, and description, of the different
named Blocks, for all classes of vessels in U. S. Navy, 364
525. A Table showing the projective distances from the spar-deck
of U. S. Ship North Carolina, 384
526. A Table showing the weight of armament, stores, outfits and
provisions, of U. S. sloop of war Albany, 386
527. Recipe for blacking Ships’ standing-rigging, 389
528. Recipe for blacking guns, 389
529. Recipe for blacking hammock-cloths, yards, and bends, 389
530. Recipe for making Liquid Blacking, 390
531. Recipe for blacking guns, 2nd., 390
532. Recipe Composition for blacking guns, 390
533. Recipe for making Black Varnish, No. 1, 390
534. Recipe for making Composition for blacking hammock cloths,
No. 1, 390
535. Recipe for making Composition for blacking hammock cloths No.
2, 391
536. Recipe for making Composition for blacking hammock cloths No.
3, 391
537. Recipe for making Composition for blacking hammock cloths No.
4, 391
538. Recipe for making Black Varnish, No. 2, 391
539. Recipe for making Solder for Copper, 391
540. Recipe for making Solder for Lead, 392
541. Recipe To make the best drying Oil, 392
542. Recipe for Black Stain, 392
543. Recipe for blacking Guns and Shot, 392
544. French Recipe for blacking Guns, 393
[Illustration: United States Razee or Frigate INDEPENDENCE, at Anchor.]
THE KEDGE-ANCHOR.
PART I.
_We shall first commence with knotting a rope-yarn._
=1.=--TO KNOT ROPE-YARNS.
Take the two ends of the yarns, and split them open about two inches
from the end; and if to make a smooth knot, you may scrape down a
little with a knife, so as to make the ends lay smooth; you then
crutch them together as you see in Plate No. 1. Take two opposite ends
(leaving the other two dormant), pass one of the ends _under_, and the
other _over_ the standing part of the yarn, connecting them together at
the same side you took them from at first; then jam your knot taut, and
see if it will stand test by stretching the yarn from knee to knee, and
hauling on it; if it stands without drawing, you may trim the ends, and
go on.
=2.=--TO MAKE A FOX.
Take two or three rope-yarns and make them fast to a belaying-pin;
stretch them out taut, and twist them together on your knee; then rub
it down smooth with a piece of old tarred parcelling. This is called
a Fox, and is used for many purposes, such as making gaskets, mats,
plats, temporary seizings, bending studding-sails, &c.
=3.=--TO MAKE A SPANISH FOX.
Take a single rope-yarn and make one end fast as before to a
belaying-pin, and untwist and twist it up again the contrary way, and
rub it smooth. This is used for small seizings, &c.
=4.=--TO MAKE A KNITTLE.
A Knittle is made of two or three rope-yarns laid up together by hand,
twisting them between the thumb and finger, and laying them up against
the twist of the yarn. They are used for many purposes on board a ship,
particularly for hammock clews.
=5.=--OVERHANDED KNOT.
To make an overhanded knot, you pass the end of the rope over the
standing part and through the bight.
=6.=--FIGURE OF EIGHT KNOTS.
Take the end of your rope round the standing part, under its own part
and through the lower bight, and your knot is made.
=7.=--TWO HALF-HITCHES.
Pass the end of your rope round the standing part, and bring it up
through the bight--this is one half-hitch; two of these, one above the
other, completes it.
=8.=--REEF, OR SQUARE KNOT.
First make an overhanded knot round a yard, spar, or anything you
please; then bring the end being next to you over the left hand and
through the bight; haul both ends taut, and it is made.
=9.=--A BOWLINE KNOT.
Take the end of the rope in your right hand, and the standing part in
the left--lay the end over the standing part, then with your left hand
turn the bight of the standing part over the end part, so as to form
a cuckold’s neck on the standing part; then lead the end through the
standing part _above_, and stick it down through the cuckold’s neck,
and it will appear as in the Plate.
=10.=--BOWLINE ON THE BIGHT.
Take the bight of the rope in your right hand, and the standing part
in the other; throw a cuckold’s neck over the bight with the standing
parts, then haul enough of the bight up through the cuckold’s neck to
go under and over all parts; jam all taut, and it will appear as in the
Plate.
=11.=--A RUNNING BOWLINE.
Take the end of the rope round the standing part, through the bight,
and make a single bowline upon the running part, and the knot is made.
=12.=--A TIMBER HITCH.
Take the end of a rope round a spar; pass it under and over the
standing part then pass several turns round its own part and it is done.
=13.=--A FISHERMAN’S BEND.
With the end of a rope take two round turns round a spar, or through
the ring of a kedge-anchor; take one half hitch around the standing
parts, and under all parts of the turns; then one half hitch around the
standing part above all, and stop the end to the standing part; or you
can dispense with the last half hitch, and tuck the end under one of
the round turns, and it becomes a studding-sail bend.
=14.=--A ROLLING BEND.
A rolling bend is something similar to a fisherman’s bend. It is two
round turns round a spar as you see in the plate, two half hitches
around the standing part, and the end stopped back.--(_See Plate._)
=15.=--A CARRICK BEND.
This bend is more used in bending hawsers together than for any other
purpose. In forming this bend you will take the end of the hawser, and
form a bight, by laying the end part on the top of the standing part,
so as to form a cross; take the end of the other hawser, and reeve it
down through this bight, up and over this cross; then pass the end down
through the bight again on the opposite side, from the other end, for
one end must be on the top, and the other underneath, as you see in the
plate.
If both end parts come out at the top it will be a granny’s knot.
(_Remember this._)
=16.=--A CAT’S-PAW.
This is generally used in the ends of lanyards, to hook the tackle to,
in setting up rigging; to form it, you first lay the end part of the
lanyard across the standing part, which will form a bight; then lay
hold of the bight with one hand on each side of it, breaking it down,
and turning it over _from you_ two or three times; clap both bights
together, and hook on to both parts.--(_See Plate._)
=17.=--A SHEET OR BECKET BEND.
Pass the end of a rope through the bight of another rope, or through
the becket of a block; then round both parts of the bight, or becket,
and take the end under its own part, as you see in the plate. It is
sometimes put under twice, and the end stopped back to the standing
part.
=18.=--A BLACK-WALL HITCH.
This is used with a lanyard, in setting up rigging, to hook a luff
tackle to, instead of a cat’s paw, where the end of the lanyard is not
long enough to form a paw; but a strap and toggle is preferable to both.
To make a black-wall over a hook, you form a bight, or rather a _kink_
with the end of the lanyard, having the end part underneath, and the
standing part on the top; stick the hook through the bight, keeping the
bight well up on the back of the hook (as you see in the plate), until
you set taut the tackle.
_Note._--You can learn it much better by practice than explanation.
[Illustration:
Knotting a r’pe Yarn.
Square or Reef Knot.
Two Half Hitches.
Overhaul Knot.
Figure of Eight Knot.
Bowline Knot.
Running Bowline.
Bowline on the bight.
Timber Hitch.
Fisherman’s Bend.
Rolling Bend.
Carrick Bend.
Cat’s Paw.
Sheet Bend.
A Black-wall Hitch.
Rolling Hitch.
Selvagee Strap.
A Pudding for a Mast.
To form a Short Splice.
To form an Eye Splice.
An Eye Splice.
A Short Splice.
A long Splice.
Artificial Eye.
Flemish Eye.
A Long Splice, 4-strand Rope.
Cut Splice.]
=19.=--A ROLLING HITCH.
With the end of a rope take a half-hitch around the standing part; then
take another through the same bight, jaming it in above the first hitch
and the upper part of the bight, then haul it taut, and dog your end
above the hitch, around the standing part, or you may take a half-hitch
around the standing part and stop the end back with a yarn.
=20.=--A SALVAGEE STRAP.
To make a salvagee strap, you may get a couple of spike nails, and
drive them into an old piece of plank, or whatever you can find
convenient to answer the purpose, or get two hooks, lash them to any
convenient place, as far apart as the length you intend to make the
strap; take the end of the ball of rope-yarns, and make it fast to one
of the spikes or hooks, then take it round the other one, and keep
passing the rope-yarn round and round in this manner, hauling every
turn taut as you pass it, until it is as stout as you wish it to be.
If it is to be a very large strap, marl it down with stout spun-yarn;
if of middling size, marl with two single rope-yarns; if a small strap,
a single rope-yarn.
=21.=--A PUDDING FOR A MAST OR YARD.
Take a piece of rope of the required length, and splice an eye in each
end; get it on a stretch, worm it, and then parcel it according to the
shape you want it. They are generally made as you see in the Plate,
large in the middle, tapering gradually toward the ends, and made flat
on the side that goes next the yard or mast. When you have got it the
size required, marl it down, commencing in the middle and marling both
ways until you come to the eye; if it is intended for a yard it is
generally covered with thick leather or green hide; if for a mast, it
is pointed over for neatness.
=22.=--A SHORT SPLICE.
To splice the two ends of a rope together, you first unlay the rope
to a sufficient length, then crutch them together as you see in the
plate; you must then lay hold of the three strands next to you in your
left hand, holding them solid around the other part until you stick
the three upper ends, or, if it is a large rope, you may stop the
ends with a yarn; then take the upper or middle end, pass it over the
first strand next to it, stick it underneath the second strand, and
haul it taut in the lay of the rope; turn the rope a little towards
you, and stick the second end as you did the first; the third in the
same manner, hauling them taut along the lay of the rope;--turn the
rope round, stick the other three ends in the same manner, and it will
appear as in the plate.
_Note_.--If you intend to serve over the ends, you need not stick
them but once; but if not you must stick them twice, and cross-whip
them across the strands so as to make them more secure. If the ends
are to be served, take a few of the underneath yarns, enough to fill
up the lay of the rope for worming, then scrape or trim the outside
ends, and marl them down ready for serving.
=23.=--A LONG SPLICE.
To make a long splice, unlay the ends of two ropes to a sufficient
length, crutch them together in the same manner as a short splice;
unlay one strand for a considerable length, and fill up the space which
it leaves with the opposite strand next to it; then turn the rope round
and lay hold of the two next strands that will come opposite their
respective lays, unlay one and fill up with the other as before; then
cut off the long strands, and it will appear as in the Plate.
To complete this splice, you will split the strands equally in two,
then take the two opposite half strands and knot them together, so
as to fill up the vacant lay; then you stick the ends twice under
two strands with all six of the half strands, leaving the other six
neutral; then stretch the splice well before you cut the ends off, and
it is finished.
=24.=--EYE-SPLICE.
An eye-splice is made by opening the end of a rope, and laying the
strands at any distance upon the standing part of the rope, according
to the size of the eye-splice you intend to make; you then divide
your strands by putting one strand on the top and one underneath the
standing part, then take the middle strand, (having previously opened
the lay with a marlinespike,) and stick it under its respective strand,
as you see in the Plate. Your next end is taken over the first strand
and under the second; the third and last end is taken through the third
strand on the other side.
=25.=--A CUT SPLICE.
Cut a rope in two, and according to the size you intend to make the
splice or collar--lay the end of one rope on the standing part of the
other, and stick the end through between the strands, in the same
manner as an eye-splice, and it will appear as in the plate. This forms
a collar in the bight of a rope, and is used for pendants, jib-guys,
breast-backstays, odd shrouds, &c.
=26.=--A FLEMISH EYE.
Unlay the end of a rope, open the strands and separate every yarn,
divide them in two halves, then take a piece of round wood the size
you intend to make the eye, and half-knot about one-half of the
inside yarns over the piece of wood; scrape the remainder down over
the others; marl, parcel, and serve, or if preferable, hitch it with
hambro-line. This makes a snug eye for the collars of stays. (_See
Plate._)
=27.=--AN ARTIFICIAL EYE.
Take the end of a rope and unlay one strand to a certain distance, and
form the eye by placing the two strands along the standing part of the
rope and stopping them fast to it; then take the odd strand and cross
it over the standing part, and lay it into the vacant place you took
it from at first; work around the eye, filling up the vacant strand
until it comes out at the crutch again, and lies under the other two
strands; the ends are tapered, scraped down, marled, and served over
with spun-yarn.
=28.=--TO WORM AND SERVE A ROPE.
Worming a rope, is to fill up the vacant space between the strands of
the rope with spun-yarn; this is done in order to strengthen it, and to
render the surface smooth and round for parceling.
Parceling a rope is wrapping old canvass round it, cut in strips from
two to three inches wide, according to the size of the rope; the strips
of canvass to be well tarred and rolled up in rolls before you commence
to lay it on the rope. The service is of spun-yarn, clapped on by a
wooden mallet such as you see in the plate, called a serving mallet;
it has a large score cut in the under part of it, so as to fay on the
rope, and a handle about a foot long, or according to the size of the
mallet. The service is always laid on against the lay of the rope; a
boy passes the ball of spun-yarn at some distance from the man that is
serving the rope, and passes it round as he turns the mallet; when the
required length of service is put on, the end is put under the three or
four last turns of the service and hauled taut.
_Note._--It has always been customary to put on parceling with the
lay of the rope in all cases; but rigging that you do not intend to
serve over, the parceling ought to be put on the contrary way.
=29.=--TO CLAP ON A THROAT AND QUARTER SEIZING.
Splice an eye in one end of the seizing, and take the other end round
both parts of the rope that the seizing is to be put on; then reeve it
through the eye, pass a couple of turns and heave them hand-taut; then
make a _marlinespike-hitch_ on the seizing, by taking a turn with the
seizing over the marlinespike, and laying the end over the standing
part; push the marlinespike down through, then under the standing part
and up through the bight again. Heave taut the two turns of the seizing
with the spike; pass the rest and heave them taut in the same manner,
making six, eight, or ten turns, according to the size of the rope;
then pass the end through the last turn, and pass the riding turns,
five, seven, or nine, always laying one less of the riding than of the
first turns; these should not be hove too taut--the end is now passed
up through the seizing, and two cross-turns taken between the two parts
of the rope, and round the seizing; take the end under the last turn
and heave it taut; make an overhanded knot on the end of the seizing,
and cut off close to the knot.
_Note._--When this is put on the end of a rope, and round the
standing part, it is called an end-seizing; if on the two parts below
the end, a middle or quarter-seizing. A throat-seizing is passed the
same way, but is not crossed with the end of the seizing.
=30.=--TO MAKE A TURK’S HEAD.
Turk’s heads are made on man-ropes, and sometimes on the foot-ropes
of jib-booms in place of an overhanded knot, as the Turk’s head is
much neater than the knot, and considered by some an ornament. It is
generally made of small white line. Take a round turn round the rope
you intend to make the Turk’s head on,--cross the bights on each side
of the round turn, and stick one end under one cross, and the other
under the other cross; it will then be formed like the middle figure in
the plate, after which follow the lead until it shows three parts all
round, and it is completed.
[Illustration:
Sheepshank.
Worming a Rope.
Serving a Rope.
A Strand.
Turk’s Head.
Putting a Strand in a Rope.
To form a Single Wall.
Single Wall.
To form a Sin. Wall & Cr’wn.
Single Wall and Crown.
Walled Crowned and Walled.
Double Walled and Double Crowned, or Manrope Knot.
To form a Matthew Walker Knot.
Matthew Walker Knot.
Sprit-sail Sheet Knot.
French Shroud Knot.
Shroud Knot.
Single Diamond.
Double Diamond.
Stopper Knot.
Buoy Rope Knot.]
=31.=--TO SHEEPSHANK A ROPE OR BACKSTAY.
This is intended for shortening a backstay; the rope is doubled in
three parts, as you see in the Plate, and a hitch taken over each bight
with the standing part of the backstay and jamed taut.
=32.=--TO PUT A STRAND IN A ROPE.
This is done in case of one strand of a rope getting chafed or magged,
and the other two remaining good. To perform this, you take your knife
and cut the strand at the place where it is chafed, and unlay it about
a couple of feet each way; then take a strand of a rope as near the
size as possible, and lay it in the vacancy of the rope, (as you see in
the Plate,) and stick the ends the same as a long splice.
=33.=--TO WALL AND CROWN.
Unlay the end of a rope, and with the three strands form a wall knot,
by taking the first strand and forming a bight; take the next strand,
and bring it round the end of the first, the third strand round the
second, and up through the bight of the first--this is a wall. (_See
Plate._)
To crown this, lay one end over the top of the knot, which call the
first, then lay the second over it, the third over the second, and
through the bight of the first. It will then appear as you see in Plate
No. 2.
=34.=--TO MAKE A MATHEW WALKER.
A Mathew Walker is made by opening the end of a rope, and taking the
first strand round the rope and through its own bight; then take the
second end round the rope underneath, through the bight of the first,
and through its own bight; the third end take round the same way,
underneath and through the bights of all three. Haul the ends well
taut, and it will appear as in the Plate. This is a good lanyard knot,
if well made.
=35.=--A SPRITSAIL SHEET KNOT.
Unlay two ends of a rope, and place the two parts which are unlaid
together; form a bight with one strand, and wall the six together
against the lay of the rope, (which is hawser-laid,) the same as you
would a single wall with three ends; after you have walled with the six
ends, haul them taut; you must then crown with the six ends, and it
will appear as in the Plate. To complete it, you must follow the lead
of the parts, and double wall and crown it.
This knot is frequently used in old-fashioned ships as a stopper knot.
=36.=--A SHROUD KNOT.
Unlay the ends of two ropes and place them one within the other, the
same as you commence to make a short splice; then single wall the ends
of one rope round the standing part of the other, and then wall the
other three ends in the same manner; the ends are opened out, tapered
down, and served over with spun-yarn. This knot is used when a shroud
is either shot or carried away.
=37.=--A FRENCH SHROUD KNOT.
Place the ends of two ropes as before, drawing them close together;
then lay the first three ends back upon their own part, and single
wall the other three ends round the bights of the other three and the
standing part; it will then appear like the figure in the Plate. The
ends are tapered as the other. This knot is much neater than the common
shroud knot.
=38.=--SINGLE DIAMOND KNOT.
Unlay the end of a rope a sufficient length to make the knot, and with
the three strands form three bights, holding the ends fast down the
side of the rope in your left hand, with the standing part of the rope;
then take the first strand over the bight of the second strand and
through the bight of the third; then take the second over the third
and through the bight of the first; then the third, over the first and
through the second. Haul these taut and lay the ends of the strands
up again, and it will appear as in the Plate. This knot is used for
jib-boom foot-ropes, man-ropes, &c.
=39.=--DOUBLE DIAMOND KNOT.
To make this, you make a single one as before; then take a marlinespike
and open the strands, and follow the lead through two single bights,
the ends coming out at the top of the knot; lay the ends of the strands
up as before, and it will appear as in the Plate.
=40.=--A STOPPER KNOT
Is made by double-walling and crowning, which has been described before
on another page. The ends, if very short, are whipped without being
laid up; but if long they are laid up and stopped.
=41.=--A BUOY-ROPE KNOT.
Unlay the strands of a cable-laid rope, take one strand out of the
large ones, and then lay the three large ones up again as before; take
the three small ones which were left out, single and double them round
the standing part of the rope; then take your spare ends, worm them
along the lay and stop them.
=42.=--COMMON SENNIT.
Sennit is made by plaiting rope-yarns together. (_See Plate No. 3._)
=43.=--A SEA GASKET.
A sea gasket is made by taking three or four foxes, according to the
size you intend to make the gasket. Middle them over a belaying-pin,
and plait three or four together, long enough to make the eye; then
clasp both parts together to form the eye; then plait it by bringing
the outside foxes on each side alternately over to the middle; the
outside one is laid with the right hand, and the remainder held
steadily--work the whole together, adding a fox when necessary. When
you have got it a sufficient length, diminish by dropping a fox at
proper intervals. To finish it, you must lay one end up, leaving its
bight down; then plait the others through this bight about one inch;
haul the bight taut to secure all parts--cut the ends off, whip it, and
it is completed.
=44.=--A PANCH, OR WROUGHT MAT.
A piece of six or nine-thread stuff is stretched in a horizontal
direction, and the foxes (according to the breadth you intend to make
the mat) are middled and hung over it; then take the fox nearest the
left hand and twist a turn in the two parts, and one part give to the
man opposite (two men being employed to work the mat); the next fox
has a turn twisted in its two parts, and one part given back to your
partner; the remainder are twisted round the first which are given
back, and then again round its own part, and so on with the remainder
of the foxes, until you get it the breadth you wish. At the bottom of
the mat selvedge it by taking a piece of nine-thread stuff, the same
as you used for the top. The two parts of the foxes which are twisted
together at the bottom are divided, and the nine-thread put between
them; the foxes are hitched round it, and the end put through its own
lay with a marlinespike; trim the ends off, and thrum it with pieces
of old strands of rope, cut in pieces about three or four inches long;
open the lays of the foxes with a marlinespike, push the thrums through
the lays, and open the ends out.
=45.=--HARBOR GASKET, OR FRENCH SENNIT.
A harbor gasket is made with foxes, something similar to the common sea
gasket,--but instead of taking the outside fox over all the rest, and
bringing it into the middle, you interweave it between them by taking
the outside fox of both sides, and taking it over one and under the
other, working it towards the middle, the same as common sennit.
=46.=--POINTING A ROPE.
Unlay the end of the rope a sufficient length for pointing, and stop
it; open the strands out into yarns, and take out as many as you think
it will require to make the knittles, by splitting the yarns and making
one knittle out of every outside yarn; when they are made, stop them
back on the standing part of the rope; then form the point with the
rest of the yarns, by trimming and scraping them down to a proper size,
and marl it down with twine--divide the knittles, taking every other
one up and every other one down; then take a piece of twine, called
the warp, and with it pass these turns very taut, taking a hitch with
the last turn every time you pass the warp, or filling. Then take the
knittles which are up and bring them down, and the ones which are down,
up; hauling them taut, and passing the warp every time over the lower
knittles; proceed in this manner until you get almost to the end,
reserving enough of the knittles to finish it with; leave out every
other bight of the knittles of the last lay, and pass the warp through
the bight, haul them taut and cut them off. A becket is sometimes
worked in the end.
_Note._--Knittles are made by laying rope-yarns together, with your
finger and thumb, against the twist of the yarn.
Snaking is for the better securing of a seizing, which is passed
round the single part of the rope and therefore cannot be crossed. It
is done by tucking the end part of the seizing _under_ and _over_ the
lower and upper turns of the seizing.
=47.=--TO MAKE A GROMMET.
A grommet is made by unlaying a strand of a rope and placing one part
over the other; with the long end follow the lay, until it forms a
ring, with three parts of the strand all round; finish it by knotting
and sticking the ends the same as a long splice. (_See plate No. 3._)
=48.=--TO PASS A ROSE LASHING.
It is used in lashing a strap or pudding round a mast or yard or the
parral lashing of a top-gallant yard; this lashing is passed crossways
over and under one eye, then under and over the other; the end part is
afterwards taken in a circular form round the crossing, and the end
tucked under the last part.
_Note._--This circular part is done to expend the end, instead of
cutting it off, so that it will answer again for the same purpose.
=49.=--TO WEAVE A SWORD MAT.
A piece of wood called a sword is used; this is put alternately between
the parts of the spun-yarn or sennit, stretched over two round iron
bolts (as you see in the figure); the warp of marline is placed through
the parts which the sword has opened, and jamed by it close to the
head; a piece of spun-yarn is put slack through the same division at
the opposite end and left there; the sword is taken out, passed under
and over the parts as before, and each end of the warp passed and
jamed taut. The piece of spun-yarn which was left at the opposite end,
is now lifted up, and brings the parts as they were first divided by
the sword; the warp is passed as before, and so on until the mat is
completed.
=50.=--A LASHING CLEAT
Is shaped like the figure in the Plate, having scores for the seizings
which are marked, and a groove cut in the part that fits next to the
shroud.
BLOCKS.
=51.=--A SHELL, PIN, AND SHEAVE.
Blocks are of different kinds, shapes, and sizes, according to the
several purposes for which they are intended.
A block consists of a shell, sheave, and pin; and from the number of
these sheaves it derives its name, viz.: a block with one sheave is
called single; with two sheaves, double; with three, treble; and with
four sheaves it is called a four-fold block. The shell of a block is
made of ash, and has one or two scores cut at each end, according to
its size; these scores are for the purpose of admitting a strap, which
goes round the block, in the centre of which is a hole for the pin;
the shell is hollow inside to admit the sheave. The sheave is a solid
wheel, made of lignum vitæ, iron, or brass; in the centre is a hole for
the pin, on which it turns. The lignum vitæ sheave is bushed with brass
or iron; round the circumference a groove is cut, that the rope which
goes over it may play with ease. The sheave is placed in the shell, and
the pin is put through both shell and sheave, which constitute a block.
=52.=--SINGLE, DOUBLE, AND TREBLE BLOCKS.
What is termed a single block has but one sheave, and if intended for a
double strap there are two scores on the outside of the shell. Single
blocks are more used than any other kind on board of a ship.
_A double block_ has an additional sheave; it is otherwise the same as
a single block.
_A treble block_ is made in the same manner as a double, with one
more sheave. Treble blocks are generally used as purchase blocks, and
strapped in the manner you see in the Plate.
=53.=--A SHOULDER BLOCK.
A shoulder block is the same as a single block, with the exception that
it has a projection at the bottom of the shell, called a shoulder, to
prevent the rope that reeves through it from jaming between the block
and the yard. These blocks are mostly used for bumkin or lift blocks on
lower vards.
[Illustration:
Common Sennet.
Sea-gasket.
A Wrought or Punch-mat.
Harbor gasket.
Pointing a Rope.
Grommet.
Strand.
Rose Lashing.
To weave a Sword-mat.
Cable-laid Rope.
Common Rope, or Plain-lay.
Shell.
Sheeve.
Single Bl.
Double Block.
Treble Block.
Bull’s Eye.
Shoulder Block.
Fiddle Block.
Shoe Block.
Sister Block.
Monkey Block.
Dead Eye.
A Heart.
Heart for a Collar.
Ninepin Block.
A Rack.
A Euphroe.]
=54.=--A FIDDLE BLOCK
Is made like two single blocks one above the other, the upper one being
the largest so as to allow the rope which is rove in the upper sheave,
to play clear of the rope in the under one. These blocks are used in
places where there is not space enough for a double one, or where it
(the double block) would be liable to split by not _canting_ fair, or
having room to play. These blocks are used for top burtons, &c. &c.
=55.=--A SHOE BLOCK
Is also made like two single blocks, but the sheave of the upper
one lies in a contrary direction to that of the lower one. They are
generally used as buntline blocks to courses; the buntline reeving in
the upper sheave, and the whip in the lower one.
=56.=--A SISTER BLOCK
Has two sheave-holes one above the other,--three scores for seizings,
one at each end, and one between both sheaves; they are hollowed out
on each side of the shell, to take the shroud. These blocks are used
as topsail-lift and reef-tackle blocks, and are seized-in between the
two forward shrouds of the topmast rigging, above the futtock stave.
The lift reeves through the lower sheave, and the topsail reef-tackle
through the upper one.
=57.=--A DEAD-EYE
Is a large round piece of wood with three holes in it, (as you see in
the Plate,) and a groove cut round it for the shroud to lie in. It is
used to turn in the ends of shrouds and backstays;--the three holes
are used to reeve the lanyard through, when setting up the shroud or
backstay.
A bull’s-eye is a kind of thick wooden thimble, with a hole in the
centre, and a groove cut round the outside for the rope or seizing to
lay in.
=58.=--A HEART
Is a block of wood with a large hole in the centre, at the bottom
of which are four or five scores, and round the outside is a groove
cut to admit a rope called a stay; there are other hearts called
collar-hearts, which are open at the lower ends, opposite to which
the lanyard is passed. This heart has a double score cut round the
outside, and two grooves cut on each side for the seizings to lay in,
which keeps the collar in the scores of the heart. Hearts intended for
bobstays should be made of lignum vitæ; those made of ash being liable
to split.
=59.=--A BELAYING-PIN RACK
Is a piece of wood with a number of holes through it, in which
belaying-pins are stuck; on the back part are several scores for the
shrouds to lie in to which it is seized.
=60.=--A EUPHROE
Is a long piece of wood, having a number of holes, through which the
legs of the crowfoot is rove,--a score is cut round it to admit of a
strap. This is used for the ridge of an awning.
=61.=--A HORN CLEAT.
Horn cleats are used for different purposes; some are made to seize on
to the shrouds; they are called _lashing cleats_; others are made to
nail on to different parts of the bulwarks. They are of different shape
and size, and used to belay various ropes to, in all parts of the ship.
=62.=--A B-CLEAT
Is a piece of wood scored out inside, something like the letter B, and
rounded off outside; they are used for leading a rope through, or for
keeping it in its place on the masts, bowsprit, &c.
=63.=--A STRAP FOR A BLOCK.
Straps are fitted in various ways, according to the use they are
intended for, and according to the size of the block.
A common strap is fitted in the following manner:--
First, cut the rope once-and-a-half the round of the block, then get it
on a stretch,--worm, parcel, and serve as near the end as possible, not
to interfere with splicing; then splice the ends together with a short
splice, and finish serving snug up to the splice. Stretch it and cut
the ends off, or you may serve over the ends, and it will appear as in
the Plate. If there is a number of those straps required, it would be
best to get the rope on a stretch, and serve off the required number
before cutting.
=64.=--A TAIL BLOCK
Is strapped with an eye-splice, snug round the block; the ends are
stuck but once; then scraped down, and served over with spun-yarn. Clap
on a stout whipping about six inches from the splice; open the ends
out, twist them into foxes, and plait them together, as mentioned for
gaskets; or, the strands may be opened out and marled down salvagee
fashion; tapering it a little towards the end of the tail.
_Note._--Blocks used for jiggers, have a double tail made in the same
manner.
=65.=--A PURCHASE BLOCK
Is double strapped, having two scores in the shell for that purpose;
the strap is wormed, parceled, and served, (sometimes only wormed and
parceled,) and spliced together. It is then doubled so as to bring
the splice at the bottom of the block. The seizing is put on the same
as any other; the only difference is, that it is crossed both ways,
through the double parts of the strap.
These block-straps are so large and stiff, that it requires a purchase
to set them securely in the scores of the block, and bring them into
their proper place.
=66.=--A TOP BLOCK
Is a single iron-bound hook-block, with (generally) a brass sheave; it
hooks to an eye-bolt in the cap. The top-pendants are rove through the
top-blocks when swaying up topmasts.
=67.=--A CAT BLOCK.
The cat block is three-fold, iron-bound, with a large iron hook
attached to it, for the purpose of hooking the ring of the anchor when
catting it.
On the forward side of the shell of this block are two small eye-bolts,
for the purpose of fitting a small rope, called the back-rope bridle,
used in hooking the cat.
=68.=--A SNATCH BLOCK
Is generally iron-bound, with a swivel hook; an iron clasp is fitted
on the iron band, or strap, with a hinge to go over the snatch, and
toggles on the opposite side, as you see in the Plate. The bight of a
hawser or large rope is placed in this block, when warping the ship, &c.
_Note._--There has been of late years several different improvements
made on these blocks.
Blocks of this description, and of a large size, are generally termed
“viol, or rouse-about blocks.”
=69.=--A NUN BUOY.
Buoys are used when a ship is riding at anchor, to denote the position
of the anchor. They are a kind of a cask, large in the middle, and
small at both ends; hooped close with iron hoops, and strapped with
rope well served. A buoy-strap is cut _nine times_ the length of the
buoy; this is sufficient to make the slings and hoops; the slings have
an eye spliced in each end, the hoops are rove through these eyes,
spliced together, and fitted on the buoy, as you see in the Plate.
=70.=--TO BEND A BUOY-ROPE.
The buoy rope is made fast with a clove-hitch round the arms of the
anchor, close up to the crown, and the end part stopped along the
shank, with one or two stops.
Some are fitted with a running eye, and when used this way the running
eye is rove round one arm, a hitch taken over the other, and seized in
the cross.
[Illustration:
Single Whip. Whip and Runner. Gun-tackle Purchase. Luff-tackle
Purchase. A Top Burton. A Long Tackle. Runner and Tackle. A
Lashing-cleat.
A Three-fold Purchase. A Jacob’s Ladder. A Nun-buoy. Pudding a Ring.
Buoy-rope Bend.
Catting an Anchor. Can Hooks. Barrel Slings. Hogshead Slings.
Horn-cleat. A B-Cleat. A Block Strap. Tail-block.
A Single Block. A Purchase-block. A Top-block. A Cat-block. A
Snatch-block.]
In large ships they are fitted with pendants and slip buoy-ropes; the
pendants have a large thimble spliced in one end, large enough to
receive a stout hawser, in case you should want to purchase the anchor
by the buoy-rope. The size for the slip buoy-rope is one-third the size
of the proper buoy-rope.
=71.=--TO PUDDING THE RING OF AN ANCHOR.
The ring of the anchor is well tarred, and parceled with tarred
canvass; then a number of lengths of old rope are cut three times the
diameter of the ring; these are laid on the ring, and stopped by a
temporary seizing in the middle; they are then placed fair by hand
round the rings, as you see in the Plate.
When one or two turns of rattling-stuff is taken round all parts, and
a heaver put through it, it is hove well round, which stretches all
parts snug round the ring. After it is all hove on neatly, put on the
seizings, four in number. (_See Plate._)
=72.=--A JACOB’S LADDER.
These ladders are used in many different parts of a ship of war; they
are used for stern ladders, rigging ladders, and on the swinging
booms in harbor, &c. There are several different ways of making them;
some are made salvagee fashion, and covered; others are made of
four-stranded rope, and have the rounds put through between the strands
of the rope. But the most general way of making these ladders, is to
take some small rope, (about two-inch stuff,) and make two straps the
length you intend to make the ladder, and splice them together with a
short-long-splice. The straps being made, get them on a stretch both
together, and see if they bear an equal strain; if not, shorten one
strap, so as to make both alike. Take a piece of chalk and mark off
where you intend the rounds to go, about fifteen inches apart.
The _rounds_ are pieces of round wood, about two inches in diameter,
of the length required, with a score on each end, for the rope to lay
in. Put the rounds in between both parts of the rope, exactly at the
chalk mark; having got them all placed, commence and seize them in, by
putting on a snug seizing of marline on each side of the round; you may
parcel, leather, or serve in the nips, just as may be preferred.
=73.=--CAN HOOKS
Are broad flat iron hooks, in the eyes of which thimbles are inserted.
What is termed a pair of can hooks, is a piece of rope four or five
feet long, or long enough to span a cask from chime to chime. When
fitted, one of these hooks are spliced into the end of this rope; it is
then got on a stretch, wormed, parceled and served, and a thimble is
sometimes seized in the bight, to hook on to, when lifting a cask.
_Note._--Some are fitted with chain, with a large iron ring in the
middle.
=74.=--HOGSHEAD SLINGS
Are pieces of rope about five fathoms long, and from five to six inches
in circumference, with a large thimble spliced in one end, and the
other end well whipped. They are used to sling large casks, being more
secure than can hooks. They are put on in this manner:--pass the bight
over one end of the cask, reeve the end through the thimble, and haul
it well taut; then take the end round the other end of the cask, and
take two half-hitches round the standing part, and it is done. (_See
Plate._)
=75.=--BARREL SLINGS
Are generally made of three inch rope, and of sufficient length to go
round the barrel. They are similar to a long strap, spliced together
with a short splice; it is passed round the barrel and one bight rove
through the other.
They are sometimes made long enough to sling two or three barrels at a
time.
=76.=--A SINGLE WHIP.
A single whip is the smallest and most simple purchase in use. It is
made by reeving a rope through a single block, as you see in the Plate.
=77.=--A GUN-TACKLE PURCHASE
Is made by reeving a rope through a single block, then through another
single block, and make the end fast to the one it was first rove
through, or splice it into the bottom of the block for neatness. (_See
Plate._)
=78.=--A LUFF-TACKLE PURCHASE
Consists of a double and single block; the rope is rove through one
of the sheave holes of the double block, then through the single one,
through the double one again, and the end made fast to the single
block, with a becket bend, to a becket in the bottom of the block.
(_See Plate._)
=79.=--A TOP BURTON
Is rove in the same manner as a luff-tackle purchase; the only
difference is, that the upper block of the burton is a fiddle block,
while that of the luff is a double one. (_See Plate._)
=80.=--WHIP AND RUNNER.
If a rope is rove through a single block, it is called a whip, as
before mentioned; and if the fall of this whip be spliced round the
block of another whip, it becomes whip on whip, or whip and runner.
(_See Plate._)
=81.=--A RUNNER AND TACKLE
Is the same purchase as a luff-tackle applied to a runner. A runner is
a large rope rove through a single block, with a hook spliced in one
end. (_See Plate._)
=82.=--A TWO-FOLD PURCHASE
Consists of two double blocks; the fall is first rove through one
sheave of the upper block, then through one of the lower ones; through
the upper one again, then through the lower one, and make the end fast
to the upper block.
=83.=--A THREE-FOLD PURCHASE.
A three-fold purchase is rove in this way, the blocks having one more
sheave, only that you commence to reeve the fall in the middle sheave
first,--instead of one of the side ones, which brings a cross in
the fall. The reason of its being rove in this manner, is, that the
heaviest strain comes first on the fall part, and if it was rove in the
side sheave, it would have a tendency to _cant the block in the strap_,
split the shell of the block, and cut the fall; but when it is in the
middle sheave it draws all down square alike.
=84.=--NAMES OF ROPES.
The different kinds of ropes are designated as follows:--
Hawser-laid and cable-laid rope is all the same; it is composed of
nine strands, each strand having an equal number of yarns. These nine
strands are laid into three, by twisting three small ones into one
large one; then the three large ones are laid up, or twisted together
left-handed, which makes the nine strands; this is a hawser-laid, or
cabled, rope.
A common or plain rope is composed of three strands, of an equal number
of yarns twisted together.
Shroud-laid rope is made in the same manner, only that it consists of
four strands instead of three, and a small strand which runs through
the middle, termed the heart of the rope. When plain-laid rope is laid
up left-handed, it is called _back-laid rope_. There is also four
stranded hawser-laid rope, which is used for stays, &c., &c.
[Illustration]
[Illustration: A Ship Ready for Launching.]
PART II.
=85.=--LAUNCHING A SHIP.
After the carpenters have completed the hull of the vessel, the
necessary preparations for launching are commenced as follows:--
Get an anchor on each bow; get the cables on board and bend them to
the anchors; range and bitt the cables; bend the buoy ropes, and see
everything clear for letting go the anchors.
It will then be necessary to get four stout hawsers on the spar deck,
two on each side; bend one to the other, and have them coiled down
clear for running. This being done, pass the ends of two hawsers
out forward, through the warping chocks on each bow; pass the ends
aft, one on each side, and make them fast to some secure place, on
their respective sides of the launching slip, as clear of the ways
as possible. Stop the bights of the hawsers with a single rope-yarn
up along the ship’s sides, so as not to interfere with the ways, or
interrupt the progress of the carpenters while knocking away the shores
previous to launching.
Have men stationed to attend to veering the hawsers and cables when the
ship is off the ways, and also to letting go the anchors, if necessary.
Have a few buckets of water ready to throw on the bitts, to prevent any
danger that might occur from fire while veering the hawsers and cables.
The ways being well greased, and the necessary preparations for
launching completed, all the blocks and wedges by which the ship was
formerly supported, are driven out from under her keel, until the whole
weight gradually subsides upon the sliding ways, or cradle; a few
shores, or stanchions, remain, by which she is retained on the stocks
until the period for launching arrives, which is generally at high
water; they are then cut away, and all obstructions removed, with the
exception of the _dogshore_ (a representation of which is given in the
Plate). The word is given “to _launch_”--the dogshore is then knocked
away, which causes her to advance down the inclined plane into the
water.
If the ship should _hang_ after the dogshore is removed, it will be
necessary to apply screws under the fore-foot, which will cause her to
move immediately along the ways. The ways generally extend a sufficient
depth under the surface of the water to float the vessel when she
arrives at the extreme ends.
When the ship is off the stocks “veer away roundly,” and do not attempt
to check her until she begins to _deaden her way_, then check her
“handsomely” with the hawsers so as not to part them; if, however, they
should part, let go an anchor immediately; if that should not bring her
up, let go the other anchor, and veer gradually on both _cables_ until
she is brought up.
_Note._--When a ship is to be launched it is always customary to
hoist the ensign, jack, and pennant; the jack forward, ensign aft,
and the pennant amidships. Flagstaffs are erected for that purpose
previous to launching, as represented in the Plate, where you see a
ship of war ready to be launched from the stocks.
=86.=--CUTTING OUT STANDING RIGGING.
_Lower Rigging._--Measure the distance from the larboard side of the
mast-head to the foremost dead-eye in the starboard channels, which
distance set off on the floor of the rigging loft and stick in a
marlinespike at each extremity. The shroud stuff being stretched,
stop one end to one of the marlinespikes; take the bight round the
other and back again: this is the first pair of shrouds; pass it round
again, _outside at each end_, for the second pair, and continue in
this manner until one gang of rigging is completed. Mark the length of
the eyes straight across at the _opposite end_, to the one stopped to
the marlinespike; cut at the latter in an angular direction (so that
the after-legs will be a little longer than the forward ones), and
the inside pair will be the first pair of shrouds. Hitch a piece of
spun-yarn round each shroud, in the centre of the eye, making knots
on it according to the number of the shroud, commencing the inside
pair with one knot. The mark for the length of the eye gives the place
for the eye-seizing; the round of the rope giving their place on the
mast-head. (_Old fashion._)
The proportion for the eye is the round of the mast-head above the
bolsters; I have also seen the breadth of the seizing added (some allow
five squares of the mast-head, which is the best rule), supposing it
would lay fairer on the side of the bolsters than too close to the
mast-head. This precaution is hardly necessary, as the rigging will
stretch sufficiently in pulling up to bring the seizing down, no matter
how much it may have been stretched before being warped round for
cutting.
[Illustration: Sketch of a draft for cutting rigging.]
Rigging cut on the above old plan, causes great waste in squaring off
the ends, after fitting the eyes, previous to turning-in the dead-eyes.
I would therefore recommend (if not in a great hurry) a more economical
plan. Get the shroud-warp on a stretch, or rather one end of it, long
enough for one pair of shrouds; mark off the distance for the required
service, and when completed--being wormed, parceled, and served, while
on a taut stretch--measure the length with a tape-line, from _draft_
of first pair of shrouds, No. 1 starboard; when measured and chalked
the required length, “come up the stretch,” and cut at the chalk-mark;
middle the shroud at the centre of the service, and lay it on the loft
floor. Continue fitting, and cutting, in this way until you get the
number of shrouds required for the gang, allowing each pair of shrouds
to lap over the diameter of the rope at the eye, as they are laid on
the loft floor; alternately making due allowance at the ends, before
cutting, for the carry aft, or the jump of a port, if required. (_See
Plate._)
_Note._--In measuring the length of the shrouds, some prefer the
distance from the opposite side of the mast-head to the partners,
added to half the breadth of the deck, from the mast to the side.
In parceling, begin at each end where the service is to leave off,
and parcel upwards to the middle of the eye, where commence serving
downwards on each leg. The eye seizings are round ones, and when put
on, the whole eye is neatly covered with parceling. A half-sister
block is sometimes put between the two forward shrouds, for the lower
boom topping lift to lead through.
=87.=--TOPMAST AND TOP-GALLANT RIGGING
Is cut in the same manner. In fitting the topmast rigging, always
seize-in a sister-block between the two forward shrouds, for the
topsail lift and reef tackles. The swifters are generally served the
whole length.
The eyes of the top-gallant rigging are made to fit exactly around the
cylinder; if there is an odd topmast, or top-gallant shroud, on each
side, they are either fitted with a horse-shoe eye, or go together with
a cut splice.
=88.=--BREAST AND STANDING BACKSTAYS.
These may be cut by the same rule; the eyes of the breast backstays are
fitted in different ways. They are sometimes spanned together, making
a square, the size of the mast-head; sometimes they have an eye like
the shrouds, made to fit close; and others have a small eye seized in
the bight, and lashed round the mast-head. The eyes of the standing
backstays are fitted like those of the shrouds.
=89.=--CAT HARPEN LEGS, AND FUTTOCK SHROUDS.
Take one-third the breadth of the top, and lay of that distance from
the eye-seizing, down upon the shrouds, each side; draw a line across
which will represent the cat harpens, and measured on the scale, will
give their length; splice in eyes at each end; worm, parcel, serve, and
leather them. The distance from the extremity of the top and this line
upon the shroud, will give the length of the futtock shrouds, which
must have a hook and thimble in their upper ends, and a thimble in
their lower ends.
=90.=--FORE-AND-AFT STAYS.
Measure from the after parts of the mast-head to where the stays set
up, and to this distance add the length of the mast-head, for collars.
Collars for stays are the length of their respective mast-heads. The
mousings are raised once-and-a-half the size of the stays, and at a
distance equal to twice the length of the mast-head from the mousing.
A Flemish eye is worked on the end, and the stay rove through it; or
they may be fitted with lashing eyes, in which case each leg is the
length of the mast-head; the service is continued the length of the
eye below the mousing, the collars leathered, and the hearts turned
in with the lay of the rope. Stays are wormed, parcelled, served, and
leathered in the wake of all nipps, such as the bees, bullock-blocks,
and sheave-holes.
=91.=--CUTTING LOWER MAST HEAD-PENDANTS.
The forward pair should be twice the length of the mast-head--the after
pair twice-and-a-half; thimbles are spliced in the ends, and they are
wormed or spanned together, so as to form a span to fit the mast-head.
=92.=--BOBSTAYS.
The bobstays are cut twice the length from the collars, on the
bowsprit, to their respective holes on the cutwater. They are wormed,
parceled, and served the whole length, and leathered in the nipp, after
which they are rove through the holes, spliced together, and the dead
eyes turned in, in the wake of a splice.
=93.=--BOWSPRIT SHROUDS.
The length from the bowsprit to the eye-bolts in the bows; a dead-eye
or heart is spliced into one end, and a hook and thimble in the other.
=94.=--JIB AND FLYING JIB GUYS.
Take the distance from the boom-end to the bows, making a small
allowance for reeving through the straps on the spritsail yard. They
are generally fitted with a cuckold’s neck over the boom end, and set
up with dead-eyes to the bows. The cuckold’s neck is served or covered
with canvass. The guys in the wake of the spritsail yard are leathered.
The martingales must be cut, and fitted to the manner in which they are
rove.
=95.=--CUTTING RUNNING RIGGING.
The greater part of the running rigging may be cut as it is rove,
making due allowance for the hands to clap on. The length and size may
also be got from the rigging table for all classes in the navy (see
rigging tables). The most proper way to ascertain the length of a rope
is from the _draft_, or rigging plan of the vessel you are employed
upon, making the proper allowance for leading out, &c., &c.
=96.=--RIGGING SHEERS, AND TAKING IN MASTS AND BOWSPRIT.
In cases where there is neither sheers nor wharf to have recourse to,
in order to get the lower masts on board, it becomes necessary to get
such spars as can be procured, and erect a pair of sheers on board for
that purpose.
In doing this proceed as follows:--Take in a sufficiency of ballast to
steady the ship, and shore the decks from the skin up, particularly
abreast of the partners. Sling skids up and down the sides; reeve the
parbuckles, and bring the sheer legs alongside, with their small ends
aft; parbuckle them on board, raise one leg over the capstan, and their
heads or after ends resting either on the taffrail, the break of the
poop, or a spar placed in the most convenient spot, the more elevated
the better. Square the heels exactly one with the other, so that when
they come to be raised the legs may be found of equal height.
As near the after ends of the spars as may be considered necessary,
when crossed, put on the head-lashing of new, well-stretched rope
(_figure-of-8 fashion_), similar to a racking seizing, and cross with
the ends. Open out the heels, carrying one over to each gangway, and
placing it on a solid piece of oak or shoe, previously prepared for
the purpose. Clap stout tackles on the heels, two on each, one leading
forward, the other aft; set taut the after ones, and belay them. Lash
a three or four-fold block, as the upper one of the main purchase,
over the main lashing (so that it will hang plumb under the cross),
with canvass underneath to prevent chafing; and in such a manner that
one-half the turns of the lashing may go over each horn of the sheers,
and divide the strain equally; also sufficiently long to secure the
free action of the block. Lash the small purchase block on the after
horn of the sheers, sufficiently high for the falls to play clear of
each other, and a girtline block above all.
Middle a couple of hawsers, and clove-hitch them over the sheer
heads--having two ends leading forward, and two abaft, led through viol
blocks, and stout luffs clapped on them. These should be sufficiently
strong to secure the sheers while lifting the masts.
The lower purchase block is lashed forward (perhaps round the
cut-water), and the fall being rove, the sheers are raised by heaving
upon it, and preventing the heels from slipping forward, by means of
the heel tackles previously mentioned.
Sometimes a small pair of sheers are erected for the purpose of raising
the heads of the large ones; in which case care must be taken to place
them so as to allow the heads or horns of the other pair to pass
through.
When the sheers are up, or nearly perpendicular, _cleat the shoes_, so
as to confine the heels to their places upon them. They can then be
transported along the deck by means of the heel-tackles and guys to the
situation required, taking care to make them rest upon a beam, and to
have the deck properly shored up below.
Finally, give the sheers the necessary rake by means of the guys, and
set taut all the guys and heel-tackles. Also, five or six feet above
the deck, on each leg, put two cleats, for the purpose of applying two
stout lashings from _them above_, to the dead-eyes in the channels
_below_, in order to give greater security; this being done, the sheers
may be considered ready. (_See Plate_).
[Illustration: Masting and Dismasting.
FIG. 1.
FIG. 2.
FIG. 3.
Method of forming Sheers, and removing a Mainmast, by means of 2
Topm’st]
_Note._--The skids which are slung up and down the sides, are for
the purpose of keeping the sheer-legs clear of the channels, and
from thence to the plank shear. Mats should also be placed over the
quarter galleys to prevent injury.
_Parbuckles_ are hawsers which are middled; the ends of which are
taken through two ports which are about five or six ports apart, from
outside, in; down over the rail, under the sheer legs; up again through
snatch blocks, in the opposite water-ways, and luffs clapped on them.
The counter parbuckles are used to ease the sheer legs down on deck,
and are rove through the gun-deck ports. Mats should be placed in the
wake of the chafe, where the parbuckle leads over the rail, or up
through the gun-deck ports.
The parbuckling on board of heavy spars for sheers may be much
facilitated at times, and injury to the ship avoided, by attending to
circumstances, and getting them in at slack water, or over the bows or
stern.
When a ship is confined to her own resources, the lower yards are the
best spars for sheers; the heels (or yard-arms resting on the deck)
being strengthened where they taper by a temporary fish, _woolded on_,
and the woolding set up by wedges.
In a brig, the main yard and main boom are the best spars for sheers
(if other spars are not available).
The shoes are made of either stout oak plank or beam timbers of pine,
and long enough to extend over at least three beams, with a saucer in
them for the heels to rest in; likewise, mortices or bolts in each end
for lashing. The spare caps will be found very handy for placing the
heels of the spars in, and the eye-bolts in them convenient for hooking
the heel-tackles, and transporting along the decks.
[Illustration]
[Illustration]
=97.=--TO TAKE IN THE MIZEN-MAST.
Tow the mizen-mast alongside, with the head aft, and the garland[1]
lashed on to the forward part of the mast, at the distance from the
tennon to just above the spar deck partners; lash a pair of girtline
blocks on the mast-head, and reeve the girtlines; bend the sheer-head
girtline to the mast below the bibbs to _cant_ it. Overhaul the main
purchase down abaft, thrust the strap through the eyes of the garland,
toggle it, and secure the toggle by a back-lashing. Take the fall to
the capstan and “heave round;” when the heel rises near the rail, hook
on a heel-tackle to ease it inboard. Get the mast fair for lowering
by means of the girtlines, have carpenters attending below, wipe the
tennon dry, and white lead both it and the step, “lower away,” and step
the mast.
Pass a couple of straps around the mast; to each of these hook the
double blocks of the pendant tackles--the single ones to the sides,
and hauled taut; wedge the mast temporarily, “come up” the purchases,
man the guy and heel tackles, wet the decks, and transport the sheers
forward for taking in the main-mast.
The object of taking in the mizen-mast first is, because the breadth of
beam is less aft than forward; and the heels of the sheers being spread
more as they go forward, the head lashing consequently becomes tauter;
moreover, if the mizen-mast was taken in _last_, the bowsprit must be
got in _first_, and thus the _advantage_ of securing the sheers to the
foremast-head, when getting in the bowsprit, would be lost.
[1] Garlands are made of new rope, well stretched (salvagee fashion),
marled together and parceled. They are laid on the forward part of
the mast, a stout lashing put on over all, and crossed between the
garland and the mast;--a good dogging also, if necessary, passed
downward.
=98.=--TO TAKE IN THE MAIN AND FOREMAST.
Proceed in the same manner as in getting in the mizen mast. The garland
for the small purchase should be lashed about the diameter of the mast,
_above_ the main purchase.
In taking in either of the masts, if the sheers should be found to
be a few inches short, the difficulty may be remedied by manning the
forward guy-falls, and bringing the sheers perpendicular to the deck.
Some distance may also be saved by using no garlands and having the
purchase blocks lashed to the mast. If in lowering there should still
be a difficulty, chocks might be placed on the kelson until the tennon
rested on them; then steady the mast by means of the small purchase and
sheer-head girtlines, while the main purchase is unlashed, and lashed
again on the mast sufficiently high to step it.
If the ship has a top-gallant forecastle, it would be well to step the
mast forward of the sheer legs, for the brake of the forecastle comes
abreast of the partners; and, in a case of this kind, it would be well
to take in the foremast first.
=99.=--TO TAKE IN THE BOWSPRIT.
Transport the sheers as far forward as possible, or as the bows will
permit; send a hand to the sheer-head, bend on the girtlines to the
small purchase block to light it up, unlash it, and lash it again
to the forward fork or horns of the sheers, pass a strap round the
foremast-head, to which hook a large tackle, carry it well aft, and
haul it taut, for the purpose of staying the mast. Lash a couple
of large single blocks to the foremast-head, middle a hawser, and
clove-hitch it over the sheer-head; reeve the ends through the blocks
at the mast-head, down on deck, carry them well aft, and take a turn.
Hook the after heel-tackles forward, and take the after-guys aft;
pass a bulwark lashing round each heel, rake the sheers over the bows
sufficiently for the main purchase to hang directly over the gammoning
scuttle, and make all fast.
The bowsprit being brought under the bows, with the head forward, and
the garlands lashed on, the main one a little more than one-third from
the heel, the smaller one between the cap and bees, having guys leading
from the bowsprit to the cat-heads, and a couple of straps round the
heel for hooking the bedding tackles. Overhaul down the purchases
and toggle them; “sway away,” attending it by the guys, until nearly
perpendicular; hook on the bedding tackles, which are taken from the
bitts on the main deck, and led up through the partners; wipe the
tennon dry, and white-lead both it and the mortice; “lower away,”
bouse upon the bedding tackles, and bring it into its place; come up
purchases, guys, unlash garlands, and proceed to dismantle the sheers.
If the ship has a topgallant forecastle, you will be unable to take in
the bowsprit with the sheers without the assistance of a _derrick_[2]
on account of the brake of the forecastle, it not being prudent to step
sheers on the top of it.
When the ship is masted, and alongside the yard, commence getting
on board and stowing ballast and tanks; fit the rudder, gammon the
bowsprit, fit and set up the bobstays and bowsprit shrouds; fit fore
stay collars; get on board tops, caps, cross-trees, topmasts and
topgallant masts, placing lower yards athwart ships, topsail and
topgallant yards amidships; also, have ready tackles and luffs for
setting up the rigging and staying the masts, top-blocks with lashings
for top-ropes, and all the rigging at hand and in order.
[2] See Derrick, in Miscellaneous Articles.
=100.=--GAMMONING THE BOWSPRIT.
In rigging a stage under the bowsprit for this purpose, make use of two
small spars, such as topgallant studding-sail booms, with their heels
lashed to the head-rail, their heads frapped together, and slung from
the bowsprit end, and boards laid across from one to the other.
The gammoning is of new, well-stretched rope, generally water-laid.
One end of the gammoning being whipt, is passed through the hole in
the cutwater, and over the bowsprit with a round turn, then clenched
round the bowsprit close against the stop or cleats; the other end
passes through the forepart of the hole in the cutwater, again round
the bowsprit (but before the clinch), and again through the hole in the
cutwater, abaft the first turn. All the succeeding turns go in the same
way, laying forward on the bowsprit and aft in the cutwater, and all
are passed inside of the first turns; by which means the outer turns on
the bowsprit which bear the most strain are more preserved from chafing
than the inner ones.
[Illustration: A Representation of the Masting Shears in the New-York
Navy Yard, for the Masting and Dismasting of large ships.]
The turns are then hove taut as follows:--A leading block is made
fast to the holes for the bobstays by a strap long enough to admit of
the pendant, which is then rove through it, leading straight through
the hawse-hole to the capstan. In one end of this pendant an eye is
spliced, through which a bight of the gammoning is passed, and retained
by means of a toggle, while to the other end is hooked a long tackle,
and the fall led to the capstan. As each turn is hove taut, it is, by
some, nailed to the bowsprit, and by others, racked in several places,
which is preferable to nailing.[3]
When all the turns are passed and hove taut, they are frapped together
by as many crossturns as are passed on the bowsprit. The end is then
whipped and seized to one of the turns.
In ships with two gammonings, the outer one is hove taut first, as it
would otherwise slack the inner one.
_Note._--Iron gammoning is now allowed for vessels of all classes in
the service. (_See Rigging Table._)
[3] See Gammoning the Bowsprit, in Miscellaneous Articles.
=101.=--FITTING RIGGING.
The shroud is hove well taut, with a tackle clapped on one end, and the
other secured to a sampson post. It is wormed, parceled, and served a
third down from the seizing; the swifter or foremost shroud all the
way, except where the dead-eye is turned in. A sword mat is sometimes
laced on the foremost shroud, which, I think, answers much better, as
it can be taken off and the rope dried; and, from the different ropes
I have seen rotted under the service, I feel convinced, the less on
rigging, unless where absolutely necessary, the better.
In parceling the eyes, commence from each end of the service and finish
in the centre, and pass several riding parts, as in breaking the shroud
to form the eye, the service gets opened, which allows the wet to get
in; and if the service is begun in the centre, doubled, and then passed
toward each end, it will prevent the wet getting to the rope.
In forming the eye, take a good strand, knot both ends together, and
lay it across both parts of the shroud; having brought them as close
together as possible, pass both bights of the strand under the shroud
clear of each other; then place a long bolt across, close to the strand
on the upper side; take a round turn round the bolt with each bight of
the strand on each side of the shroud, put a smaller bolt through each
eye in the strand, and _heave it round_ the long bolt, and as the turns
accumulate on the bolt, both parts of the shroud come together; when
quite close pass the eye seizing, the shroud being previously parceled
in the way of it.
When there is an odd on each side, it is fitted horse-shoe fashion to
fit the mast-head; parceled, and served over a third down the same as
the other shrouds. I have seen the odd shroud put on the mast-head
first (after the pendants), instead of last; and then the others put on
in rotation: No. 1 starboard, No. 2 larboard, No. 3 starboard, &c., &c.
=102.=--FITTING MAST-HEAD PENDANTS.
The long leg, when two, should be a third of the shroud. The eye is
formed the same as the shroud: wormed, parceled, &c. A thimble is
spliced in each end, the ends put in once and a-half, marled down, and
served over. The foremost leg is once and a-half the round of the rope
shorter than the after one. The thimbles are well parceled before being
spliced in.
Small ships have only one pendant on each side; when this is the case,
the rope is cut to the proper length, the starboard pendant is spliced
into the larboard, and the larboard into the starboard, with a cut
splice forming an eye, or span, to fit the square of the mast-head; a
thimble is spliced into each end, and they are wormed, parceled and
served;--they are the same length as a long leg, when a pair on each
side.
=103.=--LOWER AND TOPMAST STAYS.
Stays are four stranded, and are now both the same size, and lashed
abaft the mast-heads. The legs are made for the collar in laying up.
When sufficient length is laid up for the stay, from whence the collar
commences to the end for setting up, two strands, one for each, are
left sufficiently long to double back, and are then laid up as four
strands, forming the lashing eyes and legs. The ends of the strands
are then unlaid, the inside ones wormed into the lay of the rope; the
other strands are divided, laid up, and worked in alongside the first
strands; then some more yarns are twisted smaller and used as backing;
some inside yarns from each strand should be wormed into the stay their
whole length, below the crotch; the legs are then wormed, so as to
completely fill the rope, commencing from the centre of the eyes for
lashing, which should be well opened with a large setting fid, and
worming carried into the stay as far down as the worming of the legs.
The outside yarns of the legs are then marled down, over all, round the
stay, tapering the ends. The legs are well parceled and served, and
likewise the stay, sufficiently far down to take the lower yards, and
covered with tanned hide.
The stays should be hove well out with purchases, and allowed to hang,
pulling up occasionally. I have known a line-of-battle ship’s stays
(cable laid rope) to stretch out twelve feet, and after a two month’s
cruise were long enough to allow nearly two feet to be taken off the
fore-stays.
Stays fitted with lashing eyes are decidedly preferable, as they are
easier shifted; the collars not being so long the yards can be slung
higher up, and consequently braced further forward.
In the merchant service the stays are also fitted on the bight, or two
in one, as follows: the bight is put over the mast-head and both ends
taken forward and set up in their respective places. Others again put
the bight under the bowsprit and set them up abaft the mast head, with
lashing eyes, putting on a seizing at the proper place to form the
collar. This last plan would not answer for a ship of war.
=104.=--TO RIG THE FOREMAST.
White-lead the mast-head in the wake of the trestle-trees, over haul
down the girtlines, bend on the trestle-trees and sway them on board;
take out the after chock, wipe them dry, bend the girtlines to the
forward part and stop the girtlines to the after part; bend the main
girtline to the after part also; “sway away,” having a steadying-line
forward to keep the trestle-trees from catching under the bibbs, for if
they should be heavy, one man aloft will not be able to bear them off;
when above the bibbs, send a hand aloft to slip the stops, one at a
time, so as to let them come down gradually. “Lower away,” bouse on the
after girtlines, and get the trestle-trees in their places; send aloft
the after chock, ship and bolt it. Tar the mast-head in the way of the
rigging; overhaul down the girtlines for the bolsters, which are tarred
and parceled; sway them aloft and stop them; lash the girtline blocks
to the after part of trestle-trees.
The rigging is then sent up by the girtlines in the following manner:--
_Mast head pendants._--Foremost pair of shrouds, starboard side;
foremost pair of shrouds, larboard side; second pair of shrouds,
starboard side; second pair of shrouds, larboard side, and so on
until all the shrouds are over, after which send up the stay, and
last of all the preventer or spring-stay.
_Placing the rigging._--The girtlines being overhauled down send
aloft the lower pendants, which have got a long and short leg, fitted
together with a span, or square, the size of the mast-head; the long
leg is placed abaft, so that in case of the forestay being shot away,
the pendant tackles can be hooked in them without being in the way
of the fore-yard in bracing; while the leg being abaft, the mast
affords them good security. As soon as the mast-head pendants are
placed they ought to be lashed abaft, the tackles hooked, and the
mast stayed by them. Overhaul down the girtlines, bend the mast-head
one on the shroud, with a timber-hitch, or toggle, four or five feet
below the seizing, and stop it to the centre of the eye; take the
girtline from the after trestle-tree, and bend it half way down the
shroud; “sway away,” on the lower girtline, and lift the weight of
the shroud. When high enough, the stop in the eye is cut, and it will
fall over the mast-head; the men on the trestle-trees placing it fair
on the bolsters, beating it well down, with commanders, and observing
to have the eye-seizing come as near the centre of the mast-head as
possible. The larboard pair is got up in the same manner, and so on
until all are placed. Reeve the lanyards, if prepared with a knot on
the end; a double-wall and crowned is preferable, a mathew-walker
being liable to capsize; the lanyard should be rove through the hole
under the end of the shroud, because in setting it up, the strain
comes on the shroud first, and keeps the dead-eye in its place; if
put under the standing part, the strain coming on the end first, the
dead-eye would _slue round_.
_Setting up the lower rigging._--The rigging is often placed and then
set up, but I would prefer (if time would permit) having it pulled up
as placed. When the first pair on each side are over and placed, and
the lanyards rove through both dead-eyes, clap a selvagee strap on
each shroud well up; to this hook the single block of a luff tackle;
the double, to a blackwall hitch in the lanyard; then take the lower
blocks of the pendant tackles and hook them to both the falls of
the luffs on each side; reeve the tackle falls through the leading
blocks, and pull up, setting up both pair of shrouds at the same
time, the men on the trestle-trees beating the shroud down as pulled
up; when well up, place two pair more, and proceed in this manner
until the mast is rigged.[4]
The advantage of pulling up a pair at each side, instead of singly,
is evident from the fact that pulling up singly injures the seizing;
as it is first dragged _forward_ and then _aft_ by the after leg, it
is liable to slack the seizing, and perhaps snap the inside turns.
In rigging the lower masts, I have seen the after swifter go over
first; a plan that is now adopted in small vessels. In staying the
mast these swifters should be set taut, the mast being previously
wedged, and the stays set steadily up. I have heard some old sailors
dispute this plan, it being new, but for my own part I think well of
it.
_Note._--The trestle-trees might be got over without knocking out the
after-chocks, by running up a derrick abaft the mast, well lashed
abaft below the bibbs, having chocks placed between it and the mast,
sufficient to admit of the free passage of the after chock of the
trestle-trees. They are sometimes got on before getting in the mast,
but they then bring in an additional and unnecessary weight upon the
mast-head, and moreover, in lowering, catch over the shear-head.
N. B. The blocks for _topmast stays_ should be put on _after_ the
second pair of shrouds (on foremast).
[4] See note on lower rigging.
[Illustration]
=105.=--FUTTOCK SHROUDS
Are now fitted, and hooked to the futtock plates in the top, and set up
to an iron band round the mast. In small vessels these are iron, and
set up with turnbuckles, or screws. Cat-harpens are seldom used, being
considered unnecessary lumber aloft.
_Note._--The futtock shrouds are hooked to their respective plates,
_with the points of the hooks in_.
=106.=--TO RIG THE MAIN AND MIZEN-MAST.
Proceed in the same manner as directed for the foremast. The mainmast
of a frigate has one more pair of shrouds than the foremast, and the
mizen-mast three less. The mizen-mast has only one pendant on each
side, fitted with a cut-splice, and a thimble spliced in each end. The
rigging is placed the same as the fore or main; the mast is steadied
into its place with a couple of long burtons, one to each pendant, and
hooked to straps round the bitts, or to ring-bolts in the fore part of
the quarterdeck bulwarks. If the stays are not ready for going up, the
tackles can be hooked to a lashing round the mast, the pendants being
wanted to pull up the rigging (for placing); the rigging is the same as
the fore.
In setting up the main-stays, pass one _under_, the other _over_,
around the cross-piece in the four bitts, for the purpose; clap the
selvagee straps well up the stay, and two more near the ends; to these
hook two luffs; to the falls of the luffs hook the lower blocks of main
tackles; reeve their falls through leading blocks, in as direct a line
with the stay as possible, and grease the bitts in the way of the stay.
In placing the main stays, in the manner mentioned above, there is
sufficient space between the stays for a shot to pass through, which
often prevents their being both cut away at the same time.
When the rigging is to be set up for a full due, the stays in the way
of the bitts are well wormed, parceled, served, and covered with hide;
and the ends of the stays, and all the lower rigging whipped, and
covered with canvass caps (neatly fitted).
=107.=--TO RIG THE BOWSPRIT.
[Illustration]
_Bobstays._--The rope should be well stretched, wormed, parceled,
and served, and in the way of the cutwater covered with leather;
when none is to be had, pass two parts of parceling, the first
against, the second with the lay of the rope; and serve with good
stout spun-yarn, or four-yarn plait; then reeve them through the
cutwater, splice both ends together, put the strands in once each
way, marl down, and serve over. The hearts are then secured in their
place (keeping the splice on the upper side) with a round seizing,
with parceling under it. They are sometimes fitted to shackle to the
cutwater, with iron plates let in flush with the wood, a bolt going
through both plates, which is very snug and strong.
_Bowsprit Shrouds_ are single pieces of rope. When cut the required
length (a hook and thimble), the latter parceled, is spliced into one
end, put in once-and-a-half, marled down and served over; a heart is
spliced into the other. After being hooked to eye-bolts in the bows
for the purpose, they are set up to their collars on the bowsprit.
A celebrated master (now a commander) in the navy, and a first
rate seaman, never served the bowsprit rigging _all over_; it is,
certainly, in my opinion, better not to do so, as the water can never
lodge, which it may do, by getting in from broken service, which
cannot be repaired at sea. They are now fitted one-third chain, on
account of the chain cable chafing against them.
It is not unusual, in small vessels, to insert thimbles instead of
hearts in the bobstays, bowsprit shrouds, and collars; covering the
lanyards neatly afterwards, with canvass.
_Placing the rigging._--Tar well the bowsprit; then put on the first
forestay collar, first pair bowsprit shroud collars, first bobstay
collar; second bobstay collar; second pair of shroud collars;
spring-stay collar; and cap bobstay collar; then heave them close up,
pass and heave well _on_ with a rose-lashing.
The man-ropes are spliced, or hooked into bolts in the bowsprit cap,
and in the other end an eye is spliced; ends put in once-and-a-half,
and set up with a lanyard to an eye-bolt in knight-heads or
stanchions, for the purpose; splices served over, and leathered in
the nip.
The goblines[5] are either clove-hitched, or may be fitted with a
cuckold’s neck around the end of the dolphin-striker, and set up to
the bows, one on each side.
[5] Called back-ropes by some.
=108.=--GETTING THE TOPS OVER.
_Whole tops._--Overhaul the girtlines for the cross-trees, white-lead
the squares in the trestle-trees, and ship them. The girtlines being
on each side of the mast-head are then overhauled down for the tops;
one end is passed from underneath, and up through the hole for futtock
plate and hitched to the standing part; the girtline can be rove down
through one of the holes in the edge of lubber’s hole; the girtline
stopped to the foremost edge, to holes bored for the purpose. A
girtline is taken from the mizen-mast-head, and bent to the foremost
part of maintop; bend on a tripping line to the pigeon hole leading
from the foremast-head. Man the girtlines and “sway away;” when
sufficiently high to allow the foremost edge of lubber’s hole to clear
the mast-head, cut the stops and cant it over by the tripping line, and
the top will hang in the girtlines, when it can be lowered, placed, and
bolted.
I have seen girtlines bent from the foremost part of the fore-top to
the bowsprit end; and from foremast to the forward part of the maintop;
and from mainmast to foremost part of mizen-top, to assist in getting
the tops over; but if they are properly slung it is not necessary.
The dead-eyes for the topmast rigging can now be hauled up, and put
in their places in the top-rims: and also ship the top-rail, and
stanchions in their respective places.
=109.=--GETTING HALF-TOPS OVER.
Unlash the girtline blocks from each side of the mast-head, and lash
them on the foremost and after sides; send the end of the foremost
girtline down abaft all, the other between the cross-trees.
If the starboard half is to be got over, place it on the deck with
its upper side up, or on its edge with the upper side aft. Take the
foremost girtline, reeve it down through the foremost hole, by lubber’s
hole for the purpose, (or from aft forward, if on its edge,) take it
underneath the top, and if the hole for the futtock plate will take it,
reeve it up, (or from forward, aft, if on its edge,) and half-hitch it
to the mast-head, or standing part; then take the mast-head part under
the top, (if on its edge, to the foremost side,) and seize it well to
the foremost corner with a piece of small rope, through a hole bored
for the purpose. Take the after girtline, reeve it the same way through
the after hole bored for the purpose in the after part of lubber’s
hole; pass, and half-hitch it the same way as the fore one, and secure
it with a good seizing of small rope, through another hole bored in the
foremost corner. If the futtock holes will not take the girtlines, stop
them with spun-yarn. The top should be so balanced in the girtlines,
as to hang fair when the stops are cut. Reeve the other ends of the
girtlines through the leading blocks; man them, and sway up the top
with the after girtline; at the same time taking in the slack of the
fore one. Have men stationed at the trestle-trees to bear off, cut the
stops, and place. When the edge is clear of the cross-trees, cut the
after stop and sway on both girtlines; and when the foremost corner is
well up, cut the stops; the top will then hang in the girtlines, and
can be easily placed. Shift the girtlines for the larboard half, get
it up the same way, bolt and secure the top. Shift the girtlines on
each side of the mast head, as they were before. A girtline from the
mizenmast-head is sometimes bent to the foremost edge of the main-top,
to assist in bearing off; (it can be dispensed with;) a rope’s end bent
to the top and hauled well aft, will answer the same purpose. Half-tops
may be swayed up, before the cross trees are sent aloft, and hung to
the mast-head, one half on each side, swayed chock up; then send up the
cross-trees, and bolt them to the trestle-trees; lower the half tops
down on the cross-trees; place and secure them as before.
_Note._--In cold weather it would be best to get the tops over before
rigging the masts, in order to give the men a more secure place for
standing while placing the rigging; and in this case a derrick rigged
on the top would be the best way to get the rigging over in a heavy
ship. (If the topmast is pointed and swayed about six feet above the
lower mast-head, it will make a good derrick for getting the lower
rigging over.)
=110.=--GETTING UP TOP-BLOCKS, &c.
Top-blocks are large single blocks, having iron straps, which are
formed after being put round the block, into a large hook. Overhaul
down the girtlines through lubber’s hole; bend one part through the
sheave hole of the block, and stop it to the back part of the hook;
hoist it up, and lash it to the mast-head around the hook, with a
lashing long enough to allow the block to hang half-mast-head high.
Through this block reeve a hawser; send the foremost end down through
the square hole in the foremost part of the trestle-trees; the after
end through the lubber’s hole through a leading block on deck, and
round the capstan.
=111.=--GETTING UP THE TOPMAST.
Take two half-hitches through the fid-hole, with the foremost end of
the hawser, and stop the hawser well round the hounds of the topmast
with a good lashing. Man the capstan, and heave the mast up and down.
Unbend the hawser, reeve it through the sheave-hole in the topmast;
send a hauling line down through the trestle-trees for the end of the
hawser, which haul up and clinch round the lower mast-head over the
block. Overhaul the girtlines down before all, and get the cap into the
top.
_Note._--Pendant tackles may be used to a greater advantage than a
hawser in pointing a topmast, when light handed.
=112.=--GETTING THE CAP INTO THE TOP.
Bend the foremost end of the girtlines, which were sent down before
all, through the round hole in the cap, and stop them along to the
after part of the square hole, keeping the bolts in the cap _up_.[6]
Man the girtlines and “sway away,” bearing well off the fore part of
the top. When high enough, lower, and place the round hole over the
square hole in the trestle-trees. Sway the topmast well through and
lash it securely to the cap; put a capstan bar in the fid-hole with
a hauling line on the end, and heave the topmast up; when the cap is
clear of the lower mast-head, haul on the line from the bar in the heel
of the topmast, and it will slue the mast and bring the square hole
of the cap over the lower masthead; ship the cap-shore, then lower
the hawser, or tackle, and place the cap, beating it into its place.
Land the mast, unreeve the hawser, unlash the top blocks, and hook
them to their proper bolts on each side of the cap; reeve the hawser
through one block, through the trestle-trees, through the sheave in the
top-mast, up through trestle-trees again, and reeve the end through
the foremost bolt in the cap on the opposite side of the block; before
reeving it through, parcel it well; take two half-hitches on its own,
or standing part, and secure the end with a round seizing of spun-yarn.
Bring the hawser to the capstan, heave the topmast up and try the fit;
(then lower away, get the topmast on deck, and try the other set);
and then lower the mast for rigging. Secure the girtline blocks to
eye-bolts in the cap, or to the topmast cross-trees.
_Note._--The stop should be taken off the hounds of the topmast,
directly it is pointed through the trestle-trees; and when getting on
deck, after it is landed, single the hawser the same as when getting
up and down, and stop it to the hounds; then have slip ropes on the
heel to haul it forward or aft, whether fore or main, and place it
on the chocks, for stowing on the booms. A fore-topmast is generally
stowed with the head forward; a main with the head aft; both heads
are sometimes stowed forward, a practice that is frequently adopted
at the present day.
[6] The object of _keeping the bolts up_ in getting the cap into the
top, is, that they may not catch on the top rim and cause delay, and
perhaps injury. (_It is not intended to be shipped so._)
=113.=--TURNING IN DEAD-EYES.
If in the loft, get the length from the mast-head to the deck, from
the draft, if the masts are not stepped, and place the dead-eye to
that length, making due allowance for stretching in setting up. Turn
the dead-eye in as near the end as possible, so that all parts of the
shroud may be equally stretched, which will prevent its having _a gouty
end_.
The principal caution is to keep the lay in the rope, as it prevents
the wet getting in. If the shroud is to be wormed, and served in the
wake of the dead-eye, the worming should not be hove in too taut, as
breaking the shroud round the dead-eye would probably snap it.
The score being well tarred, the end of the shroud is taken underneath,
round the dead-eye, inside standing, or mast-head part; a bolt is put
in a hole of the dead-eye. Take a good strand, knot both ends together;
it is then middled and crossed round the end of the shroud; both bights
are taken round the bolt, one on each side of the dead-eye, and a
smaller bolt put in each bight, which are hove round the large bolt in
the dead-eye. As the turns accumulate, it heaves the shroud taut round.
The dead-eye should be secured through one of the holes with spun yarn
to the shroud before heaving, where the shroud is marked, for the lower
part. When the dead-eye is turned in, in a loft, the shroud is hove in
with a jigger, (or dead-eye machine).
When the shroud is hove well round, pass a good throat-seizing. When
secured, take out the bolts, get a small jigger, hook one end to a
strap round the end of the shroud, and the other to the mast-head part;
take a good strand, knot both ends together, take it round the end and
standing or masthead part; put a bolt in both bights, and heave it
round, pulling up the jigger at the same time; this will bring the end
taut up, as heaving on the strap brings both parts close together; then
pass a round, or quarter seizing, and a smaller one on the end.
If the rigging is turned in on shore, keep the lay in the rope, and
when sent out of the loft, to be placed on the mast-head, keep the ends
inside, the shrouds being marked with a knot or a piece of spun-yarn,
according to the number. The ends will lay aft on one side, and forward
on the other; this is of importance and should be remembered.
_Turning in dead-eyes_, termed _Cutter stay-fashion_.--The dead-eye
being placed to the mark, the end is passed round it as before, but
instead of being secured with a throat-seizing, the end is passed
round the standing-part and seized to the part round the dead-eye
with a round-seizing, and another on the end further round the
dead-eye. The same precaution as in the other way, keep the lay in
the rope and _end_ inside.
_Note._--Worming and serving _shrouds_ in the wake of the dead-eyes
is not a common practice in all ships, but I would recommend it as
a great preservative to the shrouds, if they were served at least
six feet above the dead-eyes. I have known of many gangs of rigging
condemned on account of the shrouds being _magged_ and _chafed_ in
the wake of the dead-eyes and throat-seizing, for want of service,
when all other parts of the shrouds were found to be good.
=114.=--GETTING TOPMAST CROSSTREES OVER.
Overhaul a girtline through the round hole in the cap; and if they
are to go up from the starboard side, overhaul and send it down, and
the after girtline outside the top; hitch that through the round hole
in the cap, well out on the starboard foremost horns underneath, and
secure the end with a good seizing of spun-yarn; the after one bend on
in the same way, to the after starboard horn; then stop both girtlines
well with spun-yarn, close to the trestle-trees, and also with two
stops, on the larboard horns; “sway away;” having a guy from the deck
to clear it of the top, as it goes aloft. When the upper, or larboard
horns are well clear of the cap, take two rope’s ends from the larboard
side of the top, and bend them to the larboard horns, and man them in
the top--these are called “steadying lines,” and are used to prevent
the crosstrees _falling back_, if a stop is cut too soon, and to assist
in getting the crosstrees on the cap, and over the mast-head. “Sway
higher,” cutting the stops, and hauling on the steadying lines. When
the trestle-trees are as high up as possible on the cap, haul on the
steadying lines, and cut the stops close to the trestle-trees on the
starboard side, and the crosstrees will fall across the cap; then
place the after hole between the trestle-trees, over the round hole in
the cap--cast off the girtlines and steadying lines--white-lead the
mast-head in the wake of the crosstrees, and sway the topmast through;
beat the crosstrees well down on the mast-head; and when placed, sway
the topmast a few feet higher for rigging. Pass a lashing through the
fid-hole, and round the lower mast, to steady it.
The topmasts are sometimes fidded before rigging, to avoid the greater
strain upon the top tackles. If a topmast has only one sheave (like a
mizen topmast), it is a good precaution to reeve a hawser through the
fid-hole, and haul it taut, as the mast goes aloft; unreeving it only
when the mast is high enough for fidding, or previous to the squares
entering the trestle-trees.
[Illustration]
=115.=--PLACING TOPMAST RIGGING.
Tar the masthead in the wake of the rigging; send the bolsters aloft,
and stop them. After the bolsters are on, put over first the mast-head
pendants--then the span for ginn blocks; then follows the straps, with
thimble in for standing part of the tyes--next, first pair of shrouds
on the starboard side, then the larboard; and so on, until all are
over; then lash the breast backstay (if single); if a pair, put them
over the same as a shroud; next the after backstays; lash the stays,
if fitted for it, if not, put them over the same as lower stays, with
_mousings_. The collars of the stays go between the cross-trees, and
lash over the after one. Some prefer chain spans. The most approved
method is an iron plate, with a hook on each end, which lays across the
trestle-trees.
=116.=--TO SEIZE-IN THE SISTER-BLOCKS.
There is a score on each side to take the shroud, and three scores
for seizing--one on each end, and one between both sheaves. They are
seized-in the length of the hanging block, from the eye-seizing, to
prevent any risk of the reef-tackle and lift being jammed between
the hanging blocks and the rigging--one seizing is passed round the
shrouds, above the block, another below the block; and a small seizing
put on each score, round the block and shrouds. The topsail-lift leads
through the lower sheave, and reef tackle through the upper one.
The larboard block should be seized-in once the diameter of the shroud
lower than the other, as, if both are seized alike (the starboard
shroud going over first) they would not be square when the rigging is
placed.
=117.=--BACKSTAYS, (BREAST,)
When in pairs, are fitted with eyes, the same as the shrouds, and
served sufficiently far down to be square with the service of the
topmast shrouds. They are also parceled and served in the way of the
lower yards, when braced up. When there is only one backstay it is
secured round the mast-head with a lashing passed round it, through an
eye spliced in;[7] they are set up to a treble block in the channels.
Through these blocks a fall is rove, the standing part being spliced
into the strap of the double block, and then led from the treble block
through a fair leader in the side, in on deck.
_Note._--I have seen ships without breast backstays on any mast,
and they carried sail equally well with those who had them; one
was the _Independence razee_: her breast backstays were converted
into standing ones, and set up a little further aft, or immediately
forward of the proper standing backstays.
Breast backstays are generally pulled up in stays when the ship is
head to wind, having a quarter-watch of topmen stationed by them. If
they should be set up too taut, which may be the case, especially
when the rigging is slack, they are likely to snap and endanger the
mast by the sudden jerk; if not set up enough, they can be of no use,
and are only an additional weight on the mast-heads, and a useless
expenditure of rope. Their being set up to bear an equal strain with
the rigging, will not occur with the greatest care once in a year,
and I consider them particularly injurious on top-gallant-masts. A
good stout _standing backstay_ is the main support.
[7] Some are fitted with a cut splice.
=118.=--STANDING AFTER-BACKSTAYS,
When in pairs, are fitted with an eye the same as topmost rigging. When
an odd one on each side, they are fitted with a horse shoe. They are
now fitted the same size as lower rigging.
The backstays are set up with a lanyard rove through dead-eyes, the
same as shrouds, having service in the wake of the lower yards and tops.
=119.=--MAIN TOPMAST STAY
Is fitted of the same size as the standing backstay. A large clump
block is strapped round the foremast head, over the eyes of the
rigging, and immediately over the square hole in the after part of the
trestle-trees. Through this block the main topmast stay is rove down,
through the trestle-trees--has a thimble turned in the end, lanyard
spliced and rove through it, and set up to a span shackle in the deck,
abaft the foremast, for the purpose; or a large bull’s-eye hooked to an
eye-bolt, and set up on the end.
The spring stay leads through a block strapped round the foremast above
the cat-harpens, and sets up in the fore-top.
[Illustration]
=120.=--MIZEN TOPMAST STAY
Is rove through a thimble strapped round the mainmast-head, over the
eyes of the rigging; and when set up, is secured to its own part with
round seizings. If preferred, it can be set up with a thimble turned
into the end, and a lanyard rove through it; but this is not necessary.
When the stays are well stretched, the thimbles can be spliced in, but
it is not a good plan; for, should it be necessary to unreeve, the
splice must be drawn, which will injure the rope. I have seen them
fitted in this way, and pointed over for neatness,--but prefer their
being turned in, and the end pointed or capped.
_Note._--There is no mizen topmast spring-stay.
=121.=--GETTING THE TOPMAST CAPS ON.
The girtline blocks should be lashed well up to the topmast head.
Overhaul down before all the foremost ends, and secure them to the
foremost bolts in the cap; stop them to the centre ones, and also to
the square hole in the after part; sway the cap up;--when well up, cut
the after stops, sway higher, and the cap can be easily placed by the
man aloft, and girtlines cast off.
If the cap should be very heavy, use a derrick; a capstan bar will
answer the purpose.
_Note._--Ship the capshore the same time you place the cap.
=122.=--MAST-HEAD MAN ROPES, &c., &c.
A piece of rope has an eye spliced in one end, and several overhanded
knots made on the bight, at equal distances from each other. They
should be long enough to reach a third down the topmast rigging, and
seized round the mast-head close to the cap; one on each side is
sufficient. They are absolutely necessary in large ships, and should be
on all.
I have seen them in some very neat ships; and, when it is recollected
the small space the men have for their feet when they get near the
crosstrees, and the long mast-head, to get on the cap, it is certainly
worth while to sacrifice something in the way of appearance to ensure
the safety of a man’s life.
Some large ships have ladders with two steps, set up to the eyes of
the topmast rigging, from the cap; also, spans and grab-ropes fitted,
to go from the swifters abreast of the cap, which will be found very
convenient for the topmen, when exercising sails. These may appear
trifling matters to some, but ships fitted with them are generally
ahead, when exercising in a squadron.
=123.=--TOP TACKLE PENDANTS, &c.
When cut to the required length, a thimble, _well parceled_, is spliced
into one end, and the other pointed, with a becket in it. There are two
to the fore, and two to the main topmasts. In the heel of each topmast
there is a dumb sheave;--take one pendant and reeve it through the top
block, hooked to the cap, through the trestle-trees, through the dumb
sheave, or _heel-block_, through an eye-bolt in the foremost part of
the cap, on the opposite side to the block; take two half-hitches, and
secure the end to its own part, with a spun-yarn seizing; hook the top
tackle block to the thimble in the pendant, and the lower one, to a
bolt in the deck for the purpose; reeve the fall through a leader, and
bring it to the capstan; heave well taut, and unreeve the hawser by
which the mast was formerly hove up for rigging.
The other pendant reeves through the other top-block, through the
sheave hole in the topmast, and clenched to the other eye-bolt in the
fore corner of the cap; hook the blocks, reeve and bring the fall
to the capstan, taking the other off, and manning it well. When no
capstan, both falls must be well-manned by hand.
_Top Tackle Falls and Blocks._--The upper block is double, strapped,
which is made into a hook; the lower is also double, and should be
iron-strapped, having a swivel; a single one is hooked near the
double as a leading block; the fall is rove; the standing part
hitched, or clenched, over the block; they are sometimes spliced in,
and some have beckets.
To hook the double block, clap a single tail-block well up on the
pendant, reeve a whip through it, hitch one end of the whip through
one of the sheaves of the double block, hoist it up, and hook it to
the pendant.
=124.=--PREPARING TO FID THE TOPMASTS.
Capshores should be stepped and secured, luff tackles clapped on all
the stays and backstays. Lower blocks should not be hooked on to the
lanyards, but to bolts in the deck, and eye-bolts or straps in the
chains; capstans and falls manned, topmast rigging quite clear, and
hove over the sides of the tops, and the topmasts hove up and fidded,
_mast stayed_, _rigging set up_, _&c._
=125.=--RATTLING THE LOWER AND TOPMAST RIGGING.
Cat-harpen legs and futtock shrouds are seized-on and set up; topmast
stayed, rigging and backstays set up, lanyards secured as lower
rigging,--then commence rattling down.
Girt the rigging with three fore and aft swifters--one by the shear
rail, and the others at equal distances, as follows:--Make one end of a
small rope fast round the foremost shroud, take a turn round the next,
then the third, and so on, until all are taken in; then back the same
way, and half-hitch it round the first. The swifter should be just
taut, and not so as to bring the shrouds together,--the object being
to make the ratlines a little tauter when let go. Sometimes swifters
are not used, but the ratlines are never so square, or look well. Care
should be taken that they are not too taut, for, when let go, all the
strain will come on the seizing in the eyes of the ratlines, and they
will be constantly snapping. Two swifters on each side are sufficient
for the topmast rigging.
_Spar the rigging down_, with spare spars, such as studding-sail
yards, boat’s oars, boat’s masts, handspikes, or anything _light_ that
will answer, and seize them to the shrouds on the outside, at equal
distances, leaving sufficient space for three or four ratlines between
each spar.
A coil of small well-stretched rope is placed on each side of the deck,
two or three on a side when required to be done quick. Splice an eye in
one end of the rattling stuff, seize it to the first shroud, and then
commence clove-hitching on the second, and so on to the after, but one;
then measure the distance from that to the last, cut it off, and splice
an eye in the end. Beat the _hitches_ well round each shroud, seize the
end to the foremost one, and also the other eye to the after one, and
rattle up, taking the shear of the rails. The hitches are formed on the
outside, and at equal distances; in three or four places take a ratline
to the after swifter;--these are called _shear ratlines_.
When it is necessary to rattle quick, take three ends up at a time.
Fifteen inches is a good distance between the ratlines, and their
places should be chalked off all the way up and down before commencing.
Each man employed should have a measure within his reach, and care
should be taken to make the ratlines on one side correspond in a
parallel direction with those of the other. This can only be seen from
the outside of the ship. Make the hitches neat, and the eyes small; few
things tend more to a snug appearance.
If the rigging is to be blacked, after rattling down, it is best to
leave the spars on until that is done, taking them off as you black
down.
=126.=--FUTTOCK-STAVES IN TOPMAST RIGGING
Are iron bolts parceled and served; are seized to the shrouds the
length of the _hounds_, down on the inside; seizings passed as in lower
rigging.
_Cat-harpen legs on topmast rigging._--Take the length from the
starboard foremost shroud round the mast, and to the after one on
the same side; get a piece of rope this length, splice an eye in
each end, worm, parcel, and serve it. There are two on each mast.
Seize the foremost end to the foremost shroud and futtock stave, take
it round the mast and seize it to the after one; secure one to the
larboard side in the same manner.
I have seen them go from the foremost starboard shroud, straight to
the after larboard one, crossing abaft the mast. They are also fitted
to set up with thimbles and a lanyard, abaft the mast. When this is
done, both eyes are seized to the futtock staves on the starboard
side, a thimble seized in the bight, and set up abaft the mast to
the larboard one, with a lanyard fitted in the same way. (Vessels
with chain topsail ties are fitted with iron _bands_, to go round the
mast, with eyes for the topgallant rigging to lead through.)
=127.=--TO RIG THE JIB-BOOM.
Hoist the jib-boom on board by the hawser or tackle, which was left at
the foremast head when getting on board the fore topmast, run the end
out on the bowsprit, pointing it through the stays and bowsprit cap.
Reeve the heel-rope, and sway the jib-boom out a foot or two beyond the
cap. Reeve the jib-stay through the hanks, _traveller if required_, and
then through the inner sheave-hole, in the boom end, martingale and
necklace, and turn a double block in the inner end; reeve the lanyard
or fall through this, and a single block bolted to the bows. To the
traveler seize the jib downhaul blocks and traveling guys; tar the boom
end, put a grommet over, to which seize the fore topgallant bowline
blocks, one on each side.
_Foot ropes._--There is one on each side of the jib-boom. They should
be long enough when in their place to allow a man to stand navel-high
along the boom, and are fitted as follows: take a piece of rope long
enough to make both; cut it in the centre and splice one end into the
other with a cut splice, forming an eye to fit the jib-boom end. Four
or five overhand knots are taken at equal distances on the rope, from
the eye, according to the length of the foot-rope; the knots are for
the purpose of preventing the men from slipping. In each end splice a
small eye, large enough to take a lashing, by which they are set up
to bolts in the bowsprit cap. An eye is sometimes made by taking a
round turn round the boom end, and two seizings passed. Also with a
span, horse-shoe fashion, and neatly covered with canvass.
_Note._--Turk’s-heads worked through the strands, may be substituted
for knots on the foot-ropes, if time will permit.
=128.=--JIB-BOOM MARTINGALE STAY
Is a short rope, with an eye in each end to fit the jib-boom, and end
of the dolphin-striker. The eyes are well served, and covered with
canvass or leather. The martingale is wormed, and a small twine seizing
(snaked) put on round the worming at equal distances between the eyes;
three, or four, according to the length, which must depend on the way
the dolphin-striker is intended to stand, or rake. It looks best when
perpendicular to cap or jackstaff.
Chain is sometimes used for the purpose, as also for back-ropes; and is
found to answer well, it not being liable to stretch.
=129.=--JIB-BOOM GUYS.
There is one pair on each side; an eye is made to fit the boom end
by passing a round seizing, when in their place; both ends are rove
through thimbles on each yard-arm of spritsail yard (when crossed).
Then brought in and both ends set up to bull’s eyes in the bow, or
fitted with tackles.
_Placing the rigging on the jib-boom._--First, the foot-ropes; next,
the martingale stay, and guys. In some ships, an iron grummet is
fitted with an eye on top and one underneath, neatly leathered, and
put over the boom-end first. The martingale stay is hooked to the
underneath eye, the jib-tack and downhaul to the upper one.
=130.=--MARTINGALE BACK-ROPES
Are pendants, middled and served in the centre, the round of the
dolphin striker, both parts crossed and secured with a throat seizing.
The service should be long enough to take in the seizing. In the ends
splice a single or double block; another single one is strapped into a
bolt in the bow for the purpose, or fitted in a strap with a hook and
thimble (hook moused). A gun tackle, or luff-purchase, is then rove,
the standing part of the fall spliced round the pendant, in after end
of the block, rove through the one in the bow, over the head rails,
back through the one in the pendant, and through a fair leading sheave,
in the forecastle bulwark. These falls, after being pulled up, are
racked together outside the bulwark. If belayed on the forecastle, they
should be seized to their next part, so as not to be let go by mistake.
=131.=--PLACING THE RIGGING ON A DOLPHIN-STRIKER.
Back-ropes first, and next the martingale; below this rigging, in the
end of the dolphin-striker, are two or three sheaves, and one close
above it, large enough to admit the jib-stay, which is rove through
it; flying jib-stay in the next sheave, and flying martingale stay
under all, which will show two ropes leading from each boom end, to the
dolphin-striker.
=132.=--GETTING THE JIB-BOOM OUT.
The flying jib-boom iron is driven on; the heel rope manned (if
rigged), and the boom hauled out. The heel strap is placed in a score
in the heel for the purpose, and both bights lashed together; then
another lashing passed round the strap, between the boom and the
bowsprit, and the strap well frapped together. The heel being well
secured, set up the back ropes and guys.
_Note._--Rigging to be placed same as jib-boom.
=133.=--SENDING UP TOPGALLANT MASTS.
The topgallant top blocks being hooked, we will suppose the long mast
rope is to be rove, from the starboard side of the topmast-cap; take
the end through the square hole in the fore part of the trestle-trees,
half-hitch it through the fid-hole, and stop it round the _hounds_,
and the royal mast-head; send the hauling part through lubber’s hole,
and through a leading block or sheave on deck. The topgallant rigging
is fitted on a sheet-iron cylinder or funnel, attached to the jack
cross-trees (by an order from the former Navy Commissioners), leathered
and painted on the outside, and tarred on the inside; put on the
grommet or strap for the main royal stay[8] to reeve through, then put
on the topgallant and flying jib-stays, starboard and larboard shrouds,
breast and standing backstays, and secure them over the funnel;
overhaul the girtlines down on deck, and bend them on to the rigging,
around all parts, about the length of the mast-head below the jack, and
a good stop through the funnel; hoist the funnel up and place it, with
the rigging on, over the hole in the cap, and take the stays forward
and reeve them.
Man the mast-ropes and “sway away,” having men stationed to bear off
and place the rigging or funnel. When pointed through the funnel, place
the royal rigging and truck, reeve the signal halyards, and _attach_
the conductor; “sway higher,” land the mast on the top or forepart of
lower mast-cap, and, if required, reeve the short mast rope; reeve the
pointed end through a block hooked to the cap on the larboard side, or
the sheave, then through the trestle-trees, through the sheave-hole
in the topgallant-mast, up through the trestle-trees, and secure the
end to the foremost bolt in the cap, with two half-hitches, and seize
the end; to the thimble in the other end, hook the double block of a
burton; hook the single one to a strap round the trestle-trees; send
the burton fall on deck through lubber’s hole, and lead it through a
single leading block, and haul it taut; unreeve the long mast rope,
and fid the mast; when the fid is in, the mast rope can be unrove, if
wished.
Reeve the ends of the shrouds through the horns of the cross-trees,
between the topmast rigging, over the futtock staves, and turn a
thimble in each end; strap another round a futtock plate, inside the
dead-eyes of top-mast rigging; if there is none placed in the top,
splice a lanyard into that in each shroud, and take two or three turns
through each, stay the mast, and set the rigging and backstays up.
In setting up the backstays the single block of the jigger, which is
hooked to the thimble, is hooked to a blackwall hitch, in the lanyard,
and when set up, expend the lanyard through the thimbles, and seize
the ends. On both shrouds on each side clap on small jiggers, hook the
double blocks to straps on the shrouds, the single to Blackwall hitches
in the lanyards, and set up and secure the same as the backstays.
The fore topgallant stay reeves through the outer sheave-hole in the
jib-boom, and through a bull’s-eye hooked to the bows, and when set up,
is seized to its own part.
The main topgallant stay is rove through the middle sheave in the after
chock of the fore topmast crosstrees, or through a block strapped
around the fore mast-head, and set up in the fore top.
The mizen topgallant stay is rove through a bull’s-eye in the after
part of the main cap, and set up in the main top.
[8] Suppose this to be the fore topgallant-mast.
=134.=--ROYAL RIGGING.
There is one breast, and after backstay on each side, seized as the
after backstays on topgallant masts. The breast backstay or _shroud_,
is pulled up with a gun tackle purchase;[9] the after leg has a thimble
turned in, and sets up in the after part of the chains, with a lanyard.
_Royal stays._--As there is no funnel (although it would be a
great advantage to have one), splice an eye in the stay to fit the
mast-head, cover it, and serve over the splice. It goes on next to
the grommet, then the shroud and backstays, spanned together.
The fore royal stay is rove through the outer sheave-hole in the
flying jib-boom end, and pulled up through a fair leader on the
forecastle.
The main royal stay is rove through a thimble stopped around the
foretop gallant mast-head, through another strapped round the eye of
a shroud, and when set up is seized to its own part.
Mizen royal stay reeves through a sheave in the after part of the
main topmast trestle-trees, through a thimble strapped round the eye
of a main shroud, and seized to its own part.
[9] Royal-backstays are set up with a jigger to their respective
places in the channels. The shrouds are set up in the top
breast-backstay-fashion.
=135.=--SHORT AND LONG TOPGALLANT MAST-ROPES.
_Short mast ropes_ have a thimble spliced in one end, and the other
end pointed. They are rove when the mast is rigged, and are used for
fidding. They should be sufficiently long (when the mast is landed on
the top or cap), after being rove through the block and sheave in the
heel of the mast, and clenched to the cap, to allow the thimble to hang
clear of the cat-harpen legs.
If the topsail-yard is crossed, the mast is landed on it, for rigging;
if the topgallant-mast should be too long to allow its being landed on
the yard, the mast rope must be lengthened accordingly.
_Long mast ropes._--Ropes are often fitted for the purpose; but the
topgallant yard rope is generally used. I have seen them fitted as
follows, and they answered very well:--
The rope is rove, and stopped to the topgallant-masthead, and royal
sheave-hole, leaving a long end over the upper stop, to hitch to the
bolt, before cutting the stops. To prevent the rope _slipping_, rack
both parts together above the sheave-hole in the heel of the mast.
=136.=--TO RIG THE FLYING JIB-BOOM.
Sway it on board and point it through the iron at the jib-boom end. A
tail block is put on the neck of the iron, or on the jib-stay, close
down to the boom. Through this block reeve the heel rope, one end taken
in on the forecastle, and the other bent to the heel of the boom.
A rope is bent to the heel of the boom to serve as a guy; sway the
boom out a foot or two for rigging. Put over the foot ropes, fitted
as the jib-boom, the inner ends seized to the jib-boom end, inside
the iron. The martingale, when single, is secured round the boom end,
clenched, spliced, or with a running eye, rove through a sheave in the
dolphin-striker, and in on the forecastle, on the opposite side to the
royal stay. When double, a single block is strapped round the boom end,
and the standing part spliced round the dolphin-striker; hauling part
as when single.
_Guys._--One on each side spliced into each other, forming a
cut-splice to fit the boom end. The other end rove through thimbles,
strapped round the spritsail yard, through fair leaders in the
bulwarks, and pulled up on the forecastle, or set up on the bows.
Man the heel rope and get the boom out; the heel is placed in a
step formed on the fore side of the bowsprit cap, for the purpose,
and secured with a lashing, rove through the end, and passed round
the jib-boom. Set up the martingale, stay the fore topgallant and
royal mast, (fore and aft,) by the stays and backstays; and if the
spritsail yard is crossed, reeve the guys, turn in thimbles, and set
them up.
=137.=--SPRITSAIL LIFTS
Are single; have an eye spliced in one end to fit the yard-arm; splices
served over are taken over the jib guys, rove through the bull’s-eye in
the cap, and set up on the forecastle. Blocks are sometimes strapped
into the bolts, but it is quite unnecessary. Bolts are often driven
into the fore side of the cap, and the lifts led through; when this
is done, they are generally set up there with lanyards and thimbles,
spliced into the end, which answers every purpose.
=138.=--SPRITSAIL BRACES.
A single block is strapped into a bolt in the cheek of the foremast on
each side. The brace has an eye in one end, to fit the yard arm; the
other is rove through the single block, on collar of fore-stay, and
another single block is spliced into the end; a luff tackle purchase is
rove with it, and a double block on the deck, one sheave answering for
a leading one.
They are sometimes rove double, but the practice is getting out of date.
=139.=--STRAPPING THIMBLES FOR GUYS ON SPRITSAIL YARDS.
The thimbles are double-strapped and secured, after being placed round
the yard, and in the score of the thimbles, with a round seizing passed
between the thimble and the yard; the splices laying in the upper side
of the score in the thimbles. Some fit grummet straps, or a short-long
splice, in the strap for neatness.
The use of double straps is to allow the thimbles to lay fair with the
yard for the jib guys to lead through; if single, they would stand fore
and aft.
=140.=--CROSSING A SPRITSAIL YARD.
The yard being rigged, prepare for crossing as follows:
Clap a good selvagee strap well up, on the fore topmast stay; to it
hook a snatch or leading block large enough to take a hawser; reeve
it and timber-hitch it round the starboard quarter of the spritsail
yard, (if got out on the starboard side,) stop it along to the larboard
quarter, and half way out on the larboard yard-arm. Overhaul down the
lifts and braces, and sway out, keeping the larboard yard-arm under
the bowsprit; when clear on the larboard side, put over the brace, or
block, and lift, and haul out; when nearly out, or before clear of
the head rails, put over the starboard brace or block and lift; haul
on the hawser, starboard lift, and brace, and cast off the stops.
When sufficiently out, pass the parrel, _take a turn or hold well on
the end_; hook the tye, and square the yard. Cast off the hawser and
unreeve it; reeve the jib-guys through their thimbles on the spritsail
yard, turn in dead-eyes or blocks, and set them up to others on the
bows; set all up taut and square the yard.
=141.=--TWO HALF SPRITSAIL YARDS.
Two half spritsail yards, made like dolphin-strikers, are secured to
the bowsprit with jaws, (or an iron band fitted round the bowsprit,
with a double goose-neck hinge,) to cant or turn in any required
direction. When the half spritsail yard is carried it is rigged as
follows:--
The fore guys are made of well stretched rope, and equal in strength to
the jib guys together, each fitted with an artificial eye to fit the
jib-boom end and half yard-arm. They should be wormed with small rope,
parceled and served, or covered in the eyes; four stranded rope is
preferable, it being not so liable to stretch as three.
The after guys are fitted with an artificial eye in one end, to fit the
yard arm, and a thimble spliced into the other. They are the same size
as the fore guys, and wormed in the same manner. If made on purpose,
and four-stranded, the thimble is kept in the bight with a round
seizing.
The jumper, or lower guy, is fitted the same as the after, only
shorter; the length of this depends on the drop intended to be given to
the yard arm, which should never be less than the spritsail yard, when
well braced up, or, in other words, _canted_.
The jumper is put on the yard arm first, then the after one, next, the
foremost, and over the jib-boom. The after one is set up to a bolt by
the cat-head, well down; the lower, to an eye-bolt in each side of the
cutwater, well out.
For a frigate, the guys are eight-and-a-half-inch, and wormed with
twenty-one thread stuff. Four-stranded rope, if made on purpose, can
have the eyes formed when laying up in the rope walk. Some fit forward
and after guys all in one.
=142.=--WHISKERS.
Whiskers are iron outriggers from the cathead, with sheaves in them for
the guys to reeve through, and set up to the fore chains, the same as
when rove through the spritsail yard. This plan is much in use in small
vessels, but the boom is supported almost entirely by the martingale,
as the guys being considerably above the boom, and its always _topping
up_, when the sail is set on a wind, the more wind the greater the
strain on the martingale; and should the guys be not carefully pulled
up, the boom must depend on the martingale entirely for support.
=143.=--TO GET ON BOARD AND RIG LOWER YARDS.
Overhaul the hawser from the lower mast-head, bend on to the slings
of the yard, and get them nearly up and down; clap selvagees on the
quarters, to which hook the pendant tackles. As it comes on board, cut
the stops, easing away on the pendant tackle, and bousing on the other,
until the yard is athwart-ships; place chocks in the hammock nettings
for the yard to rest on; slue them fair, and lash them; come up the
tackles, cast off the hawsers, and place a shore under the middle of
the yard to prevent its springing. Measure the yard, tar and leather
the slings, fit a saddle for the D thimble, which lash on with a piece
of well stretched rope, heaving each turn taut with a Spanish windlass,
and fitting the score of the D thimble. Cover all with leather, and fit
the straps for the preventer slings, &c., &c., &c.
_Note._--The iron sling-bands are now used instead of the _old
fashioned_ D thimble.
Chain is now generally used, and allowed to all ships in the service
for the slings (proper), rope ones being used as preventers. (See
Rigging Table.)
=144.=--TRUSS STRAPS.
A large thimble with the score well parceled, is seized into a double
strap, which is made by splicing both ends together, and served over;
the thimble secured in the strap with a round seizing, the splice
laying in the score. The strap should be long enough to go round the
yard in the quarter, both eyes lashing together on the fore side. There
are two on each yard. One thimble is seized inside the truss pendant,
the other outside; and one in the round of the pendant higher up than
the other.
=145.=--TRUSS PENDANTS[10]
Are wormed, parceled, and served; an eye is spliced in one end large
enough to take the pendant when rove through it; in the other an
artificial eye is made, large enough to take the single block for truss
fall. The pendant should be rove through the small eye before the
artificial one is made, boused well taut round the yard, the eye being
kept underneath, and one pendant higher than the other. Reeve the upper
pendant through the upper thimble, and lower pendant through lower
thimble. Being rove in this manner, they will lead perfectly clear of
each other.
_Hide rope_ is preferable for pendants, but the iron patent truss is
now allowed to all vessels, up to a second class frigate inclusive.
(_New regulation_).
[10] For length and size, see Rigging Table.
=146.=--QUARTER BLOCKS--LOWER YARDS.
Quarter or topsail sheet blocks are large single blocks, with double
straps; the block seized in with a round seizing, and secured round
the yard, (inside the cleat, one on each side,) with a rose-lashing
passed through both bights on the top of the yard. Before the lashing
is passed, the block should be hove up with heavers, and the eyes of
the strap brought as close together as possible. This is done with a
good strand passed through both, and hove up with a Spanish windlass.
Vessels carrying chain topsail sheets, have iron blocks fitted to the
iron bands in the slings of the yard for that purpose. (See Rigging
Table).
=147.=--CLEW GARNET BLOCKS
Are single; seized into a single strap, with an eye spliced in each
end, and are secured round the yard with a rose-lashing, the same as
the topsail sheet blocks, just outside the cleats. Some ships have all
the rigging inside the cleats, which is much neater.
_Note._-Iron bound blocks are allowed to all classes of vessels in
the navy, by the new regulation, for this purpose.
=148.=--LIFT BLOCKS--LOWER YARDS
Are single, seized into a single strap, with a round seizing; the strap
being long enough to go over the yard arm, after the block is seized
in. If both ends are spliced together, the splice should lay in the
score of the block, or upper side; but a grummet will answer equally as
well, and look snugger.
=149.=--FOOT ROPES AND STIRRUPS.
The foot ropes are cut once-and-a-half the length of the yard,
(excepting lower yards). An eye, to fit the yard arm, is spliced in one
end; and a small one, to take a seizing, in the other. The splicing
served in the way of chafing (one-third) midship part.
_Stirrups_ are short pieces of rope spliced round the foot rope; eyes
spliced in the opposite ends, to go over the jackstay-bolts; splices
served over. They are sometimes unlaid at one end and made into plait,
and secured to the yard with flat-headed nails, having a small piece of
hide or leather placed under their heads before being driven into the
yard. Going over the jackstay bolts is preferable; and some seize it
to the neck of the bolt, or staple. They hang on the after side of all
yards.
Some vessels have their foot ropes fitted to go abaft the mast, and
seized to the parrel, which answers a very good purpose, especially in
vessels with raking masts, as it gives the men a better opportunity to
stand.
=150.=--JACKSTAYS.--BENDING AND REEFING.
Take a piece of rope of the proper size,[11] cut off the length of the
yard, splice an eye in each end, to fit the yard arm, sufficiently taut
to require being driven on. Cut in the centre, and splice a thimble in
each end; put the strands for splicing in once-and-a-half, marl down,
and serve over. If two jackstays on each arm, (which should always
be the case when the sail is reefed to one), the large one, before
splicing the thimbles in, is rove through the eye-bolts on the yard for
the purpose; this is the reefing jackstay. The bending one is fitted
the same way, and after being put over the yard arm, is seized to the
neck of the bolts on the after side.
This plan has been generally adopted, as it was found much easier to
reef, than when fitted with only one jackstay; there being always
difficulty and delay in getting the points between the jackstay and the
yard, when the sail was bent to it. When only one jackstay, it is rove
through the eye-bolts.
_Note._--Iron bending jackstays are now allowed for all vessels in
the navy.
[11] For the length and size of rope, see Rigging Table.
=151.=--BRACE BLOCKS.--LOWER YARDS.
The straps should be fitted sufficiently taut to require being driven
on the yard arm. Two thimbles are fitted, one within the other, called
_lock thimbles_. Take a piece of rope, of the proper size, and cut
it long enough to go round one thimble and the yard, when spliced
together; worm, parcel and serve it, and pass a round seizing round
this strap, close to the thimble. Grommet straps are preferable, if
time will permit.
The block is a large single one, with two scores. For the strap take
a piece of rope the required length, and splice both ends together;
worm, parcel, and serve it; reeve it through the thimble already
strapped, and pass both parts round the score of the other thimble;
then place both bights in the scores in the brace block, keeping the
splice in the after end of the block; pass a round seizing between the
block and thimble, crossing it both ways, as in a double strap.
_Cross-jack brace-blocks_ are single, and strapped the same as lower
ones. A double block is secured to the after shrouds in the main
rigging, the same as main preventer brace blocks. When reeving the
cross-jack braces, one end of the brace is clinched, spliced, or
half-hitched, and the end seized, just below the block; then rove
through the block on the yard, through the inside sheave in double
block, and through a fair leading sheave in a rack, in the side or a
leading block. I have seen blocks strapped into bolts on the main-mast,
for the brace and bowline, which answered well. The brace block should
be put on the yard, sufficiently far in to be inside the topmast
backstays, when braced up.
_Note._--These braces should be well _below_ the yard, as it always
_tops up_ on the wind, which slacks the weather leech; this is partly
the reason a mizen-topsail never stands well.
=152.=--PLACING THE RIGGING ON LOWER YARDS.
Sling bands in the centre, and also on both sides, close to the topsail
sheet block, the truss pendants, then truss straps; if the rigging is
all within the cleats, a clue garnet block is lashed on each side; if
not, they are lashed one on each side, close outside. I have seen them
both ways, but inside is preferable.
Tar well the yard arm, close to the cleats and slings, in the wake of
the rigging, first jackstay; if two, the bending one, and set it up
amidships with a lanyard. Then the foot ropes; after going over the
yard arm, and rove through the stirrups, they are lashed together,
with a lanyard rove through both thimbles, and are secured with a good
seizing to the strap of quarter block. Then the brace, and lift blocks.
Rolling tackle straps on the inner quarter of yard, with the eye abaft
burton straps on the outer quarter yard-arm, eye on top of yard.
If the stirrups go over the jackstay bolts, they should be put over
before the jackstay is rove.
The cross jack-yard has no jackstay, head earings, or yard tackle
straps; and the brace blocks, instead of going over the yard-arm, are
put on some distance inside of the sheave hole for the mizen-topsail
sheets, on the forward side of the yard.
=153.=--GETTING UP JEER-BLOCKS, AND REEVING JEERS.
Secure two single whip blocks to the after bolts in lower cap. Send the
two foremost ends through lubber’s hole down on deck; bend them through
the shell of the block, with two half-hitches, and seize the end. Stop
them along each leg of the strap, the larboard whip to the larboard
leg, and the starboard whip to the starboard leg; then stop both legs
together with a seizing of spun-yarn in the bights--the hauling part of
the whips being through lubber’s hole and through a leading block on
deck; man them and hoist the blocks into their places. When clear of
the top, cut the stop in the bights, haul on the whips, and they will
bring the strap into its place, on each side of the mast-head. Then cut
the upper stops, on the whips; take a turn and pass the lashing in the
bight, securing each end to their next part. When secured, let go, and
take off the whips.
_Reeving jeers._--The standing part is clenched round the strap of
the upper block, rove through the one on the yard, up through another
sheave in upper block, and so on, until all rove full. The hauling
part is rove through a leading sheave, in fore or main bitts, or
through leading blocks. When heaving up, they are either brought to
the capstan, or manned by hand.
The jeer blocks are now generally fitted with hooks, as they can be
got up and down much quicker. At the present day, few ships are seen
to carry their jeers up in their proper places.
=154.=--LOWER LIFT BLOCKS
Are double; an iron plate is bolted across the upper side of the main
or fore cap; it is in the form of a crescent, with the hollow side
toward the topmast. In each end of the crescent, or horn, an eye is
turned and a thimble put in it. Instead of the eyes being turned,
I have seen two eye-bolts driven through the crescent and cap, and
secured underneath with a nut; a thimble is also put in the eye-bolt,
and the blocks strapped in.
The cross-jack lift blocks are single, one on each side, and can be
fitted as the fore or main, or (a chalk) abaft the mast-head, if
preferred, for neatness.
=155.=--REEVING LOWER LIFTS.
Clench one end round the yard outside all, then take the other end up
and reeve it through the foremast sheave in the double block in the
fore or main cap, then through the block on the yard, through the other
sheave in the double block, and through lubber’s hole on deck; well up
this part, splice a lizard for jigger tackle, or use tails selvageed on
the end. The upper block of the jigger can be spliced or turned in to
the lift, if preferred.
The cross jack lifts go over the yard arms with an eye spliced in the
end to fit them. The other end is rove through the block at the cap,
and is set up with two thimbles and a lanyard in the top; one thimble
being turned into the end, the other strapped to the eye of one of the
lower shrouds.
=156.=--MAIN BRACES--ON BUMKIN, &c.
A single block is seized into a double strap, with a round seizing
crossed both ways; the strap is then put over an iron outrigger, or
bumkin on the quarters, fitted for the purpose. The standing part of
the brace being parceled, is rove through another bolt in the bumkin,
and spliced into it or clenched; the other end rove through the block
on the yard arm, from out, in through the block in the bumkin, and
through a sheave in the bulwarks (abaft), for the purpose.
Double blocks are sometimes put on the bumpkin, instead of single ones,
and also two sheaves inserted in the bulwarks instead of one, both ends
of the brace rove, and led in-board--_a great facility in working ship_.
=157.=--FORE BRACES
Are clove-hitched, and the end seized aft on the collar of the main
stay, below the splice; the other end taken forward and rove from in,
out, through the block on the yard, through a single block strapped
into a bolt in the cheek of the main-mast, with a thimble in it, close
up to the trestle-trees; then rove from forward aft, through a sheave
in the main fife-rail.
The brace is often middled, and clove-hitched in the bight on the main
stay, and both ends taken forward and rove as before. Some have a hole
bored in the bibs, or cheeks of the mast, instead of clove-hitching it
around the main stay.
=158.=--CROSSING THE LOWER YARDS.
The jeers being rove, reeve the pendants and falls, hitch the pendants
around the quarters of the yard, splice in the lanyard of the D
thimble, and take the yard tackles forward to keep the yard clear of
the mast. The lifts and braces being rove, man the lifts and jeer
falls, “sway away,” and when the yard comes abreast of the futtock
staves, pass the lashing of the D thimble, parcel it well, over all,
frap all parts together, and cover all with canvass; reeve the truss
pendants, turn in the blocks, reeve the falls, haul taut the tresses,
and square the yard by the lifts and braces.
=159.=--TO GET ON BOARD THE TOPSAIL YARDS.
A large single block is lashed to the topmast-head, through which a
hawser is rove; overhaul it down forward and hitch it to the slings of
the yard, stop it along the yard arm, and sway it on board. Cast off
the hawser, middle the yard and prepare it for rigging.
=160.=--RIGGING TOPSAIL YARDS. (FORE AND MAIN.)
[Illustration]
The jackstays, after going over the yard arm, are rove through the
eye-bolts or staples, and set up a-midships with a lanyard and thimble
spliced in.
Foot ropes round the yard abaft, on their opposite quarters, as
follows:--splice the lanyard into the eye in the end; take it over the
yard, and round on the fore side, underneath through the eye; again
back round the yard on the fore side, through the eye, and back the
same way, until sufficient turns are taken to secure it. Then take
a half-hitch from the lower edge of the eye, round all parts of the
lashing; pass it round before; reeve through the eye on the upper side,
take two half-hitches round all, and secure the end.
Tye blocks are now generally iron-strapped, and bolted into _straps_
round the yard for the purpose. If fitted with rope, they must have
double straps, and secured round the yard, on the upper foremost
quarter, with a rose-lashing. If they are single blocks, two on each
yard.
Quarter blocks are double blocks, iron strapped, and secured in the
same way as tye blocks. Much time is saved by having them fitted in
this manner, as in shifting yards, the topgallant sheets, and topsail
clewlines need not be unrove, which must be the case if rope-strapped.
If rope-strapped they are seized into a single strap, and lashed on top
of the yard with a rose-lashing.
_Parrel._--Take two pieces of rope, one longer than the other; the
long one of sufficient length to go round the mast and yard on each
side; the short leg to go round the mast, and lash to the long leg
on each side. An eye is spliced in each end, are wormed, parceled,
and served; both marled together and covered with leather. A round
seizing is passed around both, close to the eye of the short leg, on
each side. The long leg is taken round the yard, brought round on the
fore side, and secured to the short leg with a lashing of small rope,
passed through both eyes. The other eyes are lashed together when the
yard is across.
Brace blocks are strapped in the same way as fore or main yard.
Flemish horse is a short piece of rope spliced round a thimble, which
is on the neck of the pacific-iron,[12] it has an eye spliced in the
other end, and when the yard is rigged, is secured the same as a foot
rope, just inside the brace block, two or three feet, according to
the length of the yard. They should be long enough to allow a man to
stand on them to pass an earing, &c. They are sometimes fitted to
lower and top-gallant yards, for the convenience of reefing, &c.
Jewel-blocks are single blocks, seized into a strap put over a
thimble on the neck of the pacific-iron, outside the thimble for the
Flemish horse. Some fit them to go over the yard arm. Others fit them
with sister hooks, to hook to the pacific iron.
_Straps._--Half way out, on each yard arm, a strap is fitted long
enough to allow a thimble to be secured in it, with a seizing passed
between the yard and thimble,--this is called a rolling tackle
strap. Also, straps are put on the yard, with thimbles seized in the
same way, inside the lift, to hook a burton to; but a selvagee strap
is generally used for that purpose.
[12] Is what the boom-iron ships on.
=161.=--THE MIZEN TOPSAIL YARD
Is rigged nearly the same as the others, but the brace blocks are on
the fore-side, and the Flemish horses generally spliced into bolts in
the ends of the yards, with round thimbles in them. There is seldom
more than one tye-block on this yard, and no jewel blocks.
=162.=--PLACING THE RIGGING ON TOPSAIL YARDS.
Tar the yard arms; first the jackstay, foot ropes, brace, and lift
block; if no lift block, the lift; Flemish horses, and jewel-blocks.
The quarter blocks should be lashed so as to hang clear of the cap,
when the yard is down. See that the boom irons go on, and a small
cleat, or saddle, inside of the sheave hole, about two feet on each
yard-arm, to keep the topgallant sheets clear of the yard. Also reefing
cleats on yard-arms, outside the lift.
=163.=--CROSSING THE TOPSAIL YARDS.
Reeve a hawser through one of the hanging blocks; send one end down
before all, the other through lubber’s hole, and through a leading
block on deck. Take a round turn, and timber-hitch the hawser round
the slings of the yard; stop it along the larboard yard-arm, if got up
on the starboard side; if got up on the larboard side, the contrary.
Overhaul well down to main or fore rigging, the starboard lifts and
braces; the larboard into the top, and stop them ready for rigging. Man
the hawser, and “sway away.” When the upper yard arm is clear of the
top, put over the brace and lift, (or block,) and “sway higher;” rig
the lower yard arm, take in the slack of the lifts and braces, then
cast off the stops on the upper yard-arm, and when the yard is well up,
take two or three turns with the parrel-lashing; bouse well up on the
starboard or lower lifts, overhaul the larboard, and the stops being
cast off, the yard will fall across. Secure the parrel; square the yard
by braces and lifts, and cast off and unreeve the hawser.
_Note._--In large ships the lifts and brace blocks are generally
placed on the yard arms before the yard is sent aloft. The braces are
rove when the yard goes up. I would also recommend double yard ropes
in heavy ships in crossing topsail yards; also to use the burtons.
=164.=--FITTING FLY-BLOCKS FOR TOPSAIL HALLIARDS.
The blocks spliced into the tyes are so called. They are large flat
blocks; some double, sometimes single, and often one double and one
single to each. The tyes are sometimes spliced taut round them; but
this way is bad; as the rope stretches, the blocks cant, and are
split. Also a long-eye is sometimes made in the end of the tye, and
the fly block kept in its place by a round seizing passed close above
the block. The block in general use is seized into a strap, leaving
sufficient space above to splice the tye in; or a thimble spliced into
the end of the tye, and the fly block strapped with a pair of sister
hooks, to hook to the tyes. Either of the latter ways are preferable to
the former.
When the yard is on the cap, these blocks should be square with the
top rails. Before turning in and setting up for a full due, an iron
traveler is put on the topmast backstay, which is seized to the
fly-block,--it prevents the block from striking or injuring the top
when lowering; it also keeps the turns out of the halliards. There is
sometimes a traveling jackstay fitted for this purpose.
_Reeving Topsail Halliards._--When rove double, a single block is
strapped into, or hooked, to a swivel bolt in the after part of the
chains; one end of the halliards is spliced into the upper part of
the strap of this block, or bent into a becket put there for the
purpose, and the end seized. The other end is then rove through one
of the sheaves in the double block in the tye, then through the
sheave in the single block in the chains, through the other sheave in
the double block, and through a leading block on deck.
_The Mizen Topsail Halliards_ have only one tye. The standing part
is clenched or half-hitched to the strap, with the thimble, at the
mizen-topmast head, and a single block spliced or secured in the
end. Another single block is strapped into a swivel bolt in the mizen
chains, and the halliards rove as with two single blocks; the fall
rove through a leading block or cheek. (Some ships have a treble fly
block).
=165.=--RIGGING TOPGALLANT YARDS.
They are got on board like the topsail yards. Leather the slings,
seize-on the D thimble, parrel, and quarter blocks, rolling
tackle straps,--tar the yard arms--foot ropes the same as topsail
yards--stirrups one to each foot rope--iron jackstays secured to the
yard with staples, fitted the same way as rope. (Iron sling-bands are
allowed by the _new regulation_.)
The lifts are single; an eye is spliced to fit the yard-arm; the other
end is rove through the thimble, or bull’s-eye, or a half sister-block
in the topgallant-rigging; a thimble turned into the end, and a lanyard
spliced into it, and set up to another thimble strapped round a futtock
plate inside the dead-eye in the top, or set up on the end.
[Illustration]
_Braces._--A single block is seized into a single strap, having an
eye to fit the yard-arm. If a single brace, an eye is spliced to fit
the yard-arm, and the lift and brace marled together.
The quarter-blocks are double; are seized into a single strap, an
eye being spliced in each end;--they lash together on the top of the
yard--the foremost sheave for top-gallant clewline, after one for
royal sheet.
_Parrel._--A long and short leg. Take a piece of rope, cut it the
required length, and splice the ends together round the yard. In one
bight seize a thimble, with a round seizing; the other one round the
yard; pass a round seizing close to the yard, round the parrel on the
after side; splice a lanyard into the thimble, and fit a short strap
the same way on the other quarter. These straps are sometimes served,
and often covered with leather,--they go inside the cleats. Grommets
can be worked if preferred, and dispense with the thimbles, as they
are likely to injure the mast. Jaws are also recommended. The patent
iron parrels are now in use in the navy, but are found not to answer
for ships of war.
Tripping beckets are fitted one on each yard-arm; work grummet straps
on quarter of yard, seize a thimble in with a round seizing passed
between the yard and thimble. A grommet is put on the yard rope, to
fit the yard-arm, when getting ready for crossing. Also, a lizard;
a small piece of rope with a thimble spliced in one end, the other
whipped. It goes on the yard rope before being bent to the yard.
When ready for going aloft, the yard rope is bent on, and the yard
stopped to the lower rigging; the main on the starboard side, fore
and mizen on the larboard side.
_Note._--Royal yards, opposite sides, to the topgallant yards.
=166.=--TOPGALLANT BRACES.
_Fore._--If double, the standing part is clove-hitched round the first
and second shrouds of the main topmast rigging; or crotch of the stay,
through the block for the brace, through another single tail block,
secured to the first and second shrouds (the same as, and under the
standing part), through lubber’s hole, and through a fair leading
sheave on deck.
They are often led forward from the blocks in the topmast rigging,
through a leading block strapped round the eyes of the fore rigging,
or after part of the top, and through fair leading sheaves on the
forecastle. In ships of war, I prefer them abaft. The block in the
topmast rigging is fitted as follows:--
A single piece of rope is spliced round a single block, having a tail
about three or four feet long; clove-hitch this tail round the first
shroud, then round the second, and seize the end. I have seen a round
turn taken round the first, and a clove-hitch round the second; either
plan will do, but if neatness is studied, clove-hitch round the second
and third; this will bring the block under the rigging, and out of
sight. If rove single, the block is secured the same way--an eye made
in the end of the brace to fit the yard-arm; the other end rove through
the block on deck, as before.
A whip is sometimes put on the brace, the block spliced in close up
to the cat-harpens, which answers very well. One end of the whip is
spliced into a bolt on deck, the other led through a fair leading
sheave or block.
_Main._--The main topgallant braces are fitted the same as the
fore, with the exception of leading. The standing part is secured
in the same manner to the foremost, or second and third shrouds of
mizen-topmast rigging; the hauling part before all, through lubber’s
hole, and through a sheave in the rack, or a leading block, to the
side abreast of the mizen-mast.
_Mizen._--The mizen topgallant braces are single. An eye is spliced
in one end to fit the yard-arm. The other end is rove through a
single block; seized into a single strap, and secured to an eye-bolt
on each side of the main cap, and through lubber’s hole on deck. I
have seen the
Read full text (200,001 characters)
Fields
| author | William N. Brady |
|---|---|
| language | English |
| chars | 1456316 |
| source_url | https://www.gutenberg.org/ebooks/77729 |
Cite this record
MLA
"The kedge-anchor." Project Gutenberg, n.d., https://gutenberg.go-v.org/record/77729.
Chicago
"The kedge-anchor." Project Gutenberg. n.d.. https://gutenberg.go-v.org/record/77729.
APA
Project Gutenberg. (n.d.). The kedge-anchor. https://gutenberg.go-v.org/record/77729