The Railway Conquest of the World
The Project Gutenberg eBook of The Railway Conquest of the World This eBook is for the use of anyone anywhere in the United States and most other parts of the world at no cost and with almost no restrictions whatsoever. You may copy it, give it away or re-use it under the terms of the Project Gutenberg License included with this eBook or online at www.gutenberg.org. If you are not located in the United States, you will have to check the laws of the country where you are located before using this eBook. Title: The Railway Conquest of the World Author: Frederick Arthur Ambrose Talbot Release date: December 2, 2021 [eBook #66868] Most recently updated: October 18, 2024 Language: English Original publication: United Kingdom: William Heinemann, 1911 Other information and formats: www.gutenberg.org/ebooks/66868 Credits: deaurider, Charlie Howard, and the Online Distributed Proofreading Team at https://www.pgdp.net (This file was produced from images generously made available by The Internet Archive) *** START OF THE PROJECT GUTENBERG EBOOK THE RAILWAY CONQUEST OF THE WORLD *** THE RAILWAY CONQUEST OF THE WORLD [Illustration: [_Frontispiece_ WHERE THE UNION PACIFIC RAILWAY STRIKES ACROSS SALT LAKE The “cut off” across the water is 27 miles in length, of which 15 miles are represented by solid earth embankment.] _CONQUESTS OF SCIENCE_ THE RAILWAY CONQUEST OF THE WORLD BY FREDERICK A. TALBOT AUTHOR OF “THE NEW GARDEN OF CANADA,” “THE MAKING OF A GREAT CANADIA
The Project Gutenberg eBook of The Railway Conquest of the World
This eBook is for the use of anyone anywhere in the United States and
most other parts of the world at no cost and with almost no restrictions
whatsoever. You may copy it, give it away or re-use it under the terms
of the Project Gutenberg License included with this eBook or online
at www.gutenberg.org. If you are not located in the United States,
you will have to check the laws of the country where you are located
before using this eBook.
Title: The Railway Conquest of the World
Author: Frederick Arthur Ambrose Talbot
Release date: December 2, 2021 [eBook #66868]
Most recently updated: October 18, 2024
Language: English
Original publication: United Kingdom: William Heinemann, 1911
Other information and formats: www.gutenberg.org/ebooks/66868
Credits: deaurider, Charlie Howard, and the Online Distributed Proofreading Team at https://www.pgdp.net (This file was produced from images generously made available by The Internet Archive)
*** START OF THE PROJECT GUTENBERG EBOOK THE RAILWAY CONQUEST OF THE WORLD ***
THE RAILWAY CONQUEST
OF THE WORLD
[Illustration:
[_Frontispiece_
WHERE THE UNION PACIFIC RAILWAY STRIKES ACROSS SALT LAKE
The “cut off” across the water is 27 miles in length, of which 15 miles
are represented by solid earth embankment.]
_CONQUESTS OF SCIENCE_
THE
RAILWAY CONQUEST
OF THE WORLD
BY
FREDERICK A. TALBOT
AUTHOR OF
“THE NEW GARDEN OF CANADA,” “THE MAKING OF A GREAT CANADIAN RAILWAY,”
&C.
_ILLUSTRATED_
PHILADELPHIA
J. B. LIPPINCOTT COMPANY
LONDON: WILLIAM HEINEMANN
_Copyright London 1911 by William Heinemann_
PREFACE
There is the unfathomable fascination of romance connected with the
construction of great railways, though little is known of the beginning
and the growth of the great trunk roads of the world; of the heavy tax
which their construction imposed upon the ingenuity, skill and resource
of their builders. Speeding along swiftly in a luxurious Pullman car
over a road-bed as smooth as an asphalt pavement conveys no impression
of the perils and dangers faced or of the infinite labour expended in
the making of that steel highway. To-day the earth is girdled with some
700,000 miles of railways, and there are few countries in which the
locomotive has not made its appearance.
This volume has been written with the express purpose of telling in a
popular manner this story of romance. It is obviously impossible to
deal with every great railway undertaking in the compass of a single
volume; but those described may safely be considered representative,
and they are the largest and most interesting enterprises between the
two poles.
In the writing of this volume I have been assisted by innumerable
friends who have been identified closely with the introduction of
Stephenson’s invention into fresh fields of conquest. I am indebted
especially to the following gentlemen: Messrs. Norman B. Dickson,
M.INST.C.E.; A. M. Cleland, the Northern Pacific Railway Company; the
late J. C. Meredith, chief engineer, the Florida East Coast Railway; A.
L. Lawley; R. R. Gales, M.INST.C.E.; H. E. Gwyther, chief engineer,
the Leopoldina Railway Company, Ltd.; Francis B. Clarke, president
of the Spokane, Portland and Seattle Railway; William Hood, chief
engineer, the Southern Pacific Company; F. A. Miller, the Chicago,
Milwaukee and Puget Sound Railway; the I. R. Austrian Railway Ministry;
W. Weston, the Denver, North-western and Pacific Railway Company; the
Pennsylvania Steel Company; W. T. Robson, the Canadian Pacific Railway
Company; the Cleveland Bridge and Engineering Company, and Frederic
Coleman of Darlington; the Swiss Federal Railways; H. R. Charlton,
the Grand Trunk Railway Company of Canada; the chief engineer, the
New Zealand Government Railways; the Peruvian Corporation; the chief
engineers of the New South Wales, South Australia and West Australia
Government Railways; the Minister of Ways of Communication of the
Russian Empire; the Trans-Andine Railway Company; the chief engineer,
the Imperial Japanese Government Railways; J. J. Gywn, chief engineer,
and S. K. Hooper, the Denver and Rio Grande Railway; G. J. Ray, chief
engineer, the Delaware, Lackawanna and Western Railroad; Virgil G.
Bogue, vice-president and chief engineer, the Western Pacific Railway
Company; and S. J. Ellison of the Great Northern Railway, U.S.A.
FREDERICK A. TALBOT.
HOVE,
_September 29, 1911_.
CONTENTS
CHAP. PAGE
I THE RAILWAY SURVEYOR’S ADVENTUROUS LIFE 1
II THE ROMANCE OF CONSTRUCTION 12
III THE BORING OF THE GOTTHARD TUNNEL 30
IV THE RAILWAY INVASION OF CANADA 46
V THE FIRST TRANS-CONTINENTAL ACROSS THE UNITED STATES 59
VI THE LONGEST “TOY” RAILWAY 76
VII THE WONDERS OF THE TYROL 88
VIII THE RECLAMATION OF ALASKA 102
IX THE HOLY RAILWAY TO MECCA 117
X THE HIGHEST LINE IN THE WORLD 128
XI CECIL RHODES’ DREAM--FROM THE CAPE TO CAIRO
(I. NORTHWARDS FROM CAPE TOWN) 139
XII CECIL RHODES’ DREAM--FROM THE CAPE TO CAIRO
(II. SOUTHWARDS FROM CAIRO) 152
XIII GRIDIRONING THE ROCKY MOUNTAINS 162
XIV THE IRON HORSE IN AUSTRALASIA (I.) 175
XV THE IRON HORSE IN AUSTRALASIA (II.) 186
XVI ACROSS SIBERIA BY RAIL 198
XVII THE LEOPOLDINA RAILWAY 214
XVIII THE FIRST CANADIAN TRANS-CONTINENTAL RAILWAY 224
XIX A RAILWAY OVER THE SEA 240
XX THE LAND OF REMARKABLE RAILWAY BRIDGES 250
XXI WHERE THE SNOW-PLOUGH WORKS IN SUMMER 260
XXII FROM BUENOS AIRES TO VALPARAISO OVERLAND 270
XXIII A LITTLE-KNOWN CENTRAL AFRICAN RAILWAY 281
XXIV THE INVASION OF THE FAR EAST
(I. EARLY DAYS IN CHINA) 289
XXV THE INVASION OF THE FAR EAST
(II. MODERN DEVELOPMENTS IN CHINA AND JAPAN) 297
XXVI THE CONQUEST OF THE CASCADE MOUNTAINS 308
LIST OF ILLUSTRATIONS
_To face page_
Where the Union Pacific Railway strikes across Salt
Lake _Frontispiece_
Building the loftiest bridge in the world 6
Driving a cutting 100 feet deep by the aid of dynamite
and steam shovels through slate on the Delaware,
Lackawanna and Western Railway, U.S.A. 7
A Railway Construction Camp among the mountains 16
Building a high bank on the Delaware, Lackawanna and
Western Railway, U.S.A., by modern methods 16
The huge steam shovel which takes some 3 tons of spoil
with every bite 17
The drag-line shovel which scoops up the earth in the
cutting as it is pulled along 17
The Pecos Viaduct on the “Sunset” Railway, the highest
structure in the United States, the track being 321
feet above the water below 24
The track layer, whereby the metals are laid at a speed
of 3 or 4 miles a day, crossing a heavy timber
trestle 25
The Göschenen entrance to the St. Gotthard Tunnel 32
The wonderful Wassen Loop on the St. Gotthard Railway,
showing three tiers of track 33
The compressed air locomotive which hauled workmen and
rock blasted from the mountain in the cutting of
the Loetschberg Tunnel 36
What the working face in the heart of the mountain is
like 36
The lofty Amsteg Bridge, 184 feet high, spanning the
Maderan Valley on the St. Gotthard Railway 37
No. 2, “The Toronto,” the first railway engine built in
Canada by James Good in 1853 48
The Niagara Cantilever Railway Bridge under construction 48
“The Eighth Wonder of the World” 49
The bridge as reconstructed 49
The magnificent single span bridge across the Niagara
River below the Falls 50
A view of the iron tube, 2,290 feet in length and 23
feet in diameter 51
The 2000 h.p. electric locomotives hauling the
“International Limited” through the tube 51
The massive bridge of the Union Pacific Railway over
the Missouri River at Council Bluffs, from which
point the first railway across the United States
was commenced 62
The timber trestle across Salt Lake, by means of which
the Union Pacific saves 57 miles 63
Building the Otavi line through the German South-west
African Bush 80
The passage of the first train, gaily decorated for the
occasion, over the “toy-like” Otavi Railway 81
The workmen cutting and blasting a narrow path on the
steep mountain slopes for the Karawanken Railway 92
The massive steel bridge which carries the railway
across the Drave River to approach the tunnel
through the Karawanken range in the background 93
The northern entrance to the Karawanken Tunnel 93
The Tauern Railway, showing winding character of the
line 96
The entrance to the Tauern Tunnel 96
One of the huge loops on the Tauern 97
The first hour’s work: navvies preparing the grade
along the main street of Skaguay 106
By railway to the Klondike--the White Pass and Yukon
line under construction 106
The dismal tract of swamp and river through which the
Alaskan Central Railway makes its way 107
The wonderful horseshoe timber trestle, 1,240 feet
long, varying from 40 to 90 feet high, on the
Central Alaskan Railway 112
A wash-out caused by the Placer River in flood 113
The obliteration of the line by a landslide 113
A striking piece of railway building in the Yarmuk
Gorge 118
A bird’s-eye view of a chasm in Palestine, through
which the line follows a winding path on the left 119
A masonry bridge on the Holy Railway, showing
solidity of construction and mountainous character
of the country 119
A heavy steel bridge in course of erection between
Haifa and Deraa, the branch from the main sacred
line to the shores of the Mediterranean Sea 122
The engineering wonder of the Hedjaz Railway--the
sudden descent into “The Devil’s Belly” 123
The railway in the domain of the Genii 124
The lonely path of the Pilgrim’s line through the
silent, rocky and sandy wastes of Arabia 125
Meiggs’ masterpiece--the V-switch by means of which
the railway is lifted from one level to another,
showing turntable and method of operation 130
The Infiernillo Bridge 130
A horseshoe curve in a tunnel 131
The first Verrugas Viaduct, which was destroyed by a
cloudburst and rock-slide 134
The highest tunnel in the world under construction 135
A British locomotive in the realm of perpetual Andean
snow, 15,865 feet above sea-level, on the Oroya
Railway 136
Looking through the tunnels on the Oroya Railway 137
The greatest bridge in the world 144
Setting up the world’s railway building record in Africa 145
Construction train on the way to the railhead crossing
a temporary timber bridge 154
The longest bridge in Africa, 1,300 feet in length,
across the Kafue River 154
The “Hanging Bridge,” one of the railway wonders of
the Denver and Rio Grande, in the Royal Gorge of
Colorado 155
The railway two miles above the sea 166
A “double-header” climbing the cliff of Animas Canyon
on the Denver and Rio Grande Railway 167
Crossing the continental “divide” on the “Moffatt” road 170
The Moffatt Railway playing “hide-and-seek” among the
tunnels in Gore Canyon 171
The gigantic snowplough, the largest yet built, which
keeps the higher levels of the “Moffatt” line
through the Rocky Mountains free from the heavy
falls of snow 172
A deep cutting 173
Boring one of the ten tunnels 173
Before the explosion 180
The blast 180
The cliff-face dislodged 180
The cliff-face broken up 180
The Puttapa Gap Bridge, 200 feet in length 181
The Hookina Creek Bridge 181
The entrance to the tunnel, 1,096 feet long, through
the Darling Range 188
The dearth of suitable water was the serious problem in
the early days of the Coolgardie gold-fields. As
the railway could not haul supplies from the coast,
this novel condensing plant was erected 189
How the Western Australian Eastern Railway cuts through
the Darling Range 194
The Leopoldina Railway is a maze of curves, twists and
bends, owing to the rugged character of the country
traversed 195
A steep bank showing the central rack rail 216
Train on the rack section of the Petropolis division,
showing the curious type of locomotive adopted 216
Rebuilding a bridge on the Leopoldina Railway 217
A flood on the line 218
A derailment caused by the train colliding with a cow! 218
An interesting engineering achievement 219
Bridge over the Parahybuna River, showing height of
river in flood and force of water surging round the
piers 219
The bridge over the Parahybuna River at Campos under
construction 220
The Parahybuna River Bridge completed. Total length
1,113½ feet 220
The rockbound shore of Lake Superior severely taxed the
engineers in the building of the Canadian Pacific
Railway 221
The “Gap,” the eastern entrance of the Canadian Pacific
Railway to the Rocky Mountains 226
Where the “Big Hill” was cut out on the Canadian
Pacific Railway, between Hector and Field 227
How the Canadian Pacific line creeps round towering
precipices along the Fraser River 230
In threading the Fraser River Canyon the engineers
were compelled to hug the waterway, though it
involved the boring of numerous short tunnels 231
The steel arch bridge across Stoney Creek in the
Selkirk Mountains 234
The railway traversing the tumbled Thompson River Canyon 235
The Cisco cantilever bridge carrying the Canadian
Pacific Railway across the Fraser River 238
The Key West “Limited” passing over Long Key Viaduct at
full speed 239
Building the grade. The dredger cutting its own path
and dumping removed spoil in centre to form the
embankment for the track 244
The embankment completed, with the canals dug by the
dredgers on either side 244
How the embankment was built on the keys 245
How the reinforced concrete arches were built within
wooden moulds 245
The training-bund or wall to narrow the Ganges by 3000
feet for the Curzon Bridge, showing railway approach 252
Erecting the piers for the Curzon Bridge 253
The training-bund under construction by native labour.
At the extreme right a pier is being built for the
bridge 254
General view of the pier-building operations for the
Curzon Bridge across the Ganges at Allahabad 255
The Gokteik Viaduct under construction 256
View of the Gokteik Viaduct 257
Train emerging from Reinunga Tunnel, 5,217 feet long,
in distance, showing snowscoop-plough on locomotive 262
Myrdal Station, showing entrance to Gravehals Tunnel,
17,420 feet in length 263
Myrdal Station in winter, showing depth of snowfall 263
A view on the Bergen Railway in winter, showing
screens to protect line from drifting snow, and
snowsheds 266
Mules carrying water in barrels 267
Load of railway metals on a mule’s back 267
Railway building in Nyasaland, Central Africa 282
A typical bridge on the Nyasaland Railway 283
The novel lift bridge over the Shiré River at Chiromo 283
The iron horse in Central Africa 284
The bascules being lowered by cables and winches from
either cliff-face 285
The bascules lowered, showing the French engineers at
centre making the connection 285
The Faux-Namiti Bridge completed 302
The line skirting the seashore near Okitsu, Tokaido, on
the Japanese Government railways 303
The most striking example of Japanese railway engineering 306
Two railways racing to the Pacific coast through the
Deschutes River Canyon 307
The “switchback” by means of which the Great Northern
Railway of the United States negotiated the Cascade
Mountains before the boring of the Cascade Tunnel 310
Building a steel trestle across a rift 311
Building the biggest embankment on record by hydraulic
sluicing 314
The “Merry-go-round” devised to expedite raising an
embankment 120 feet high 315
A lofty embankment in course of construction. In the
centre it is 120 feet high. Construction camp in
foreground 315
Building the Chicago, Milwaukee and Puget Sound Railway
through the Bitter Root Mountains 318
Carrying the Chicago, Milwaukee and Puget Sound Railway
across the Columbia River 319
CHAPTER I
THE RAILWAY SURVEYOR’S ADVENTUROUS LIFE
“One’s experience is varied from camping out in tents at fifty degrees
below zero, to spending a large amount of time in the wilderness, when
provisions are very short and one has to depend upon fish for food.”
This was the description of the task of discovering a path for the
iron road through a new country, as related to me by the late John E.
Schwitzer, one of the most brilliant railway engineers that Canada has
produced, and one who had climbed the ladder of success from the humble
capacity of rodman at a few shillings per week, to the position of
chief engineer of the Canadian Pacific Railway, within the short space
of twenty-two years. From his unique experience he was fitted to speak
with authority, and his statement sums up the life of a surveyor in a
nutshell.
So far as the loneliness and the need to fish for food are concerned
I can speak from experience. This article of diet is plentiful, but
its monotony palls very quickly, while at times one longs for the
excitement of the city. But once this feeling has been lived down one
would not exchange the virgin country, with its invigorating air and
life of exciting adventure, for a smoke-begrimed stifling centre of
activity for any consideration.
In Great Britain, owing to its completely settled condition, the
difficulties incidental to this class of work do not exist. The
wrestles with heat, sun-baked desert, ice-bound forest and extreme cold
have never been experienced in connection with the driving forward of
the ribbon of steel in these islands. There is an utter lack of that
thrilling romantic interest and adventure associated with similar work
in an unknown country, where the surveyor is not merely a surveyor, but
an explorer as well. In any of the four continents beyond Europe he
fulfils an important mission. He is the advance-guard of civilisation.
He spies out the country for the greatest settling force that has yet
been devised, and although the work more often than not is extremely
perilous, he revels in the dangers. One must be prepared to face any
emergency: be ready to fulfil any duty. One may be buried for months
amidst the strongholds of ice-capped mountains, isolated upon the
sweltering desolate expanses of broiling deserts, imprisoned in the
hearts of yawning ravines, or immersed amid reeking dismal swamps, cut
off by hundreds of miles from the nearest town or settlement. Then
Nature is the surveyor’s sole companion, and in her silent company
herculean and heroic tasks often have to be fulfilled, of which the
world at large never gleans an inkling.
The surveyor is the personification of happy-go-luckiness. He pursues
his path doggedly, laughs at obstacles, no matter how forbidding they
may be, and accomplishes glorious deeds unsung. Often his sudden death
through accident, disease or misadventure goes unmourned beyond the
limits of his own camp. Yet an everlasting and omnipotent monument to
his memory is raised--the thin thread of steel which annihilates time
and space.
These men show a devotion to their calling which it is impossible
to fathom. They brave perils beyond conception and face death in a
hundred different forms. It may be a slip on a treacherous foothold
at the brink of a yawning gulch, the upset of a frail bark in a
swiftly rushing rapid, a land- or rock-slide, an avalanche, or a tree
snapping under the fury of the storm which hurries them to their doom.
In silence they suffer the torments of thirst, the pangs of hunger,
physical exhaustion, frostbite, snow-blindness, disease, the hostility
of mankind and a thousand other dangers. When they have emerged from
the ordeal they laugh at their experiences, and consider them no more
fearsome than those confronting the ordinary city dweller as he walks
along a crowded thoroughfare.
As one travels over the railway through Mexico, interest is aroused by
four primitive little wooden crosses beside the track. It is a small
God’s acre in an undulating expanse. The probability is that it would
miss the eye unless one were bent on its discovery. Yet those four
monuments tell a silent story of grim adventure. The Mexican Central
was being driven through a hostile country, and the Indians were being
forced back relentlessly by its influence. They were sullen but not
subdued.
A little squad of four surveyors were busily engaged in pegging out the
path for the line. They were deep in the intricacies of their task.
Suddenly there was a savage blood-curdling whoop. A horde of Indians,
in the full panoply of war-paint and feathers, were bearing down upon
them on mischief bent. The engineers discarded their instruments
hurriedly and grabbed their rifles. They were outnumbered hopelessly,
but undaunted, they kept blazing away, picking off their foes with that
stubbornness born of despair. There were no thoughts of surrender to
the implacable enemy. Nor could they hope for aid; they were too far
distant from their base. One by one they fell, and when at last their
comrades came up, their mutilated corpses were the sole evidences of
that forlorn struggle. To-day those four wooden crosses serve to recall
that grim episode. Such dramatic incidents unfortunately were only
too frequent in the early days of railway building upon the American
continent, though they were far from being peculiar to the New World.
They have been, and still are, repeated occasionally in connection with
such enterprises in other parts of the globe.
It was only a year or two ago that one of the most ferocious acts of
savage barbarity, such as is difficult to parallel in the annals of
railway engineering, was perpetrated in South America. Only the fringe
of that vast territory has been opened up by the iron horse. The
greater part is more unknown to-day than the land around the North Pole.
A small party of engineers set off up country to map out a projected
extension. They plunged boldly into the depths of the primeval forest.
But they never returned. What happened when they disappeared within the
tangled labyrinth of trees no one knows. The time slipped by, and their
comrades outside, fretting at their prolonged absence, grew so alarmed
that a relief party was organised. The worst was dreaded, for the
hostility of the natives to the locomotive was known only too well. The
relief party advanced warily, weapons in hand, ready for the slightest
sign of fight. However, they were safe from molestation, but had not
ventured far into the tangled jungle before they solved the mystery,
and were able to reconstruct a tragic adventure only too realistically.
The steps of the surveying engineers had been dogged silently and
relentlessly by the remorseless savages. When the former had gained a
point sufficiently remote from the belt of civilisation, they were laid
low by poisoned arrows. The relief-party accounted for every engineer,
but one and all were beyond human succour. They were found in a
gruesome row, poised upside down, with stakes driven lengthwise through
their bodies and heads into the ground. They had been pinned down with
no more compunction than the school-boy secures his etymological prize
to a piece of cardboard.
A few years ago British North Borneo was the scene of a similar
disaster. It had been decided to drive a railway from coast to coast,
and a party set out on the reconnaissance, as the first step in a new
railway undertaking is called. The path lay through the dense forest
which had never been penetrated by the white man, and where the dreaded
Head Hunters held undisputed sway. The prospect was forbidding in the
extreme, but it did not dismay the engineers who plunged fearlessly
into the bush. As the crow flies their journey was only one of some
150 miles, but the thick vegetation concealed difficulties innumerable.
That survey was doomed to failure. The party was overwhelmed by the
Dyaks and massacred, with the exception of three native porters who
succeeded in making good their escape. After experiencing terrible
privations, this trio regained civilisation and communicated the sad
tidings of the calamity. For years that stretch of forest defied
conquest. Finally another attempt was made to traverse the jungle, and
on this occasion no interference to progress was offered. The surveyors
gained the opposite coast in about six months, being called upon to
fight only one enemy--disease. It was a desperate plunge, for the party
had to hack and hew its way foot by foot through the matted scrub and
trees.
These afford instances of the hostility of mankind which fortunately
to-day are encountered but seldom. It is the hostility of Nature which
is feared more greatly now. Yet the work possesses a fascinating
glamour. The existence of difficulty only spurs the determined to
further effort.
Railway surveying in the effort to roll back the map in a new country
offers the young man all the adventure in life that can be desired. As
one surveyor who had spent more years than he could remember in the
wilds between China and Peru remarked to me, “If it is not the natural
difficulties or the hostility of the natives which lend variety to the
work, the chances are a hundred to one that a revolution will fill the
gap, especially in China or the South Americas.”
At times the work is exasperating. Perhaps the surveyor who has been
imprisoned for months on end in an inhospitable country has been driven
to his wits’ end to find a practicable location which is immune from
the many disturbances of Nature. By dint of supreme effort finally he
discovers a route which he congratulates himself to be absolutely safe,
only to receive a rude awakening. In the survey of a new line through
the Rockies, the mountains barring the engineer’s path had achieved
an unenviable reputation, owing to the frequency and severity of the
avalanches that tore down their steep slopes every spring. The surveyor
reconnoitred that mountain chain from end to end, observed every path
that the slides had been known to take, searched local records and
questioned aged inhabitants to make himself acquainted thoroughly with
the conditions.
At last he concluded that he had elaborated a path for the railway
which was beyond the destructive efforts of the periodical visitations
and work was commenced. Yet in the first spring, while the construction
train was crawling along with a load of excavated spoil from the
mountain-side, the slipping snow departed from its accustomed path,
and in its descent caught the unlucky train, threw it into the gulch
some distance below, ripped up the metals, buried the grade beneath
thousands of tons of debris, and obliterated every vestige of the work.
The surveyor must be a man not to be daunted very easily in his
enterprise, not to be cast down by heart-breaking failures, and
who has the capacity to gather tangible assistance from apparently
insignificant trifles. The search for a rift through a frowning
mountain wall often is galling in its hopelessness. When the first
Canadian trans-continental line was being forced towards the Pacific
coast, the crossing of the Rocky, Selkirk and Gold ranges puzzled the
surveyors acutely. Walter Moberly, a surveyor to the manner born,
was deputed to complete the conquest of the Gold or Columbia Range.
The obvious path to follow was along the bank of the mighty Columbia
River, and this was taken by Moberly. Yet the Gold Range had to be
threaded somewhere and somehow, though it appeared to defy penetration.
He spent months wandering up and down the river, enduring hardships
indescribable, seeking for the slightest breach through that terrible
wall, wide enough to carry a pair of metals, but no gateway could he
find.
[Illustration: BUILDING THE LOFTIEST BRIDGE IN THE WORLD
The Fades Viaduct spanning the Sioule River in France, 1,526 feet long.
The two masonry towers are each 304 feet in height. The central span,
472 feet in length, was built out from each tower. The railway line in
the centre of the bridge is 440 feet above the river.]
Weary and sick at heart at the fruitlessness of his endeavours, he was
one day returning despondently to camp. He was compelled well-nigh
to admit failure. Suddenly he espied an eagle wheeling over his head.
He followed its movements somewhat nonchalantly, until he saw it make
directly for the Columbia mountains. Then his heart gave a thump! Would
the bird rise and clear their lofty summits or would it sweep through
a rift? Following its flight through the air, he saw the bird give a
majestic dip downwards towards the chain. He turned the head of his
jaded horse, and digging his spurs into its flanks, sped in the wake of
the bird. Onward it flew as straight as an arrow towards a projecting
crest, where it made a sharp turn and was lost to sight.
[Illustration: DRIVING A CUTTING 100 FEET DEEP BY THE AID OF DYNAMITE
AND STEAM SHOVELS THROUGH SLATE ON THE DELAWARE, LACKAWANNA AND WESTERN
RAILWAY, U.S.A.]
Moberly galloped madly forward with his eyes glued to that crag. He
never turned his head, fearing his sight might play him false, and
was oblivious to stumbles and lurches as his steed fell over logs and
slipped among boulders in its mad career. He swung round the crest,
and there before his eyes the peaks were rolled back on either side,
leaving a broad canyon, and of such a character that Nature appeared
to have fashioned it expressly for the advance of the steel highway.
The Columbia range was conquered. It was by pure accident that it
had been found, but it was an accident which culminated a prolonged
industrious quest. Indebted to his success to the monarch of the air
Moberly christened the break in the rocky wall “Eagle Pass,” and it
is through that gulch to-day that the Canadian Pacific makes its way
to the western sea. As one sweeps between the massive ice-crowned
teeth of the mountains one may see the site of the oldest cabin in the
mountains, where the indefatigable Moberly passed the winter of 1871–2
completing the preliminary surveys for the line among the fastnesses of
the Columbia Mountains.
The task of planning the location through such broken country is
attended with the gravest dangers, relieved with exciting adventures.
At places among the peaks a foothold on _terra firma_ for the
manipulation of the survey instruments is impossible. Then massive
tree-logs are lowered into the gulch a few feet above the raging foam
of a wicked mountain torrent, and along this slender staging the
surveyor has to crawl to carry out his task.
Life often hangs upon the veritable thread. It may be that logs cannot
be thrown over the cliff face. Then the surveyor has to don a leathern
waist-belt fitted with a heavy swivel to which a rope is attached. In
this way he is swung over the edge of a cliff to operate his level
and transit along the face of a precipice where no foothold exists.
Sometimes it becomes imperative to have recourse to dynamite to blast
out a ledge along which to advance. Many a promising young engineer
has gone to his last account in work of such a desperate character.
In the survey of what is now the Denver and Rio Grande through one of
Colorado’s yawning canyons, a young assistant had to be lowered in this
manner. Half-a-dozen labourers grasped the end of the rope and steadied
the surveyor in his descent over the perilous edge. From the brink to
the bottom of the canyon was a matter of 200 feet or so straight down.
In a few seconds the young fellow was dangling betwixt earth and sky,
steadying his descent as best he could down the face of the cliff.
Suddenly there was a cry of alarm! The rope-man nearest the cliff edge
noticed that the rope was bearing upon a piece of rock the edge of
which was as keen as that of a razor. The rope had been sawn almost in
two. Lowering stopped. The two men rushed forward to grasp the rope
below the point of pending rupture to ease the strain. But they were
too late. There was a slight tremor, the last strand snapped, and
before the rope-men realised the situation as the end hung limply in
their hands, the cry of the lost engineer as he tumbled through the air
was echoed from the depths of the canyon.
Life in the field is indisputably hard and exacting, and the task
is often aggravated by the scarcity, or monotony, of the food. This
condition of affairs, however, is incomparably better to-day than it
was thirty years ago. The surveyors are tended more thoughtfully than
they were then, and the perfection of food-preserving science has
enabled a camp now to be provisioned with tasty comestibles which
formerly were unknown. Pork, beans and bannock--a substitute for bread
made from flour and bacon fat with a little baking-powder--constituted
the staple articles of diet, varied with fish from the streams, game
from the forests and wild fruits. The bread was often musty, for
immersion time after time in a torrent and storage upon damp ground
did not improve the flavour of the flour by any means. The pork or
bacon often was rancid, while the cook was invariably an execrable
exponent of the culinary art, and his bannock played sad havoc with
the digestive organs of the human body. Little wonder that the men,
under such conditions, sought to secure additions to the menu from the
rivers by methods decidedly unsportsmanlike, but the “end justified the
means”; or delighted in bear steaks and venison.
Extreme altitudes such as have to be attained in order to cross the
Andes undermine the strongest constitutions and render the surveyor’s
work increasingly difficult. Struggling, crawling and slipping among
crags and loose rocks inflicting cuts and bruises is arduous work
indeed, but when the human frame is racked by the tortures of sorochté,
or mountain sickness, the surveyor’s plight is to be pitied in very
truth. In such climes the cold and winds are pitiless, the movements
of the thermometer between midnight and noon are enormous, the
fluctuation in some cases being as much as a hundred degrees in the
course of twelve hours. In the middle of the day the heat is well-nigh
unbearable, and the surveyor gladly discards his outer clothing. At
night he finds it no simple matter to keep warm, for the mercury
descends to a very low level and frost prevails. The winds too are so
cutting and penetrating that it requires elaborate and special clothing
after dark to keep warm.
Now and again a situation develops which relieves the monotony of the
daily round of struggle against the forces of Nature. South America is
pre-eminently the home of these humorous incidents. The concession for
the construction of a railway through one of the tropical republics
had been granted, and no time was lost in pushing forward with the
preliminary surveys. But when the men with the transit and level
reached a certain city they were surprised to meet with unveiled
opposition. The municipal authorities point-blankly refused to permit
the surveyors to carry out their work in the precincts of the city.
Seeing that the latter was to benefit mostly from the steel link, the
attitude was somewhat inexplicable at first sight. A little reflection,
however, upon the South American methods of transacting business
convinced the surveyor that bribery was the root of the trouble. He
reported the interruption to his superiors, whose representatives
hurried to the city to fathom the reason for the unexpected opposition.
It was as the surveyor had surmised. The civic authorities would permit
the iron horse to enter the city if the concessionaries would make a
handsome contribution to the municipal improvement fund--explained the
mayor. “Well, how much do you want?” remarked the concessionaries, who
inwardly had not overlooked this contingency. The mayor could not say
off-hand, and accordingly several delays occurred until this vital
consideration was arranged. As a result of the prolonged parleys the
concessionaries undertook to deliver a certain sum of money to the city.
The bullion was dispatched forthwith and reached the city the night
before payment was due, so as to prevent the authorities to withdraw
from the bargain on the plea that the concessionaries were dilatory.
But law and order were not enforced very strongly, and the surveyor,
with his companions, entertained certain qualms. Accordingly they
decided to mount guard over the building in which they were passing
the night in case of eventualities, at the same time securing a goodly
supply of arms and ammunition.
As the first streaks of dawn lighted the scene the guard thought he
descried the forms of men creeping along the ground in the gloom.
Silently he roused his companions, and with firearms cocked they waited
developments. Not a sign of movement was displayed among the inmates,
and the robbers silently forced an entrance through the windows and
door. Once inside the building they were greeted with a warm fusillade
of lead, and in accordance with the characteristics of their ilk,
they did not stop to reply, but beat as hurried retreat as they could
under the assistance of bullets, leaving some of their number _hors
de combat_. When day broke the besieged party examined the fruits of
their marksmanship, and to their intense surprise discovered that the
dead included the mayor of the city, and one or two of his companions
who had carried out the negotiations for the contribution to the
improvement fund, and who had been so remarkably solicitous concerning
the city’s welfare!
It will be realised that the surveyor who undertakes the plotting of
the line through a new country must be a man of illimitable resource
and capacity, and at the same time ready to meet any development.
It must be confessed, however, that the work, from its adventurous
aspect, appeals strongly to the young engineer anxious to get away from
monotonous routine.
CHAPTER II
THE ROMANCE OF CONSTRUCTION
Though the task of deciding the path for the railway teems with
excitement, adventure and privation, the battle with Nature commences
in grim earnest when the constructional engineer arrives on the scene.
On paper it seems a simple task to follow the location as indicated by
an unbroken row of wooden stakes, but to carry the surveyors’ work to
completion, and to comply with requirements as to grades and curves,
often proves a heart-rending undertaking. No matter how formidable any
obstruction may appear, it is the work of the builder to beat it down;
to overcome it by some means or other with the minimum of expense. He
must be baulked by nothing.
Such a task demands a man of illimitable resource and infinite
ingenuity, conversant with every phase of civil engineering. At the
same time he must possess the happy faculty of being able to organise
great armies of men of all nationalities, and in such a manner that he
can get the utmost out of them. This is a searching difficulty. The
camp of to-day upon a large railway undertaking is a heterogeneous mass
of humanity; the confusion of tongues at the Tower of Babel could not
have been more embarrassing. I have lived among the camps of Canada
and the United States, and among a hundred men it has been no uncommon
circumstance to find representatives of a dozen different tongues.
The control of such men is rendered all the more complex for the
reason that in the majority of cases they have little or no knowledge
of any language but their own. It is not until they have been in one
another’s company for several weeks that inter-conversation becomes
possible. In addition to this drawback there are always the peculiar
troubles incidental to racial and religious prejudices confronting the
commander-in-chief, and at times he is hard pressed to preserve order
and authority.
This trouble is not experienced to any great degree in connection with
railway building operations in Great Britain, but abroad the initial
difficulties of this character are exasperating to a superlative
degree, more especially where reliance has to be made upon native
labour. The workmen have to be educated into the use of labour- and
time-saving implements. This is no easy matter. The native entertains
strong opinions concerning his own ability, and the conversion from the
primitive to the up-to-date scientific has to be effected gradually and
unconsciously, a task which demands considerable tact and patience. A
great amount of time must be expended necessarily in the early days to
drill such raw material, but perseverance and an equable temper are the
only virtues. In Mexico the railway pioneers found it almost hopeless
to impress upon the pæons, as the navvies are called, that to carry
ballast in a basket slung upon the back was not to be compared in speed
and efficiency with conveyance by small trucks pushed along a tramroad.
It was only by carrying out the work themselves in this more modern
manner that the engineers could teach them the superior advantage of
this method, with its sparing of effort and fatigue. In fact, the only
way one can convert the raw native to ideas entirely foreign to his own
custom is to show him how he can save himself trouble. Then he will
adopt the idea with alacrity.
Now and again, however, the white man, despite his ingenuity in the
devising of time-and labour-saving appliances, has to bow to the
inevitable. For instance, in India the Hindoos toil at such a low daily
wage that in many phases of work the wonders of mechanical invention
cannot compare with their crude efforts in cheapness. It comes as a
heavy blow to the engineer’s pride to realise that he must abandon his
elaborate plant and that the native holds the balance between failure
and success.
Again, in the South Americas the _laissez-faire_ attitude of the
inhabitants galls him to the quick. In the southern part of the New
World the policy is “Never do to-day what can be done to-morrow,”
and the native acts up to the very letter of the aphorism. Religious
festivals, each of which is regarded as a holiday, occur with the most
tantalizing frequency. It is no uncommon circumstance for two or three
such orgies--they scarcely can be described as anything else--to occur
in a week, and the labourer is a commendable zealot in the observance
of the religious feasts. The engineer may fret and fume at the delay,
but unless he is in a position to recruit outside labour he must
tolerate the frequent interruptions in the work with the best grace
he can muster. In the mountainous regions of South America the native
knows only too well that he holds an unassailable advantage, for he
is accustomed to the rarefied atmosphere encountered in the extreme
altitudes, whereas it plays sad havoc with the strongest constitutions
of Europeans.
Strange to say, one of the most conscientious workmen in railway
building, as in other fields of industrial endeavour, is the Chinaman.
From a cursory point of view this appears inexplicable, but it must
be borne in mind that a Celestial’s word is his bond. Johnny will
haggle and argue for hours over a bargain, but when he finally accepts
the terms he will fulfil the contract to the letter, even should he
ascertain before he has completed the task that it involves him in a
personal loss. I have seen these men pick up their tools as the clock
struck the hour for commencing the daily task, plod along quietly and
continually until the hour of cessation, and give an indisputably good
return for their daily wage. Can the same be said of the workmen of
any other nationality? I am afraid not. In fact, the steadiness of
the Chinaman has become so famous and has proved so reliable that it
is safe to say that many of the biggest railways of the day never
would have been completed but for his aid. It enabled the first
trans-continental line to be carried across the United States to link
New York with San Francisco; through Oriental labour the Canadian
Pacific was consummated, and many another great undertaking of a like
nature could tell a similar story.
The same spirit prevails when the scene of activity is removed to China
itself. The Celestial may entertain quaint ideas concerning the iron
road and its scope of utility. He may slave hard to-day laying the
track, merely to pull it up again on the morrow on the plea that it is
disturbing the spirits of his ancestors. But nevertheless he completes
his part of the bargain in the first instance. Strikes are unknown and
disputes never arise unless the employer declines to stand by his side
of the contract. China is permeated through and through with secret
societies or Guilds--Trade Unions, if you like--to one or other of
which every Celestial belongs. The white engineer when he first arrives
in the country finds it very difficult to make headway, but in reality
he is on probation in the eyes of the Orientals. They are watching
closely his methods, fathoming his code of honour, his capacity for
handling men--in fact, are investigating him just as closely as if he
were under a microscope. Once he has established his reputation and
has inspired confidence, he need entertain no further apprehensions
concerning trouble.
Yet the Celestials have their own peculiar and effective way of
settling disputes among themselves. The engineer in need of a few
thousand men negotiates for brawn and muscle through a middle-man
or labour contractor. The engineer concludes his bargain with this
worthy, and the latter makes his own terms with the men. He recruits
the navvies at a certain wage, which he takes care to leave him a
wide margin of profit. Occasionally he will be too grasping and will
resort to sweating tactics. When the labourers find this out trouble
looms ahead. The men report the matter to their Guilds, who take the
avaricious middle-man in hand and make him disgorge some of his
ill-gotten gains. If he refuses, well, one day the contractor is
missing, and never is seen again by the engineer. No questions are
asked and no explanations for his disappearance are offered. He has
settled his account with the Guilds to his own personal disadvantage.
The engineer, however, knows nothing about the dissatisfaction until he
observes the absence of the contractor, for the work meantime continues
its daily round undisturbed.
Although labour is a vital consideration, it is but one cog in the
complex machine by means of which the iron road is driven forward
through a new country. Without tools the efforts of the navvy would
count for naught, and as time has rolled by inventive effort and
engineering skill have contrived more and more wonderful devices to
enable the epoch-making work to be fulfilled in the shortest space of
time. There is the steam shovel, which will remove two and a half cubic
yards of miscellaneous rubble with every swing of its ponderous arm;
the grader, whereby the soil is ploughed up and displaced by an endless
chain of buckets into capacious wagons for removal; the drag shovel,
a huge scoop attached to the end of a chain which is pulled along the
ground from a stationary point by steam power, becoming charged with
material in its progress, and thus fashioning the cutting; the monitor,
whereby tons of gravel are washed down the mountain-side under the
disintegrating force of a powerful jet of water similar to a fireman’s
hose; and a host of other wonderful implements, all devised for the
express purpose of expediting the work in hand. Gunpowder and dynamite
are invaluable handmaids, and to-day are used with an astonishing
prodigality. Indeed, when the advance is through rock their services
are indispensable. Crags, cliffs and even whole hills are blown away
bodily by their agency, and the cost often runs into thousands of
pounds, miniature volcanoes being produced by the upheavals.
[Illustration: A RAILWAY CONSTRUCTION CAMP AMONG THE MOUNTAINS]
[Illustration: BUILDING A HIGH BANK ON THE DELAWARE, LACKAWANNA AND
WESTERN RAILWAY, U.S.A., BY MODERN METHODS
An overhead cableway was stretched across the depression, from which a
swinging line was suspended, and on which the trucks were backed to be
emptied.]
Those who have travelled over many remarkable railway systems in
various parts of the world where striking evidences of the
engineer’s skill are apparent upon a liberal scale, have pointed to
the absence of any such evidences of activity in these islands--“The
Home of the Railway.” But this to a certain degree is inevitable. The
engineer was not faced with such physical conditions when he essayed
to gridiron this country as confronted him in the Americas or Asia.
There are no towering ranges of eternally snow-wreathed mountains to
overcome, no wildly boiling wide rivers to span, no yawning canyons to
thread or stretches of sterile desert to traverse. Yet when Stephenson
and his contemporaries sought to achieve the railway conquest of Great
Britain they encountered many obstacles which to them, with their
crude appliances, were every whit as stupendous as those which rear up
before the engineer to-day, although he is equipped with an extensive
assortment of heavy artillery to assist him in his contest against the
forces of Nature. Moreover, some of the expedients which Stephenson
evolved to overcome a difficult situation are practised to-day merely
because the intervening eighty years have not provided any better
solution of a problem of a similar character.
[Illustration: THE HUGE STEAM SHOVEL WHICH TAKES SOME 3 TONS OF SPOIL
WITH EVERY BITE]
[Illustration: THE DRAG-LINE SHOVEL WHICH SCOOPS UP THE EARTH IN THE
CUTTING AS IT IS PULLED ALONG
THE RAILWAY BUILDERS’ HEAVY ARTILLERY]
Every one has read how Stephenson was for a time nonplussed by the
treacherous bog Chat Moss, across which now speed the expresses of the
London & North-Western railway. It is the largest stretch of swamp in
the country, and many wiseacres prophesied that there Stephenson would
meet his Waterloo when he essayed to carry the Manchester & Liverpool
railway over its unstable surface. Yet Stephenson plodded along
unconcerned and achieved success in a novel manner. He laid branches
of trees and hedge cuttings upon the surface of the bog, and upon the
softest patches pressed hurdles intertwined with heather into service.
Upon this network he laid a layer of rock and gravel, which caused the
foundation to sink somewhat into the morass. This formed the permanent
way, and its peculiar character provoked more than one scornful
criticism. But its stability confounded the critics.
To-day in foreign countries where huge stretches of swamp bar the
progress of the iron road the self-same principle is adopted, and it
is known as “corduroying” or “cross-waying.” In the northern States,
Canada and Siberia--the latter country and Canada especially--the
“muskeg,” or “tundra,” as this treacherous land is called, often
stretches for miles. One can sound it sedulously to a great depth, and
then will fail to touch the bottom. The soddened decayed vegetable
matter merely fills a large depression which cannot be drained.
The builders waste no time attempting to build up a solid earthen
embankment resting on the submerged solid floor of the bog. They
fashion a huge mattress of trees. Large trunks are laid horizontally
and longitudinally to the track. Upon these are laid transversely two
or three layers of shorter logs, the whole being secured together
firmly. A topmost layer of branches forming a kind of thatching
completes the structure.
At times these mattresses assume respectable proportions. I have stood
beside some almost as thick as a man is tall, and they constituted
quite formidable pieces of work. When the corduroy is completed a
layer of rock is applied, and upon this is dumped the gravel and other
material forming the embankment. Under the weight thus superimposed the
mattress sinks deeply into the morass and rests firmly. The earthen
ridge is continued to the requisite height; the whole of the embankment
for the track rests upon the fabrication of tree-trunks. Yet the whole
is just as solid as if resting upon granite. One might remark that it
appears an indifferent foundation upon which to pile up a mass of earth
weighing several hundred tons, and that in a short time the wood, under
decomposition and collapse, would precipitate a subsidence. But as a
matter of fact, the corduroy grows stronger with every passing day.
The wood immersed in the viscous liquid and preserved from all contact
with the atmosphere becomes waterlogged, until at last it assumes the
character of bog-oak and is practically indestructible.
Stephenson was called upon to cope with another critical situation
upon the same railway. The great tunnel at Kilsby was in course of
construction, but work had not proceeded very far when the contractors
struck a large pocket of water and quicksand. They combated this
adversary for several months, and then, unable to make any appreciable
headway, threw up the contract. Efforts were made to induce other
firms to accept the task, but in vain. At last Stephenson was called
upon to rescue the undertaking from failure. The outlook was far from
promising, for the shaft was being sunk through material which the
engineer always regards askance--a shale--while the fault in which
reposed a large volume of water and sand was of large proportions.
Stephenson concluded that the best way to cope with the problem was to
pump out the water first, and accordingly he rigged up an elaborate
plant capable of handling 1,800 gallons per minute, and this was kept
going day and night. Even then, however, it was only by superhuman
effort that the water was kept down. One day after Stephenson had been
on the scene about six months, the water got the upper hand and flooded
the tunnel to such a depth that the men and materials had to be floated
in on rafts.
This undertaking, however, served to demonstrate to those anxious to
participate in railway-building speculations how estimated expenses
for definite work might be sent astray seriously, and how formidable
and ubiquitous was the unexpected factor in such work. The original
contractor offered to complete the burrow, 7,169 feet in length, under
the Kilsby Ridge for some £90,000. By the time the last brick of the
lining had been laid and the tunnel was ready for use over £300,000 had
been expended.
The attempt to pierce this tunnel at that time, however, was a far more
difficult enterprise than it would be to-day. The engineers had not the
powerful marvellous appliances such as serve the contractor’s purposes
now. Electric energy was unknown, the hydraulic shield for driving
tunnels had yet to be invented, the steam shovel had not been thought
of--in short, the contractor was handicapped on every side by the crude
character of his tools. Some of these appliances which the modern
railway-builder uses are little short of wonderful, both in time- and
labour-saving qualities, and the majority have been born of necessity.
For instance, in the early railway days on the American continent
too much time would have been occupied in building lofty earthen
embankments among the mountains. Accordingly the rifts and gullies were
spanned by timber trestles. But the woodwork was perishable, and there
was always the risk of fire demolishing the structure and precipitating
disaster to a passing train. The obvious remedy was to replace the wood
by metal, but the expense was a deterrent factor.
One day a workman on one of the mountain sections suggested that the
woodwork should be left intact, but buried beneath a mass of earth.
The suggestion was received with ridicule because, as the divisional
engineer pointed out, several thousand men and several hundred trucks
and dozens of locomotives would be required to handle the material,
while the time the task would occupy was incalculable. The workman
listened to the criticisms, and then interposed with the quiet comment
that he did not suggest using any trains and trucks, and that a few
dozen men would be ample to complete the work. The divisional engineer
was somewhat astonished, and at first thought the man had taken leave
of his senses. Then the workman revealed his intentions. He would
not resort to steam shovels or any other device of that character.
He had observed minutely and tested the power of a jet of water, and
consequently had conceived an idea to wash down masses of gravel by
means of very powerful jets of water. There was no need even to rig
up a steam engine and pump to supply the requisite force to the water
flying from the nozzle. High up on the mountain-side was a creek. A dam
could be thrown across this torrent at little cost, and the pent-up
water could be led down to the working site below through piping, and
the pressure thus secured by gravitation would be more than ample for
the purpose. The gravel as washed out of the hillside would be directed
into wooden conduits and led to points around the trestles, where it
would be discharged to build up the embankment.
It was a simple means of overcoming a perplexing difficulty. The
divisional engineer was so impressed with its feasibility that he
secured the requisite permission for the workman to put his suggestion
into practical form. The creek was dammed by throwing trees from
bank to bank, and from the little pond thus formed the water was led
several hundred feet down the mountain-side through pipes to the large
nozzles. A small network of timber conduits were fashioned to convey
the displaced gravel to the feet of the timber trestle.
In a short time work was commenced, and as the jets of water struck
against the solid face of the mountain, the soft earth and gravel were
washed out at tremendous speed. Heavy streams of mud poured down the
conduits. The hill disappeared like magic under the scouring action of
the harnessed water, to reappear in a symmetrically-shaped ridge around
the woodwork, which grew rapidly in height until the level of the
railway was gained. The embankment thus formed was found to be as solid
and stable as if built by dumping, and the whole task was accomplished
in a few weeks. While the work was in progress the chief engineer
and his lieutenant visited the spot and watched the building of the
embankment by hydraulic sluicing with intense interest. Its complete
success in this initial experiment secured its adoption, and in a short
space of time, where the conditions permitted, all the trestles among
the mountains were buried beneath a ridge of earth built up by a jet of
water.
While I was being shown some of the most impressive pieces of railway
engineering among the Cascades, my cicerone, an English engineer and
railway-builder, after describing the features whereby the Great
Northern railway is taken down to the coast, remarked, “I wonder what
Brunel would have done among these mountains? I guess he would have
revelled in the difficulties they offered.”
There is no doubt that the great engineer would have found the ascent
of the steep slopes and the crossing of the great gulches an extensive
field for the exercise of his genius. His work among the vales of
Cornwall and along the rugged seashore of Wicklow, Ireland, indicate
this fact only too plainly. In these two districts are to be found the
nearest approaches to spectacular work that these islands can afford.
True there are no wonderful loops and great terraces winding up and
down mountain-sides, but there is the daring and lofty spanning of
yawning valleys, and the driving of a narrow pathway along steep rocky
slopes.
For something like half a century Brunel’s spidery timber viaducts of
Cornwall constituted one of the sights of that county. The location,
with its grades and curves, as carried through Cornwall, has been
assailed by many critics, but it must be remembered that when Brunel
penetrated the English Riviera, railway operation was very different
from what it is to-day. Engines and train loads were light, while
money was by no means plentiful. The engineer was compelled to
achieve his object at the most moderate cost, but the very fact that
he was hampered in this connection served to influence him in the
accomplishment of monumental work. His timber viaducts were remarkable
for the novel character of their design and their extent. In the course
of sixty miles he had to span no less than thirty-four valleys in this
manner, the aggregate length of the wooden structures being about four
miles. The engineer adopted timber as a constructional material because
it was cheaper than iron, and American oak was used extensively. Some
were of great height, the St. Pinnock viaduct, for instance, carrying
the train 153 feet above the bottom of the valley, while others
attained great lengths, the Landore viaduct measuring 1,760 feet from
end to end.
These evidences of Brunel’s work, however, are disappearing under the
exigencies of to-day. Timber is being replaced by steel and granite to
meet the increased weights and speeds of trains. The location through
the county also is undergoing revision, the sharp curves introduced by
Brunel being eased or eliminated, while the grades are being flattened.
Consequently in a few years the name of Brunel in Cornwall will be
naught but a memory. Fortunately other evidences of his handiwork
abound on this system notably in the Saltash, Chepstow and Maidenhead
bridges, as well as the Box and Foxwood tunnels.
In Ireland, however, a far more daring expression of his skill is
offered. This is the stretch of line along the seashore between Bray
and Wicklow, which now forms part of the Dublin & South-Eastern
railway. This was the first stretch of iron road to be opened in the
Emerald Isle, the original one and three-quarter miles being operated
in the first instance by the system of atmospheric propulsion, whereby
the train was hauled along the metals by suction.
When it was decided to connect Wicklow with Bray, the trying character
of the country lying between the two points, and especially of Bray
Head, demanded a masterhand to effect the location and to carry the
building operations through to success. It was a matter of sixteen
miles, but they proved perhaps the most trying sixteen miles of railway
construction ever attempted in this country. It was stated that Bray
Head would defy conquest, for it was approachable only through very
rocky country, and it is quite possible that the gloomy outlook
was responsible for tempting Brunel to achieve something bold and
striking. There was no need to have carried the line in this direction,
a fact which is realised to-day, for by making a detour inland an
easier location could have been found, and the present generation
would not have been called upon to pour out heavy sums of money to
keep their line intact. Brunel’s vanity has cost the railway company
several thousands of pounds since the line was opened. It is only by
superhuman effort that the railway is not devoured by the sea, over
£40,000, or $200,000, having been expended in defence works over this
sixteen miles of line during a period of ten years alone.
Apart from this unsatisfactory feature the line is a constant source
of anxiety. A little to the south of Bray is Bramstone tunnel and a
wild ravine. This gulch attracted the engineer. Instead of avoiding
it, he bridged it with a wooden viaduct 300 feet long by 75 feet high.
Before it was quite completed it was destroyed in a single night, the
demolished timbers being carried out to sea. A few years later, while
a train was crossing, the engine left the metals and precipitated a
sensational accident. Investigation revealed the fact that it was due
to the action of the waves, which, battering against the piers of the
viaduct, had so vibrated the structure as to throw the rails out of
gauge.
Thereupon it was decided to abandon the viaduct and drive the line
directly through the rocky promontory. The traveller still can see
traces of the original route in the decaying approaches to the gap
formerly conquered by a timber trestle.
[Illustration:
_Brack, photo_]
THE PECOS VIADUCT ON THE “SUNSET” RAILWAY, THE HIGHEST STRUCTURE IN THE
UNITED STATES, THE TRACK BEING 321 FEET ABOVE THE WATER BELOW]
Still it was a grim fight with Nature for every foot of the way. A
mere ledge suffices to carry the track, and this gallery is often at a
level of seventy feet above the sea beneath. Here and there the line
is enclosed by a roof recalling the snow-sheds of the Selkirks or
Cascades, to protect the rails from stones bouncing down the cliffs.
Curiously enough, the method in which Brunei drove his line along this
forbidding wild shore recalls the staggering feats accomplished in the
American mountains, and indeed a journey over this railway will provide
a thrill in miniature such as results from a toil through the mountain
backbone of the New World. The dislodgment of massive boulders and
landslides are so frequent that flagmen have to be retained to keep a
vigilant eye on the track and to warn passing trains. At places long
walls have been erected high on the hillside to arrest the descent of
the movements of loose rock on the one hand, while on the other the
cliff face has been cut into terraces to break the force of the waves,
and together with retaining walls and groynes, seek to counteract the
insidious erosion of the sea.
[Illustration: THE TRACK LAYER, WHEREBY THE METALS ARE LAID AT A SPEED
OF 3 OR 4 MILES A DAY, CROSSING A HEAVY TIMBER TRESTLE]
When Bray Head has been passed the physical character of the country
changes with startling suddenness from jagged rock to clay. Here the
engineer was brought to fierce grips with his adversary. The clay is
honeycombed on all sides with springs, and there is a constant war
between the engineer and Nature for supremacy. Building the line was
exacting indeed, but the puzzles which had to be unravelled then are
equalled by those attending the preservation of the road. The battle
was waged relentlessly for some years, but the sea won; the engineers
were compelled to re-lay their track some distance inland.
The shareholders in the railway are paying dearly for Brunel’s colossal
error. Indeed, it is a poor return for an outlay of over £400,000, or
$2,000,000, which were sunk in this sixteen miles of line. It may be
wonderful engineering, but it is not business. The railway company are
anxious to abandon this location and to rebuild the line along the
route it should have followed in the first instance. At the present
such a result is not financially possible, but its realisation is
merely a question of time.
One inspiriting phase of the railway-builder’s work is the race
against time, and in the fulfilment of such a task many an astonishing
performance has been achieved. When one of the great American railways
was pushing its way to the Pacific coast, it required a tunnel to be
driven for two miles through the Cascades. It was a daring piece of
work, and the railway company, after considering the scheme, decided
that it could be accomplished cheaper and more quickly under contract
than by direct labour. Upon the advice of their surveyors they set the
time for its completion at twenty-eight months. Considering the remote
situation of the work the feat was considered absolutely impracticable,
and no recognised contractor could be prevailed upon to incur the risk.
The company, however, was convinced that some daring spirit existed who
could, and would, fulfil their requirements, so they advertised for
tenders. When these were perused it was found that one man was willing
to meet the time-limit and at a price far below competitors. His bid
was accepted. That man was Bennett, and he lost no time in setting his
carefully-laid plans in motion.
He was over three thousand miles from the country in which the tunnel
was to be driven, yet before the ink on the contract was dry he had
wired to his assistant on the Pacific coast to hurry forward all
requisite appliances, while he himself purchased an elaborate plant of
the most modern type to be shipped to the railway point nearest the
site. From this station he had to transport every ounce of material for
a distance of eighty-two miles through the roughest and most broken
mountainous country it is possible to conceive.
There was no road, so he had to blaze one through the deadfall and
littered rock, fording creeks and streams and toiling through viscous
mud. The wagons sank above the axles, and had to be hauled through the
muskeg by block and tackle. In this way, by sheer physical effort,
he gained the mountain which was to be pierced. It took him a solid
six months to get his forces and artillery to the spot, leaving him
scarcely twenty-two months in which to hew the passage through the
solid rock.
So pressing was time that he never permitted an hour’s cessation day or
night. An agent on the coast recruited men by the score and dispatched
them up country in large corps. As they arrived they were divided into
six-hour shifts on either side of the mountain, and in this way toil
was continued unbrokenly throughout the whole twenty-four hours. When
he had settled down to work in grim earnest wages were absorbing money
at the rate of nearly £2,000, or $10,000, per week.
Preliminary to embarking upon the contract he had prepared careful
calculations showing him how much rock it was requisite to remove every
day to effect completion in time, and he made up his mind to hold to
this table by hook or by crook. A tunnel face is not a spot where much
leeway can be made up, for only a certain number of men can be crowded
upon its limited area. But he met this disadvantage by spurring the
drillers to superhuman effort by the offer of an attractive bonus. In
this way he was able to maintain the advance he had calculated per
day until the heart of the mountain was gained, when owing to the
extreme hardness of the rock the men could not help falling behind the
scheduled progress. Now and again, however, when they encountered a
softer stretch of material they were able to make up lost time.
The months sped by; the contracted time for completion loomed nearer
and nearer. Determined not to be beaten, Bennett urged his drillers
harder and harder, offering fancy wages for additional effort. The
strain wore him almost to a skeleton; he scarcely slept, so haunted was
he by the determination to fulfil his side of the bargain. Checking and
rechecking of the finished work convinced him that the opposing parties
could not be far apart in the heart of the Cascades.
One morning the men on one side paused momentarily in their drilling.
They could hear the faint muffled chink, chink of drills. It was the
party advancing from the west. With a loud cheer, answered by a ghostly
sepulchral hurrah, both parties bent to their tasks with redoubled
energy. Before long a gaping hole was revealed in the heading. The two
forces had met--the tunnel was pierced. Without hesitation they set
to widening the breach out to its appointed dimensions, and at last,
with a sigh of relief, threw down their tools. The tunnel was finished
practically, and there were seven days or so to spare.
In another instance a railway company required a bridge to be opened
within a certain period. Its accomplishment on time meant the accretion
of a large sum of money to the treasury, and accordingly a bounty of
some £5,000, or $25,000, was offered to the firm building the bridge.
The latter in turn offered a portion to the men responsible for the
actual work. Under the incentive of this offer the riveters and
erectors strove might and main. The odds were against them hopelessly,
but general co-operation enabled the work to go forward with great
speed. By maintaining this high pressure the huge fabric assumed its
definite shape in quick time, and the last rivet was driven home with a
resounding cheer a few minutes before the expiration of the stipulated
time.
Yet railway construction has its farcical side, especially in America.
Conflicting interests often clash, and then lively times ensue. In
Canada it has been no unusual sight to see an existing railway rush a
large gang of workmen to a point threatened with invasion by a rival.
Their presence ostensibly is to improve the line in possession, but in
reality the men are drafted there to thwart the competitive enterprise.
This is the “fighting gang,” and it is rightly named, because the
opposing forces often meet and a free fight results.
When these tactics are waged by opposing railway magnates the
struggle is often bitter and long drawn out. It was so when J. J.
Hill and Harriman came to close grips in Oregon. The former great
railway-builder decided to carry a line down to the coast along
the bank of the Columbia River. Harriman construed this act as an
invasion of his preserves, and spared no effort to defeat the “Grand
Old Railway-Builder of the West,” as J. J. Hill is called popularly.
Directly Hill’s proposals became known, Harriman, to secure his legal
status, revived a defunct project known as the “Wallula Pacific
railway,” which had been incorporated so many years before, and yet had
accomplished so little, as to be forgotten. Hill was coming down the
north bank of the Columbia, and suddenly Harriman discovered that his
moribund project was to follow the same course. The result was that
two rival constructional forces appeared on the scene, one bent on
building a line, and the other determined to prevent its realisation.
A hail of rock rained from one camp to the other, and the grade was
demolished as rapidly as fashioned. One day the Hill navvies were in
possession, the next, through being outnumbered, they were driven out
and the Harriman army held the position, only to evacuate it when
the former reappeared with reinforcements. No blood was spilt, but
it came perilously near it when a navvy on one side threw a piece of
rock harder against an opposing workman than the latter appreciated.
Injuries were numerous, and one day the aspect became so threatening
that a pitched battle appeared certain. At times, however, the battle
became Gilbertian. The rivals merely played catchball with pieces of
rock, tossing the missiles at one another with considerable banter and
amid a rain of jokes.
For eighteen months this state of affairs prevailed, and then the
courts deciding against Harriman, he was forced to retire from the
scene. Directly he did so, his gangs of navvies walked over to the
opposite camp, because from their point of view Hill’s money was just
as good as that of Harriman. It was immaterial to them for which side
they worked, so long as they were paid for it. The result was that the
two gangs which had been engaged in more or less deadly strife, now
worked harmoniously side by side to carry the Hill line into Portland.
Such tactics as these, however, come somewhat as an interlude to the
grim tussle with Nature which is the railway-builder’s invariable lot.
CHAPTER III
THE BORING OF THE GOTTHARD TUNNEL
The little country of Switzerland, as is well known, is a tumbled mass
of snow-clad mountain ranges. On the Italian frontier, however, this
natural barrier becomes more rugged and defiant, some of the peaks
towering 10,000 feet or higher into the clouds. For centuries this
frontier chain so successfully walled in the Helvetians that they could
not pass into Italy without making a wearisome detour. Travelling from
one country to the other before George Stephenson demonstrated the
possibilities of the steam engine running on rails, therefore, was a
journey not to be lightly undertaken, for it occupied weeks. An effort
to ease this situation was made so far back as the thirteenth century
by the blazing of a footpath over the St. Gotthard, but it was a mere
dangerous and dizzy trail. Little wonder, therefore, that it was not
favoured by other than the more adventurous.
It was not until about a century ago that the first vehicle lumbered
over this rugged hump. Then the demand for closer communication between
the two countries prompted the ambitious Helvetians to embark upon a
costly and momentous enterprise--the building of a postroad over the
mountain. They cut a roadway 18½ feet wide, with an average grade of 10
per cent. to a height of 6,936 feet up the flanks of this snow-topped
giant, with its deep rifts, rushing rivers, and faced the terrors of
the avalanche. It is a striking piece of work, for at places the road
clings, limpet-like, to perpendicular walls, describes sharp twists and
turns sudden corners. Although the people could ill afford the expense
of the undertaking, they carried it to completion, confident that
untold benefit would accrue from its provision.
They were right in their surmise. That mountain road changed completely
the direction of the stream of traffic flowing between Switzerland and
Italy. The novelty of the route, the magnificent panoramas unfolded
from every foot of its length, appealed to the tourist and traveller
and they bravely essayed the “pass.” To-day that mountain road is
trodden but seldom. It has fallen into desuetude; the railway has
killed its utility.
So soon as the iron horse invaded the little country it was sought
to carry it into Italy via the St. Gotthard; not over the mountain
crest, but through its base. Every engineer nursed the ambition to
overcome that frowning knot with the steel highway. For years brilliant
minds lived, dreamt, and died obsessed with this one great idea. Even
in 1846, when the first railway was opened from Baden to Zurich,
preparations were made to carry the line onward through the mountain
chain. To the Swiss people, boring through a mountain for nine miles or
so appeared no more difficult than burrowing through a hillock for as
many yards. It was only a question of time and expense.
An “Alpine tunnel fever” set in with terrible malignancy, and there
was fierce rivalry and jealousy created between the various railway
companies, cantons and towns as to who should have the honour of
completing this remarkable link. Fortunately the Government itself
preserved a cool head, turned a deaf ear to entreaties, refused
concessions, and discouraged any possible hope of financial aid. The
last-named factor proved the greatest stumbling-block, but there is no
doubt that if the money could have been obtained for such an enterprise
an attempt to tunnel the Alps would have been made in the ’fifties.
Though the ambition was scotched it was not killed by any means, for a
few years later the same scheme was revived and more keenly discussed
than ever. The French and Italian nations resuscitated the project
by co-operating in the effort to pierce the Col de Fréjus, popularly
known as the Mont Cenis tunnel. The first stroke of the pick-axe upon
this momentous enterprise was made in August, 1857, and the two chief
engineers, Grattoni and Sommeiller, pledged themselves to complete the
task with the assistance of the French and Italian governments. In
the face of the most terrible difficulties that could be conceived,
equipped with tools which appear puny and futile in comparison with
those used for such work to-day, they cut, blasted, and excavated
their way through 7½ miles of dense rock. Boring from either end, the
rock-hogs broke down the last wall of rock on Christmas Day, 1870, and
in September of the following year a shorter and more direct route
between the two countries was opened to traffic.
The progress of this tunnel was watched with the closest interest by
the Helvetians. This piercing of an Alpine mountain was something new
in railway engineering. The wiseacres croaked that it would never be
completed; that Nature would spring some sudden surprise upon the
engineers in the depths of the mountain which would arrest the whole
enterprise. But as the two headings slowly but surely approached one
another, and the engineers broke down their obstacles as they arose
with commendable pluck and determination, the sceptics became silenced.
[Illustration: THE GÖSCHENEN ENTRANCE TO THE ST. GOTTHARD TUNNEL
Work was commenced at this point on June 4, 1872. The huge task was
completed and the line opened for traffic on May 22, 1882.]
The pride of the Swiss was wounded. If the French and Italians could
accomplish such a herculean and apparently impossible task, why was
a similar idea beyond their powers? The “conquest of the Alps” broke
out with renewed vigour. It became more than a personal issue; it
blossomed into one of economic, political and commercial importance.
Consequently, before the Cenis Tunnel was opened for traffic, the
preliminary arrangements for burrowing through the St. Gotthard had
assumed concrete shape. But it had been a wearisome enterprise. The
promoters had to battle against intrigue and jealousies innumerable
on the part of private individuals, companies seeking for the same
concession, towns and departmental governments. But the project became
one of even more than national importance; it became an international
question. The provision of such a route would bring northern Europe
into closer touch with Italy and her ports on the Mediterranean. That
fact was realised, and when the company incorporated to carry out the
work announced that the task was far too risky for private resources,
the governments of the countries most intimately interested in the
fulfilment of the project promised tangible assistance in the form of
substantial subventions.
[Illustration: THE WONDERFUL WASSEN LOOP ON THE ST. GOTTHARD RAILWAY,
SHOWING THREE TIERS OF TRACK]
The path of the tunnel through the heart of the mountain was plotted
by Mr. M. O. Gelpke, C.E., and this in itself was a great achievement.
Fifteen stations were scattered over the mountain slopes for the
manipulation of the survey instruments, and many of these were situated
unavoidably in positions very difficult, and often impossible, of
access. Borings were made to ascertain the rock strata which would have
to be pierced by Professor Fritsch of Frankfort, and from the result of
these essential investigations it was computed that the work, including
the necessary railway line on either side of the great tunnel, could
be completed for a sum of £7,480,000, or $37,400,000. The money was
raised by guarantees of £1,800,000 ($9,000,000) from Italy, £800,000
($4,000,000) from both Germany and Switzerland, and by the issue of
shares and mortgage bonds to the extent of £2,720,000, or $13,600,000.
As a further contribution to the task, the Swiss Government undertook
to supervise actual construction.
The financial arrangements completed, the company had to search for a
man to bore the tunnel. For this purpose tenders were sought for the
whole contract. The terms of the latter were severe, as were also the
technical conditions. The tunnel was to carry a double track, to have a
height of 19.68 feet to the crown of the arch, and a maximum width of
26.24 feet, with a minimum width of 24.93 feet. The tunnel was to be
quite straight, with the exception of a slight curve at the southern
end, where, for a distance of 474 feet from the entrance, a curve of
984 feet radius was to be introduced to gain Airolo station. The rise
from the northern entrance was to be about 1 in 172 to the summit
level 3,781 feet above the sea, followed by a drop of 1 in 1000 to the
southern end. These gradients falling on either side from the centre
were necessary for drainage, and were estimated to be just sufficient
to ensure the water flowing to the portals.
Seven tenders were submitted for the enterprise, the lowest being
that of L. Favre, a well-known engineer of Geneva, who had completed
many notable railway works in Europe. He undertook to complete the
tunnel for £2,000,000 ($10,000,000) within eight years. His nearest
competitor, an Italian company, wanted twenty-five per cent. more, but
would not guarantee completion within less than nine years. Monsieur
Favre was supported by a body of influential capitalists, and the
contract was awarded to him.
Having sanctioned the project, the Government was determined that it
should be completed, and resolved that the engineer should be held to
his self-appointed time limit. The penalty it stipulated was exacting.
For every day over the ninth year Favre was to forfeit £200, or $1000,
for six months, and then double that penalty per day until completion.
A year was thus allowed over and above what he demanded to cope with
any unforeseen contingencies that might arise during the progress of
the task. Similarly, M. Favre was to receive a premium of £200, or
$1000, a day for every day he was in advance of the stipulated period.
His Italian competitor, while agreeable to the forfeit, stipulated that
it should not be enforced until after the eleventh year, which terms
the authorities refused to entertain. To ensure securing the forfeit
money should the engineer be late, Favre was compelled to deposit a sum
of £320,000 ($1,600,000) with the Government before a stone was moved.
No undertaking of such a magnitude as this tunnel, although protected
adequately by severe restrictions, ever has been carried out in the
face of so many vicissitudes; no engineer ever has been so harassed
as was M. Favre. From the moment the tender was signed and sealed
troubles commenced, some incidental to the task, others purposely
thrown in his way by jealous outside interests. In the first place,
the Government undertook, according to the terms of the contract, to
have the approaches to the tunnel completed so that he could commence
operations without delay. This was not done. Further opposition was
then encountered from another and unexpected quarter, which assumed
such proportions as to jeopardise the whole scheme. Italy, having
contributed about a sixth of the cost, and who therefore had an
important voice in the matter, demanded that half the work should be
granted to the Italian engineers who had been engaged upon the Mont
Cenis tunnel. This was a bitter question, and it took M. Favre two
weary months to adjust it.
These hindrances at last settled satisfactorily, work was commenced
on the northern side of the Alps at Göschenen on June 4, 1872, and
at Airolo, the southern portal, on July 2 of the following year. The
preliminary preparations were of a gigantic character. Though M. Favre
had sublet the constructional contract for the tunnel itself, he was
primarily responsible and nursed it as the engineer-in-chief. Huge
plants had to be installed at either end for supplying the various
demands for power for a thousand-and-one purposes. At the northern end
water turbines were laid down, driven from the river Reuss, a head
of water of 279 feet being available. At the Airolo end a similar
installation was established and operated under a water head of 541
feet from the Tremola. Subsequently, it was found that this latter
supply was inadequate. But M. Favre was a man of infinite resource.
He promptly built a viaduct 12,000 feet in length, tapping the Tessin
River, and thus overcame the water power difficulty. Small towns sprang
up at either end around the respective portals to house the machinery,
the workmen, and innumerable other details.
As tunnel-boring operations upon such a scale as this were in their
infancy, this engineer-in-chief perforcedly had to break a great deal
of new ground; to carry out considerable pioneer work. Hitherto, the
usual tools at the service of the excavators were the pick-axe,
shovel, chisel, and sledge-hammer; but such implements as these in a
work of this magnitude were akin to forging a mighty crank shaft with a
blacksmith’s hammer. New forces had to be created. The Mont Cenis had
demonstrated this fact, and in the course of its realisation a new tool
appeared. This was the mechanical percussion rock drill, operated by
compressed air at a pressure of 112 pounds and upwards per square inch.
To furnish the requisite energy to the tools elaborate air-compressing
plants had to be laid down. These were designed by Professor Colladon,
and they were capable of compressing 1,596 cubic yards of air to a
pressure of eight atmospheres every minute, the power being stored in
huge cylindrical reservoirs, not unlike mammoth steam boilers, from
which the conduits extending to the working faces on either side were
charged.
The scene in the tunnel was impressive in the extreme. At the working
face a little gallery was bored, about eight feet wide by the same in
height, at the roof of the tunnel. The drilling machines were mounted
on travelling carriages, with their perforating chisels jutting ugly
and business-like from the front. With the pent-up force of eight
atmospheres behind them, they rapped against the solid rock and slowly
but surely made a perforation. At frequent intervals there was a slight
stop, the chisel point was withdrawn and a jet of water, drawn from
a tender hauled up in the rear, was directed into the hole, when the
chisel instantly resumed its monotonous round. At intervals, a chisel,
with its cutting edge blunted from continual hammering at the iron-like
mass, was taken out, thrown on one side, and another inserted in its
place, to continue the attack on the rock. Progress was laboriously
slow, or comparatively rapid, according to the nature of the material
encountered. When the rock was of a granitic nature, then advance was
only at the rate of an inch or two per hour; on the other hand, when
soft, clayey material was tapped, then the chisels bored their way at
the rate of as many feet in the same time.
[Illustration: THE COMPRESSED AIR LOCOMOTIVE WHICH HAULED WORKMEN AND
ROCK BLASTED FROM THE MOUNTAIN IN THE CUTTING OF THE LOETSCHBERG TUNNEL]
[Illustration: WHAT THE WORKING FACE IN THE HEART OF THE MOUNTAIN IS
LIKE
The gang and drills cutting the path for the line through the
Loetschberg Tunnel recently completed.
BORING A GREAT ALPINE TUNNEL]
[Illustration:
_Photo by E. Goetz, Lucerne_]
THE LOFTY AMSTEG BRIDGE, 184 FEET HIGH, SPANNING THE MADERAN VALLEY ON
THE ST. GOTTHARD RAILWAY]
Three men attended to each machine, and by means of levers and
wheels the height of a drill could be adjusted to a nicety. Movement
was difficult, for the space was cramped. In the murky gloom the
outlines of the men could be faintly discerned. The fitful glimmer
of the oil-lamp which each carried--electric lighting had still to
be invented--fell upon their semi-nude bodies and swarthy faces.
The streaming perspiration mingling with the grime and dust, which
strayed over their skin in fantastic streaks, gave the men a fiendish
appearance. The temperature was that of an oven. As the men drew nearer
and nearer to the heart of old Gotthard, the heat rose until the men
laboured in an atmosphere of 90° or more. The only sounds were those
of the hammering of the drills as they bored into the rock, and the
hissing of the escaping air after it had completed its allotted task in
operating the chisels.
At long intervals there came a heavy silence. The holes had been bored
to the requisite depth. The machine was drawn far back into the boring.
Explosives were slipped into the holes and tamped home. From a safe
distance the charges were fired. A dull, smothered roar, a rending
and crumbling, and another gap was torn in the bowels of this monarch
of the Alps. The excavators hurried forward, cleared away the tumbled
debris, and brought the lumbering drill carriage up to the fresh
working surface.
Day in and day out, week after week, month by month, this round
continued. It was monotonous, and the work was hard. The stifling
atmosphere and the conditions told severely on the physique of the
workmen. Congestion of the brain, irregular action of the heart,
anæmia, or one of numerous other obscure maladies, was the reward for
their labour. Their faces assumed a deathly pallor; working in cramped
positions gave them an unsightly stoop, and deprived their legs of
movement, so they tottered rather than walked as they returned from the
scene of their toil at the end of the shift.
The pay was wretched, ranging from half-a-crown to five shillings
(from 60 to 125 cents) per day of eight hours, out of which they
had to board themselves! Needless to say, but few Englishmen or
western Europeans figured on the pay-roll, for none would accept such
starvation pay for such terrible work. The labourers were Italians for
the most part, and yet nearly one and all, by subsisting on miserable
food, consisting for the most part of a kind of meal porridge, cheap
and yet limited in quantity, saved a part of their earnings and sent
it home to their needy families in sunny Italy. The average number of
men employed was about 4000, half at either end, but at times it ran up
to as high as 7000. The mountain claimed 310 lives, killed by accident
alone, and 877 injured, before it was conquered; but, considering the
conditions, it is remarkable that the casualty roll was not heavier.
In the wake of the small heading gallery came the other gangs. These
rigged up the timber and other supports to the roof and excavated the
small opening to the full dimensions of the tunnel. Last of all came
the masons, setting the masonry lining, from 18 to 30 inches thick,
in position, for the tunnel is lined throughout. In passing through
the granite rock there was but little fear of a collapse of the roof,
but in the treacherous clay advance had to be made warily, and heavy
timbering resorted to, in order to prevent the soft soil caving in and
burying all in its sticky embrace.
The material for the headings and lining, as well as the workmen and
tools, were carried to and fro upon a small railway, the locomotives of
which were driven by compressed air--steam was impracticable, because
it would have fouled the workings; while on the short distance between
the inner end of the railway and the working face haulage was done by
horses. The privations suffered by the navvies was only equalled by
those experienced by the animals, the mortality of which ran up to as
high as twenty-five per cent. of the number employed.
Water was a constant menace, and at times retarded progress seriously.
On the south side it was particularly troublesome. Time after time
the drills or detonating charges would tap one of these subterranean
streams, and the water would pour out in a cascade. These rivulets were
of varying volume, but in one stretch, where the rock was extremely
friable, it was considered too dangerous to use the mechanical drilling
machine, so the men had to cut their way forward by hand. In so doing
they released a vast underground pocket of water, which rushed out
at the rate of over 3000 gallons per minute. At one spot it was only
by superhuman effort that headway was made, for the men were half
submerged in these torrential outbursts, escape from which was only
possible by penetrating farther into the mountain.
In 1876 another terrible calamity overtook Louis Favre. It was
discovered suddenly that the railway, far from costing the estimated
sum, would approximate over £11,500,000, or $57,500,000. Somebody had
blundered, and badly too. A deficit of over £4,000,000, or $20,000,000,
appeared certain. What was to be done? The development of such a
contingency never could have happened at a more inopportune moment.
Times were hard; money was scarce; financial crashes loomed in every
quarter of the Continent; and, to make matters worse, war was raging.
Never in the history of engineering had such an extraordinary and
unaccountable mistake been made in the estimates.
The discovery came as a thunderclap. The stock of the company ran
down like a thermometer plunged into ice. Those who had supported
the enterprise in the face of hostile criticism began to doubt the
wisdom of their optimism. A gloom settled everywhere. It appeared as
if the gigantic achievement would become numbered among the great
unpaid; would be another contribution to those unfinished enterprises
characterised as follies.
But Monsieur Favre kept going. There was the daily penalty staring
him in the face if he did not finish within time. Any prolonged delay
spelled ruin to him and to those who had financed his task. To make
matters worse, the Swiss departments who had the most to gain from the
completion of the railway steadfastly refused to extend the slightest
assistance.
Matters reached a crisis. Either the money must be found, or that
already spent must lie buried in the mountain. An International
Conference was called to consider the situation, where, as prominent
cities and railways who hoped to reap something from the completion
of the tunnel promised support, Germany, Switzerland and Italy agreed
to increase their subventions. Much of the projected work originally
contemplated was postponed indefinitely in order to reduce the first
cost.
This readjustment of the financial situation enabled work to be resumed
energetically. But Favre was harassed sorely still. Payments for work
became irregular, and every possible obstacle that could be placed
in his way was forced to the front by intriguing opponents. Efforts
were made even to create a rupture between him and the International
Society, but Favre’s unflagging perseverance and determination resisted
all such machinations, and he plodded along resolutely.
However, these worries and his feverish anxiety to succeed in his
enterprise told upon his health. He never lived to see his great
achievement completed. On July 19, 1879, while inspecting the progress
of the work at the headings, he was seized with an apoplectic fit, to
which he succumbed in a few hours. Literally in harness, this guiding
spirit and clever engineer passed beyond the veil when the tunnel, the
crowning effort of his life, was rapidly approaching completion.
His mantle fell upon his right-hand assistant, M. Hellwag, an
accomplished German engineer, and he pushed forward the scheme with
an energy characteristic of his late chief. But friction again rose.
Swiss engineers were jealous of this appointment, and at last in sheer
disgust the new engineer-in-chief threw up the work. He was hounded
from his post, despite the fact that on another section of the railway
he had overcome ingeniously the negotiation of sharp ascents within
short distances, which otherwise appeared impossible, by the invention
of a spiral tunnel, wherein the railway burrows into the mountain side,
describes therein a complete circle, and emerges again immediately
above the portal by which it entered.
On Saturday, the 27th of February, 1880, while the workmen on the
Göschenen side were tearing the vitals out of the peak, they were
surprised to find large masses of rock falling about their ears without
any effort on their part. They stopped. The situation seemed uncanny.
They listened intently, and then heard the familiar sound of a muffled
roar, indicating blasting in the heading. The workmen on the Airolo
side were upon them. Terrified lest the next concussion might bury them
beneath a mass of rock, they hurriedly retreated and waited. Presently
one espied the point of a chisel ploughing through the rock towards
him. He grasped its extremity, but as quickly dropped it, for it was
so hot that it burned his hand. Frantically these men rapped upon the
last remaining wall of rock to inform their comrades on the other side
that they were through. With lightning-like rapidity the news flashed
through the Göschenen workings that the men from the Airolo side might
be seen at any minute, and that the task of eight weary years was
consummated practically.
As quickly the news flashed from Göschenen to the Airolo portal to
cease work, since it was decided that the last blast tearing away the
final thickness of rock should be the occasion of great jubilation.
The whole country was excited. Officials hurried to the scene, and
the countryside from far and near flocked to the two mouths of the
tunnel. There was no sleep for any one in the constructional camps
that Saturday night. The men were in a perfect state of frenzy. In
the darkness the preparations for the culminating move were hurried
forward. It was arranged that as the men on the Airolo heading had
first pierced the last partition of rock, they should have the honour
of blowing the gap which would afford access from one side of the
mountain chain to the other through its base.
At seven o’clock on the Sunday morning a train started from each end
laden with invited guests to witness the final operation. Amid many
huzzas they disappeared into the dark, yawning mouths of the great
bore. When each party reached the heading the machines were already
at work. Only a foot of rock stood between those who had journeyed
up from Airolo and the others who had travelled from Göschenen. The
distinction of making the breach a thousand feet under the village of
Andermatt nestling in the sunshine on the mountain slopes, and with
the little lake of Sella 3000 feet above one’s head, was given to two
Piedmontese workmen, Neccaraviglia and Chisso, who had toiled in the
Cenis, and afterwards in the Gotthard, since its very commencement.
The last charges were rammed home, and at 11.45 on the Sunday morning
eight rumbling detonations heralded the piercing of St. Gotthard. Ere
the smoke had cleared away the men sprang forward. There was the final
breach, about three feet in diameter. Engineer Bossi sprang through the
gap, and emotionally embraced his confrere on the other side, followed
by his workmen, who shook hands with their comrades. It was a strange
scene in the depths of the Alps, and the wild vivas of those assembled,
to the memory of Louis Favre, reverberated weirdly down the shaft on
either side.
The excavations of the works to the full dimensions and the lining up
of the last section proceeded with great rapidity, and on May 22, 1882,
amid great festivity, the tunnel was declared open. It had taken ten
years to complete, but had Favre been left to his own devices, and had
he not been exposed to financial harassing and intrigue, and had not
his successor Hellwag been driven from his post, it would have been
finished in the time the engineer contemplated. At that time Favre’s
skill, pluck and unflagging devotion to his task were not appreciated,
but recognition of his genius was afterwards extended by the erection
of a monument to his memory at the Airolo entrance to the tunnel. It is
safe to assert that it was due to his enterprise and grim determination
in the face of adversity that the St. Gotthard tunnel became an
accomplished fact, and resulted in the reduction of the journey between
Northern Europe and Italy by thirty-six hours.
In addition to the tunnel, 172 miles of line had to be built to connect
the Swiss with the Italian railway systems. From the body of this
frowning clump 31,800,000 cubic feet of rock were torn by means of
2,200,000 pounds of dynamite.
The remaining sections of the railway named after the tunnel abound
in interesting features from the technical point of view, the most
notable, possibly, being the remarkable spiral tunnels to which
reference has been made, and the successful application of which in
this instance has been reproduced upon other railways where similar
conditions prevail. The best examples, possibly, are those by which
the Biaschina gorge is negotiated, since here there are two of these
tunnels side by side, the railway almost describing a figure 8 in
corkscrewing from one level to the other. Exclusive of the Gotthard,
there are no less than 76 tunnels and galleries, aggregating 29 miles,
as well as 1,384 other structures, 324 being bridges and viaducts
over 39 feet in length. In one stretch of 7 miles, in skirting the
south-eastern arm of the Lake of Lucerne, the railway passes through
9 tunnels, ranging from a mere 85-feet burrow to others 6,512 feet in
length. Among the Gotthard fastnesses the railway work becomes bolder,
the bridges are lofty, while the line zigzags in a remarkable manner.
It is a case of tunnel, cut and bridge all the way. Up to 1880, when
the railway was finished practically, constructional work provided
regular employment for 10,757 men.
So rapidly did the volume of traffic upon the railway swell, however,
that it became extremely difficult to handle it, as there was only
a single line, except in the tunnel and at one or two other points.
The provision of another track became imperative, and in 1886 it was
commenced. This was not a simple matter, as the new work had to be
carried out without interrupting traffic in any way--that is, so far
as the main through service was concerned. With the exception of the
Gotthard and four smaller tunnels, all the other structures had to be
excavated out to carry the second pair of metals, while, similarly,
all bridges had to be increased in width. In order to finish the work
as rapidly as possible, the task was divided up into a number of
small, separate contracts, each covering a few miles. Vehicles for the
conveyance of constructional material were provided and supplies were
hauled free of charge by the railway, while explosives for blasting
were sold at cost price.
The most difficult works were carried out by the company itself by
its own engineers and labour. In this comprehensive widening system
over 100,000 cubic yards of rock which had been excavated from the St.
Gotthard and dumped in the vicinity of Airolo were reclaimed, to be
used in the building of embankments, revetments and retaining walls.
The tunnel widening was carried out almost exclusively at night and on
Sundays, since the smoke from passing trains would have impeded such
work during the day. The quickest methods of widening were adopted,
and in the approach to the Bristen tunnel an excellent expression of
this is afforded. Instead of trimming back the mountain-side to provide
space for the second pair of rails, a gallery was built projecting
from the mountain and supported on heavy masonry pillars, giving the
appearance of a colonnade.
In the handling of unavoidable night trains an elaborate protection
system was adopted in connection with the tunnels, to prevent disaster
to the trains themselves or to the working gangs. No trains were
permitted to enter a tunnel until assurance had been made doubly sure
that there was no constructional train standing on the only line to
court collision, and that the workmen were safe. Each working squad
was covered amply by electric and other signalling devices. Similarly,
all metallic structures that required moving were handled on Sundays,
when traffic was at its lowest ebb, between the scheduled movements
of passing trains, so that the latter might not be delayed. It was
estimated that this work would occupy nine years, but in reality it was
accomplished in five and a half years, and the total cost of widening
the whole mileage to a double line was only £500,000, or $2,500,000.
CHAPTER IV
THE RAILWAY INVASION OF CANADA
The news of the victory of Stephenson’s “Rocket” in the historic
railway locomotive contest at Rainhill on the Liverpool & Manchester
railway in 1829 scarcely had filtered round the world, when the idea
of transporting passengers and merchandise by steam power along two
parallel rails occupied the earnest attention of enterprising spirits
in Canada. They realised that the new method of locomotion was certain
to play an important part in the opening up of British North America.
As a result of deliberations, a small body of prominent business men in
Montreal applied for a charter to construct a railway from La Prairie
to St. John’s in the province of Quebec, which was granted in 1832
under the seal of William IV.
It was an unpretentious enterprise, for the projected line was only
some fourteen miles in length. It was named the Champlain & St.
Lawrence railway, the idea being to link Lake Champlain, whence New
York could be reached by water, with the St. Lawrence. The first
section of the line was opened in 1836, though it was not operated by
steam. The rails were of wood, and the vehicles were hauled by horses.
This system obtained for only one year, however. The first winter
sufficed to demonstrate to those concerned with the enterprise that
such primitive methods were far from satisfactory. Consequently the
“wooden flanges,” as the rails constituting the track were called, were
torn up to make way for iron rails, and the steamengine took the place
of the animal motor.
A year or two later the objective of the promoters was attained. Lake
Champlain was brought into communication with the St. Lawrence at
Montreal by a railway some fifty miles in length, the inland sheet
of water being tapped at Rouses’s Point at the head of the lake in
United States territory. It is stated that Jay Gould, who afterwards
became one of the greatest railway-builders and magnates in the United
States, gained his first insight of the construction of railways upon
this line, by being associated with the location survey. From this
humble beginning was woven the huge railway network of Canada, which
now gridirons the country in all directions, and aggregates some 25,000
miles.
Other projects were formulated in rapid succession for a comprehensive
invasion of the eastern corner of the country. Foremost among these was
the Grand Trunk Railway Company, conceived in 1852, to build a trunk
road between the Atlantic seaboard and the Great Lakes, which at that
time was practically the western commercial limit of the Dominion. It
was an English enterprise, and, moreover, was strongly imperial from
the sentimental point of view, for it was planned to thread Canadian
territory entirely.
The famous firm of railway constructional engineers, Messrs. Peto,
Betts & Brassey, fresh from their triumphs on the Continent, were
willing to carry out the work. They had an extensive accumulation of
plant lying idle, and at the time were seeking for fresh worlds to
conquer. Canada presented just the opportunity they desired, and they
were ready to provide all the railways that Canada would require for
some years to come. The faith in this firm of constructional engineers
was so great that British financiers were open to provide any amount of
money that might be required.
The negotiations were prolonged, as rival interests opposed the scheme
vehemently. The preliminaries passed through many vicissitudes, but the
compact between the English financiers and the Canadian authorities
was ratified and sealed, at last, for the construction of a main line
between Montreal and Hamilton, a distance of about 373 miles, which the
Provincial Government undertook to finance to the extent of £3,000, or
$15,000, per mile. Hamilton was selected as the western terminal point
because therefrom another line extended to the Lakes, while a railway
was creeping up from Portland on the Atlantic coast to Montreal. By the
construction of this central section, 964 miles of through continuous
railway would be provided for the benefit of the population.
But the undertaking proved to be one of the most difficult that
the engineers, despite their wide and varied experience, had been
called upon to fulfil up to this time. The country traversed was very
sparsely populated, the forests were dense, and in winter, under the
combined adversities of snow, ice, and intense cold, the situation
was terrible. Labour was scarce, wages were high, and material was
found to be expensive. In the end it was found that the average cost
per mile approximated £8,000, or $40,000, so that to link Montreal
with Toronto entailed an expenditure of £2,664,000, or $13,320,000.
Moreover, it was one of the largest contracts that the engineers ever
had carried out, while the physical conditions harassed them to such
an extent that when they balanced up their books they found they had
incurred a loss of about £1,000,000, or $5,000,000. The wide gauge of
five feet six inches was adopted, and this factor developed into as
keen a bone of dissension in Canada as it did in Great Britain, and as
in the latter country it was finally abolished, so in Canada it was
abandoned in favour of the standard gauge of four feet eight and a half
inches, though the conversion cost the Grand Trunk railway a matter of
£1,000,000 ($5,000,000).
[Illustration: NO. 2, “THE TORONTO,” THE FIRST RAILWAY ENGINE BUILT IN
CANADA BY JAMES GOOD IN 1853]
[Illustration:
_Photo by courtesy of Pennsylvania Steel Co._]
THE NIAGARA CANTILEVER RAILWAY BRIDGE UNDER CONSTRUCTION
It was built round the suspension highway bridge so as not to interrupt
communication between the two banks.]
Yet in building this line the contractors set up an engineering
monument which for years ranked as the “eighth wonder of the world.”
Montreal was on the north bank of the St. Lawrence, while the link
connecting the metropolis with the Atlantic seaboard followed the
southern bank of the river. The two sections of line were interrupted
by the rolling waterway, which at this point is nearly two miles wide.
The spanning of this gap, so as to bring Montreal into direct railway
touch with the coast, had been one of the great obstacles to the
incorporation of the railway in the first instance, but Messrs. Peto,
Betts & Brassey undertook to forge this link. At that time it was so
formidable an undertaking as to be thought absolutely incapable of
realisation. Indeed, when a suggestion for bridging the St. Lawrence at
this point was advanced for the first time, it was laughed to scorn.
[Illustration: “THE EIGHTH WONDER OF THE WORLD”
The wonderful tubular bridge, 6,592 feet long, built by Ross and
Stephenson across the St. Lawrence River to carry the Grand Trunk
Railway into Montreal.]
[Illustration: THE BRIDGE AS RECONSTRUCTED
The continuous tube carrying a single track was converted into an open
truss girder bridge to take two sets of metals, tramway line, road and
pavement.]
However, its construction constituted a vital part of the contract.
Accordingly, the contractors lost no time in attacking the undertaking
when they secured a foothold in the Dominion. The river was surveyed
minutely up and down for a considerable distance, while detailed
soundings were made to discover the extent and nature of the
foundations requisite for the piers. After infinite labour a suitable
site was discovered, and a great measure of credit for the location
is due to Alexander M. Ross, who was one of the engineers to the
undertaking, George Stephenson acting as consulting engineer. Ross
carried carefully prepared and detailed plans of the structure he had
formulated to his coadjutator in England, and Stephenson admitted, when
first submitted to his notice, that “the idea was certainly startling.”
However, he complimented Ross upon his daring, and as the latter
engineer had won his spurs in England before he departed to Canada on
behalf of the group of capitalists financing the Grand Trunk railway,
his work received greater consideration from the eminent engineer than
might have been the case otherwise. The result was that when Stephenson
went to Canada to consider the subject on the spot he concurred with
Ross in the general scheme, and the design was elaborated conjointly.
When the location was settled definitely, the project was assailed
vigorously by bridge designers in America, but this animosity was
inflamed from the fact that they had prepared alternative proposals
for bridging the waterway at a different spot. The rival engineers
emphasised the danger from ice, and commented strongly upon the risk,
in fact serious danger, arising from this cause, to the full brunt of
which Stephenson’s bridge would be submitted. Some critics even went
so far as to state that the structure never would be completed, or if
so, would come down under the first packing of the ice. Stephenson,
however, treated his American detractors with contempt, and, to the
mind of the latter worthies, appeared to fly deliberately in the face
of Fate by concurring with Ross’s recommendations. That was nearly
sixty years ago, but the piers have given no sign of collapsing yet.
The resident engineer and superintendent of the constructional
work, Mr. James Hodges, realising the monumental character of the
undertaking--for it was a larger bridge-building scheme than ever had
been attempted up to this time--spent many hours together wrestling
with difficulties as they developed, for the unexpected confronted them
at every turn. The ice was one of their greatest perplexities, because
during the winter the river is frozen so solidly that it will support
the weight of a train, and, indeed, a track has been laid across the
waterway in winter to maintain communication between the two banks.
When the ice broke up, the floes became jammed and piled against the
temporary works around the piers in an inextricable mass to such an
extent that it demanded unremitting vigilance to guard against a
collapse of the dams under the enormous pressure exerted upon them.
The depth of the river and the current were two other factors which
had to be taken into serious consideration, for some of the piers are
sunk in twenty-two feet of water, while the velocity of the current is
about seven miles an hour. The working season was very short, averaging
about twenty-six weeks during the year, and during this period every
available man had to be crowded on to the work. When construction was
in full swing, between 2000 and 3000 men found employment.
[Illustration:
_Photo by permission of the Pennsylvania Steel Co._]
THE MAGNIFICENT SINGLE SPAN BRIDGE ACROSS THE NIAGARA RIVER BELOW THE
FALLS
Length of span, 550 feet; height above 226 feet.]
The bridge consisted of a huge rectangular tube, similar to that
spanning the Menai Straits, carrying a single track. From end to end
it measured 6,592 feet by 16 feet wide, 18 feet in height, and weighed
9,044 tons. It was divided into 25 spans, 24 of which were of 242
feet each, while one was of 330 feet. The piers were built massively
in masonry, the stone being obtained from quarries in convenient
proximity. The ironwork was prepared in England, each piece being
marked carefully for its position in the structure. The bridge had
a gradual slope upwards from either bank to the centre, where the
height from the bed of the river to the top of the tube was 108 feet.
For its erection 2,250,000 feet of timber were required in connection
with the temporary work, the piers and abutments demanded the use of
some 3,000,000 feet of masonry, and 2,500,000 rivets were used to
secure the component parts of the ironwork together. In addition to
the bridge proper, some 2,500 feet of approaches on either side had
to be fashioned, so that the total length of the work was 9,144 feet.
The contracted price for the structure was £1,400,000, or $7,000,000,
but it was completed for £100,000 ($500,000) less. Of this total the
masonry and temporary work absorbed,£800,000, or $4,000,000, and the
ironwork £400,000 ($2,000,000).
[Illustration: A VIEW OF THE IRON TUBE, 2,290 FEET IN LENGTH AND 23
FEET IN DIAMETER]
[Illustration: THE 2000 H.P. ELECTRIC LOCOMOTIVES HAULING THE
“INTERNATIONAL LIMITED” THROUGH THE TUBE
The “link that binds Two Great Nations,” the St. Clair Tunnel, under
the St. Clair River.]
While the work was in progress the railway company found increasing
traffic, as the sections of completed line were opened, so emphasised
the urgency of securing through communication across the river that
the contractors were approached, and a bonus of £60,000 ($300,000) was
offered to them if they would complete the work a year earlier than was
stipulated in the contract. The engineers redoubled their efforts, and
on December 17, 1859, the great bridge was opened, though the official
ceremony took place five months later, when King Edward VII, then
Prince of Wales, opened the Victoria Bridge, as it was christened, in
the name of Queen Victoria, during his visit to the Dominion.
Stephenson died before his great work was completed. For a quarter of a
century or more it constituted one of the sights of the North American
continent. As the country became more settled and the volume of traffic
flowing to and fro across the river increased, the railway experienced
a very great difficulty in handling it over a single line. At last the
inadequacy reached such a point that some improvement was imperative.
A second bridge would have been too costly, and after considerable
reflection it was decided to replace the tubular bridge by one of
larger dimensions.
A minute examination of the existing structure was made, and it
speaks volumes for the work of Stephenson and Ross, as well as of the
contractors, that the bridge appeared as sound and as fit for another
century or more as it did on the day it was first opened. The piers had
been built so solidly that they did not show the slightest trace of the
terrible buffetings and pressure to which they had been subjected by
the ice during some fifty winters.
Consequently it was decided to remove the tubular structure and to
erect in its place an open truss bridge, 66 feet 8 inches wide,
carrying a double track, a roadway for an electric tram-line, space
for vehicular traffic, and a pavement for pedestrians. The engineers
designing the new structure came to the conclusion that the striking
stability and condition of the masonry piers would carry the new bridge
with but slight alteration. As a result of this conclusion it was
decided to erect the new structure around the old bridge, cutting away
the latter span by span, so that there was no interruption to the train
service.
This appeared to be a simple expedient, but when the engineers
commenced operations on Stephenson’s handiwork they found that it
was built of far tougher material than they had expected. The rivets
defied withdrawal, so excellently had they been driven home, and one
of the engineers showed me one of these securing pieces, which he had
preserved as a memento of British handiwork of some seventy years ago.
As a matter of fact, as he related, it was far easier to build the
new structure than it was to destroy the old, and the cutting away of
the old tubular bridge span by span was found to be an exceedingly
laborious task.
However, it was achieved, and there was not the slightest interruption
in the traffic, which testifies to the skill and care with which
the engineers laid their plans. Nor was it attended by any untoward
incident, though what might have proved a terrible accident was averted
very narrowly during reconstruction, as was related to me by one of
the engineers. It was Sunday morning, and they were rebuilding the
central part of the bridge. Special men had been stationed at each
approach to the bridge, and elaborate instructions had been drawn up
for controlling the passage of trains by flag-signalling. Sunday was
selected for the most difficult portions of the work, as on that day
the trains were few and far between.
On this Sunday morning the work had advanced so satisfactorily that
the old tubular span had been removed, and there was a wide gap in
the continuity of the ironwork carrying the metals, showing the murky
river swinging along at a merry pace below. Everything was ready for
completing the new span, when one of the engineers, happening to glance
shorewards, observed a train entering the bridge and coming along at a
brisk speed. Something had gone wrong; the flagman had misunderstood
instructions or had given a wrong signal. The train was speeding to
its doom, for there was the yawning gulf. But the engineer never lost
his presence of mind. Realising the situation, he threw down his
instruments, and ran along the track towards the advancing train waving
his arms frantically and yelling like one bereft. The engine-driver,
unlike the majority of his ilk on an American railway, concluded that
something must be amiss, and applied his brakes sharply, pulling up a
short distance from the brink of the abyss. It was a narrow escape; had
the engineer hesitated a minute, disaster swift and sudden would have
overwhelmed that train.
When the new bridge, with its 22,000 tons of steel, was completed for
traffic it was renamed, but as the reconstruction coincided with the
Jubilee of Queen Victoria’s reign, the revision comprised merely the
perpetuation of that auspicious event, and to-day the structure is
known as the Victoria Jubilee Bridge. From first to last the structure
has cost £1,800,000 ($9,000,000), of which reconstruction absorbed
about £400,000 ($2,000,000).
As the Grand Trunk increased in importance, subsidiary and tributary
railways were absorbed. Nor was the original idea of a trunk line
overlooked. This end was achieved by pushing towards Chicago, the
busy centre of the Middle States. Continuity of rail in this case,
however, was interrupted by the St. Clair River, the narrow strait
which connects Lakes Huron and Ontario. In the early days communication
was maintained by means of ferry-boats, which handled complete trains,
but as the river is extremely erratic, with strong currents varying
in velocity according to the direction of the wind, and is congested
with shipping, the ferry service possessed many shortcomings. When the
strait was obstructed with floating ice, the situation became far more
serious.
Accordingly, in order to remove these disabilities, a bold solution
was elaborated in the form of a tunnel beneath the waterway connecting
Sarnia on the Canadian with Port Huron on the United States side of the
St. Clair River. It certainly was an audacious remedy for a perplexing
problem. The river is 46 feet deep and is nearly half-a-mile wide,
so that the tunnel had to be planned at a great depth. However, no
better alternative could be offered, for a bridge was quite out of
the question, so in 1886 the St. Clair Tunnel Company was formed as a
subsidiary undertaking of the railway, to complete a subaqueous link of
communication, with Mr. Joseph Hobson as chief engineer.
As the topography of the land on either side is tolerably flat, the
question of the approaches had to be settled, and a heavy grade
at either end could not be avoided. Technical difficulties were
encountered at the very start. A trial shaft was sunk on the Canadian
side to a depth of 98 feet, while another shaft on the American side
was carried down to 92 feet. The preliminary shafts were elliptical in
shape, measuring 4 feet by 8 feet in diameters. When the requisite
depths were obtained, galleries were driven at right angles beneath the
river. These efforts proving satisfactory, it was decided to build the
complete tunnel from either bank from shafts, as in the case of the
Blackwall tunnel. The shafts were each 23 feet in diameter, and they
were so built that there was a circular ring, the lower face of which
carried a knife-edge digging into the ground. The soil was excavated
from beneath this knife-edge, and as the brick-wall lining of the shaft
was built upon the upper surface of the knife-ring, it was considered
that the superimposed weight would drive the knife downwards as the
earth beneath was removed.
But these carefully-laid schemes and anticipations went astray.
Exasperating failures and mishaps occurred, and at last the engineer
changed his plans; the shaft method was abandoned. Instead, he decided
to drive the tunnel from either end through the approaches. For this
purpose the plant and machinery were removed inland from the shafts
for a distance of 1,900 feet on the Canadian, and 1,800 feet on the
American bank respectively. Two huge cuttings were driven downhill
until the tunnel level was gained, when the burrow beneath the river
was commenced. The tunnel itself consists of a circular iron tube or
pipe of sufficient diameter to carry a single track. It is 19 feet 10
inches in diameter, is built up of cast-iron rings, and weighs complete
56,000,000 pounds, or about 25,450 tons. Boring was effected from
either end by means of the hydraulic shield, and in less than three
years the task was finished.
The length of tunnel beneath the water is 2,290 feet, while that under
dry land represents another 3,748 feet, making a total length of 6,932
feet. To this must be added 5,580 feet of approaches, which brings
the total extent of the work to nearly 12,000 feet, or 2¼ miles. It
cost £540,000, or $2,700,000, and has always ranked as a noteworthy
achievement in this particular branch of engineering.
Owing to the steepness of the approaches on either side special
locomotives had to be built to handle the traffic through this artery.
They were powerful creations of the railway engine designer, and when
they appeared were the largest steam locomotives in the world. They
could haul a train weighing 760 tons, though at times the pace was slow.
But traffic between the United States and Canada increased by leaps and
bounds, owing to the provision of this tunnel, with the result that in
a very few years the railway authorities found that the tube was quite
overtaxed. A solemn conclave was held as to the best ways and means
of meeting this development. The track could not be doubled; so the
question was how to increase the existing hauling capacity of a single
engine. Steam could not meet the question, so was ruled out of court.
Then an engineer suggested electrification, and advanced a report to
show how the weight of each train might be increased by nearly 25 per
cent. with quicker working, and consequently would facilitate the
passage of a greater number of trains in a given time.
This engineer, Mr. Bion Arnold, was authorised to proceed with his
scheme and to complete his plans for the electrification of the tunnel.
He did so, and as a result a specification was drawn up requiring the
haulage of a train weighing 1000 tons over the 2¼ miles in 15 minutes,
with a maximum speed of 25 miles and a minimum speed of 10 miles per
hour respectively. When the plans were made known it was realised
that the project comprised the most ambitious electrical undertaking
that ever had been attempted up to that time in railway operations,
especially as it was insisted that the electrical system should be of
a type which constituted its first application to heavy steam railway
working. This is what is known as the single-phase alternating current
system with overhead conductor.
The invitation for tenders was awaited with keen anticipation
throughout the world, as it was conceded to offer a unique opportunity
to the electrical engineer. Consequently keen competition was evinced
to secure the honour of carrying out such a remarkable undertaking.
The contract was secured by the Westinghouse Electric & Manufacturing
Company, and was carried to a successful conclusion at a cost of
£100,000 ($500,000). The locomotives now used on this service are
among the most powerful in the world. They weigh 135 tons, and develop
about 2000 horse-power, which enables them to haul a 1000-ton train
up the heavy approach grades at a minimum speed of 10 miles per hour.
Moreover, since electricity was adopted, the tunnel has been kept free
from the dense clouds of smoke and steam which originally converted the
tube into a veritable inferno, and, what is far more important from the
railway company’s point of view, the electrical system is able to meet
three times the volume of traffic that exists to-day, so that there is
ample provision for the future. As it is, the 2¼ miles of line beneath
the teeming St. Clair River is the heaviest electrically worked section
of railway in the world.
Another link with the United States, however, was incumbent to bring
the manufacturing centres around Buffalo into closer communication
with the Dominion. Yet there was only one point where this link could
be provided--across the gorge through which the Niagara River, after
tumbling over the lofty cliff, seethes and boils on its way to Lake
Ontario. A suspension bridge met the exigencies of highway traffic for
some years, but here again improvement was demanded. Accordingly, a
new bridge was planned, and this constitutes one of the most graceful
structures spanning that fearful rift.
The old bridge fulfilled its services faithfully for forty years, and
when demolished was found to be possessed of several years of life. The
new bridge is a splendid work, and its close proximity to the Falls
offers a striking comparison between the handiwork of Nature and that
of the engineer. The bridge leaps across the gorge in a single span,
and when one is speeding over the structure in the train, one is at an
elevation of 226 feet above the raging waters below. The span is of no
less than 550 feet, and the ends are secured to massive anchorages sunk
into the face of the cliffs. It is wrought throughout of steel, and
is approached from either side over a single truss span 115 feet long,
giving a total length of 780 feet.
But the bridge serves a dual purpose. The upper level or deck, 30
feet in width, carries two tracks for the railway’s need, but below
this is another deck, 57 feet wide, which has a central carriage-way
flanked on either hand by a broad pavement, so that the bridge provides
vehicular and pedestrian accommodation between the opposite banks. In
order to provide this improved connection between the two nations,
a sum of about £100,000 ($500,000) had to be expended. The improved
facilities it offered so appealed to the public on both shores that
they celebrated its opening in 1897 by a three days’ carnival.
As time sped by, the Grand Trunk railway gradually but surely swallowed
its competitors, until at last it was left in undisputed possession
of the Province of Ontario, from the railway point of view. To-day it
has over 8000 miles of intricate steel ribbon stretched between the
Great Lakes and the Atlantic coast, while between Montreal and Chicago
the fastest trains in the Dominion hurtle to and fro over a double
track 840½ miles in length, which is the longest continuous stretch of
double track under one management in the world, and upon which some
exhilarating speeds are attained.
When the British capitalists committed themselves to an expenditure
of over £9,000,000, or $45,000,000, for the construction of less than
500 miles of line through virgin territory, it is doubtful whether in
their rosiest dreams they ever anticipated that it would grow into a
huge organisation aggregating a third of the railway mileage of British
North America within sixty years.
Development is still being maintained; new territories are being
conquered. A new long and sinuous arm, 3,556 miles from end to end, is
being stretched out from the Atlantic to the Pacific Ocean, to bring
the eastern into direct touch with the western seaboard. The whole has
grown from the insignificant little wooden road that was laid between
La Prairie and St. John’s in the Province of Quebec eighty years ago.
CHAPTER V
THE FIRST TRANS-CONTINENTAL ACROSS THE UNITED STATES
“There were difficulties from end to end: from high and steep
mountains; from snows; from deserts where there was a scarcity
of water, and from gorges and flats where there was an excess;
difficulties from cold and heat; from a scarcity of timber and from
obstructions of rock; difficulties in keeping a large force on a long
line; from Indians; and from want of labour.”
This was the terse story related to the United States Congress by
Collis P. Huntington, one of the moving spirits of what, at that time,
was a tremendous undertaking--the construction of the first railway
across North America whereby the Atlantic was linked with the Pacific
by a bond of steel. But that concise statement concealed one of the
most romantic stories in the history of railway engineering: of grim
battles every hour either against the hostile forces of nature or of
mankind.
It was in 1863 that the first sod was turned in the construction of
the first line which was destined to bring San Francisco within 120
hours’ journey of New York, and which changed completely the whole
stream of traffic flowing round one-half of the northern hemisphere.
But for some years before the spade was driven into the earth to signal
the commencement of this enterprise, the idea had been contemplated
and discussed in a more or less academic manner. It was such a vast
scheme, the commercial possibilities of success appeared so slender
that the most daring financiers of that day shrank from fathering it.
Capitalists concluded that they might just as well pour their money
down a well as to sink it in such a project as this.
The public, however, regarded the idea from a totally different
standpoint. East wanted to shake hands with the west over the mighty
mountains and vast plains. To pass from New York to San Francisco, or
in the reverse direction, in those days was a perilous journey. One
either had to make a protracted and dangerous voyage down one side
of the American continent, round Cape Horn, and pass up the opposite
coast-line for some 10,000 miles; to brave the peril of traversing the
fever-ridden Central American Isthmus; or to embark upon an overland
journey of some 3,000 miles through country where long stretches of
parched, waterless desert gave way to lofty, snow-capped mountains,
with the Indians in open warfare.
When California seethed in the famous Gold Rush, and adventurers
flocked to this magnetic hub from all parts of the world, the
absence of a connecting link was experienced to an acute degree. The
gold-fever-stricken pioneers had to gain their objective as best they
could, and with the best means of locomotion they could afford. In a
single year 100,000 gold-seekers trailed across the continent.
The traffic produced by the discovery of gold set Collis P. Huntington
thinking. Here was a heavy volume of traffic slipping through the
fingers. Why should it not be handled by a railway? This was his
argument, and as he was a dreamer of commercial conquest, though not in
an idle manner, he decided to remedy the deficiency. Looking into the
future, he saw that a line not only would meet the immediate demands
born of the gold rush, but that it would develop into a great highway
between Europe and the East, as well as the Antipodes. He discussed
the idea with kindred spirits, Leland Stanford and Thomas C. Durant,
and they became enthused with the project. But the question was how to
obtain the money requisite for construction? To appeal to the public
was useless, and no assistance could be anticipated from the financial
world. So they approached the Government, and their endeavours proved
so successful that the country decided to subsidise the undertaking.
When the Government’s sympathy had been secured in a practical manner,
the next step was to discover an engineer who could superintend the
survey and conduct constructional operations. The country did not
possess many Stephensons, and the work in contemplation was of such
an unprecedented character that no ordinary engineer would prove
equal to the task. Happily, however, there was in San Francisco
a railway engineering genius whose ability was being wasted for
lack of opportunity. This man was Theodore D. Judah. He was a born
engineer, and his skill in railway engineering had achieved a peculiar
distinction up and down the Pacific coast. This work was his sole
hobby, and the greater the difficulties to be overcome, the more
enthusiastically and determinedly he threw himself into the task.
His efforts in this direction were so strenuous that he was regarded
generally as a crank, and his great dreams of railway conquest provided
a continual source of amusement. He was always diving into the
mountains, reconnoitring the passes with a view to their suitability
for carrying the steel highway, and openly admitting that his greatest
ambition in life was to be given the chance to lift the metals over the
gaunt Sierras frowning upon the Pacific coast, and to drop them on to
the plains rolling eastwards from the opposite slopes.
On one occasion he resigned his position upon a new railway line that
was being built around San Francisco, and, unaccompanied, forced
his way through the rocky barrier, making a mental note of the
configuration of the country as he proceeded in case of something
turning up, laboured across Nevada’s dreary wastes of alkali, skirted
Salt Lake, and at last gained the Missouri. As a result of his frequent
peregrinations among the mountains, his eye became trained expertly in
spying out the suitability of the country for the iron road, and he
became known under the sobriquet of “The Railway Pathfinder.” It was a
picturesque nickname, but it was one which described his personality to
the full. That his wanderings were not in vain is proved by the fact
that nearly every pass through the mountains which he stated to be
adapted to carry a railway has been pressed into this service since, in
order to gain the Pacific coast.
Indeed the pioneer trans-continental railway owes its birth to
Judah. For years he had advocated the project, and emphasised its
practicability. When Huntington and his colleagues were ready to
commence operations they sent for Judah, convinced that he was the very
man for whom they were searching, to plot the path for the line and
to take command of the forces in the field. The Railway Pathfinder,
realising that the ambition of his life was within reach at last,
hurried eastwards. There was a short consultation which sufficed to
prove to the promoters that Judah was the man to carry the enterprise
to success, and there and then he was placed in supreme control of
the construction. The difficulties among the mountains were what the
promoters feared the most, but the pathfinder regarded them so lightly
that their apprehensions vanished. He had spent so many months among
their silent fastnesses that he knew the range through and through. His
plans were daring and feasible, his reasoning lucid, and his enthusiasm
infectious. In order that the directing hand in the field might not be
trammelled or harassed by business or administration details, a special
emissary was deputed to attend to these secondary but vital essentials,
so that Judah might be able to concentrate his energies and ability
entirely to plotting and pushing the line forwards.
[Illustration: THE MASSIVE BRIDGE OF THE UNION PACIFIC RAILWAY OVER THE
MISSOURI RIVER AT COUNCIL BLUFFS, FROM WHICH POINT THE FIRST RAILWAY
ACROSS THE UNITED STATES WAS COMMENCED]
According to the arrangement with the Government, the railway was to
commence from the eastern bank of the Missouri River at Council Bluffs.
The selection of the eastern bank as the starting-point involved the
erection of a huge bridge as the first step in the undertaking. Such
an idea appears somewhat curious at first sight, as one would have
thought, naturally, that the western bank would have been selected as
the obvious eastern terminal. But the Government recognised one point.
The railways were spreading their tentacles slowly but surely from the
Atlantic coast towards the Missouri River. When they gained its
banks a break in the through rail communication would develop, as the
eastern railways were in their infancy, and far too poor to undertake
the construction of an expensive bridge across this wide waterway to
link up with the line stretching to San Francisco.
[Illustration: THE TIMBER TRESTLE ACROSS SALT LAKE, BY MEANS OF WHICH
THE UNION PACIFIC SAVES 57 MILES
There are 12 miles of woodwork, for which 2,824,700 lineal feet of
timber was required. The track is 19 feet above the water.]
Construction was commenced from both ends of the line. San Francisco
was the Pacific terminal, but as the Golden Gate was connected already
with Sacramento, the capital some miles inland, the latter place was
the point to which the constructional forces were dispatched. The
arm driven eastwards from the Pacific was known as the Union Pacific
railway, while that forced westwards from Council Bluffs was designated
as the Central Pacific. The two arms were to meet about half-way across
the continent.
Judah hurried to California and was soon in the turmoil of his task.
The great difficulty on this section was in regard to the supply of the
constructional material. Everything had to be sent round by water via
the most southerly point of the continent, and as this was a voyage
occupying several weeks, extreme care had to be observed to send
forward supplies in a steady, constant stream, so that no delays might
arise from lack of material. But storms raged, while the negotiation
of Cape Horn is a difficult feat at the best of times. The boats were
caught in the terrible embrace of wind and wave, and, upon emerging
from the conflict, struggled, battered and torn, into the nearest port
for repairs. Despite these heavy drawbacks, which no human foresight
could determine or avoid, practically no dearth of supplies ever
was experienced at the railhead among the mountains. In fact, Judah
prosecuted his task so vigorously that before many months had passed
the first railway conquest of the Sierras, considered invulnerable for
so long, was announced far and wide.
How was it accomplished? The pathfinder followed the easiest path open
to him. Distances between points might have been shortened, but time
was money. The builders had urged this emphatically upon Judah, so that
opportunity to indulge in stupendous engineering feats was denied
him. Yet the very conditions which were imposed enabled the pathfinder
to display some master-strokes of genius unconsciously. So long as
a natural path for the metals was available, he followed it. If his
advance were disputed by an obstacle he either removed or ran round it.
The hump was levelled and the depression was filled. The rivers were
followed so far as practicable along their puzzling meanderings. He
lifted the track several thousand feet towards the clouds to gain the
railway summit of the range, and then dropped over the other side. In
one place among the snow-clad peaks he had to hew a narrow shelf out of
the solid rocky mass to wind round the huge shoulder of a mountain. The
wall of rock sheered up on one side to a dizzy height; on the other way
it dropped for over a thousand feet into the river surging below.
The San Francisco division teemed with complex and highly troublesome
perplexities, but one and all arose from the resistance of Nature.
Yet they were slight in comparison with those which the engineers
experienced as they pushed forwards from the Missouri River. Here it
was the hostility of man which harassed them. The Indians, driven from
the eastern States by the march of civilisation, resisted its further
approach into their domain. Fierce opposition was anticipated, but
the results proved far more serious than the most gloomy forebodings.
At every turn the savages swept down upon the little band toiling in
the solitude of the wilderness, and these organised onslaughts became
fiercer and fiercer as the base of operations was left farther and
farther to the rear. For every spike that was driven, clinching a rail
to its wooden cushion beneath, an arrow sped from an Indian bow, to
be answered by the sharp crack of a rifle from the railway building
forces. History does not record how many navvies fell victims to the
noiseless weapon of the savages, or how many Indians entered the
Happy Hunting Ground by way of a bullet. Yet the total of lives would
outnumber the spikes driven to secure the metals for the 1,800 miles
between the Missouri River and the Golden Horn.
A conclave with the Red Men was urgent before the engineers stirred
from the bank of the Missouri. Council Bluffs is a famous spot in
the history of the New World, because here the Indians were wont for
centuries to meet to settle tribal disputes. It was here that Collis P.
Huntington and his colleagues met the Red Men to discuss the terms and
treaty for the acquisition of the necessary land to found the city of
Omaha.
At that day the nearest point to which the railway had advanced towards
the river from the east was Des Moines. The first locomotive required
for constructional purposes upon the Central Pacific, and which weighed
some 60 tons, had to be hauled across country on the deck of a trolley
by teams of horses. When the trans-continental railway was taken in
hand, however, the eastern railways were pushed forward with great
speed to reach Council Bluffs, in order to carry the thousands of tons
of supplies of every description requisite for building purposes.
The scarcity of one commodity was felt severely. In this country one
may travel for miles and not see a single tree. This hit the railway
hard. Every baulk of timber, whether it was required for a fire, a
shack, or a sleeper, had to be brought over enormous distances. By
the time a sleeper was laid it often cost as much as $2.50, or ten
shillings!
The route between east and west is popularly known as the “Overland
Route.” How it received this name is a little story in itself. Among
those who arrived at San Francisco in the glorious days of ’47 to
make money out of the gold-rush was a Dutchman, whose topsy-turvy
English was characteristic of a foreigner possessing only an imperfect
acquaintance with our tongue. He opened a saloon, which became a most
popular resort. Whenever a stranger entered the rendezvous, Boniface’s
curiosity was aroused. The new arrival was asked inevitably by which of
the three routes he had gained the Golden Gate. “Did you come the Horn
around, the Isthmus across, or the land over?” the Dutchman inquired.
“The land-over” signifying the wagon-trail across the States, so
appealed to the fancy of the railway-builders that they always referred
to the trans-continental as “the land-over route,” which in course of
time became twisted into the more correct designation under which it is
known to this day.
The level character of the country west of the Missouri River lent
itself favourably to rapid construction, as well as easy alignment.
At one place it was found possible to lay the track as straight as an
arrow for 41 miles. The grade grew quickly, and the rails advanced in a
continuous black-grey line across the prairie with striking rapidity,
when the Indians refrained from endeavouring to arrest its progress.
However, the raids of the Red Men became so devastating eventually that
it appeared as if work must be brought to a standstill.
At the critical moment another man appeared on the scene, and his
efforts contributed very materially to the completion of the line. This
was Major Frank J. North, one of the most daring frontiersmen that
those troublous times with the Indians produced in America. He was
Fenimore Cooper’s mythical “Pathfinder” in the flesh, and he came to
be just as greatly feared by the Red Men. When the railway engineers
failed to make headway against the Indians, he offered his services,
which, needless to say, were accepted gladly. From that moment the
protection of the grade became his one object in life, and his capture
became the one absorbing ambition of the Indians. He had roamed the
plains for years, leading a rough-and-ready frontier life, had become
familiarised with the Indians, their habits, customs and ways; could
anticipate their every movement and knew how to counteract their
subterfuges. He was versed thoroughly in their ways of warfare, was a
born fighter, and was possessed of indomitable energy and pluck.
In order to protect the railway-builders he raised four companies of
friendly Pawnee Indians. With these trusty scouts he would creep out
stealthily at night from the constructional camp, make his way with
impunity to the tepees of the Cheyennes or Sioux, and ascertain their
projected operations. Sometimes he would surprise an Indian camp,
and scatter the inmates who were on the warpath to the four winds.
His marauding expeditions became so audacious that the natives were
compelled to withdraw a respectable distance from the grade. He became
so universally detested among the foe that the mention of North’s name
was sufficient to provoke the most dismal howls of execration and
vicious snarls of vengeance.
At times he was absent so many days from the railhead camp that the
engineers wondered gravely whether or not he had met an untimely end.
Then when they were on the point of giving up hope of seeing him again,
he would trot unconcernedly into camp, with his Pawnee shadows, as if
returning from a hunt, but his general appearance and self-satisfied
air told the navvies that he “had been at the Indians again.” He
provoked the hostile Red Men to such an extreme pitch that they turned
out in tremendous force sworn to his capture or death. Four times a
pitched battle was fought, with tremendous losses; four times the
Indians drew off, leaving North flushed with victory. At last the enemy
became so disheartened that it withdrew, retreated for miles from the
line, and there was a sullen interval in the conflict.
North, however, was not to be lulled into a false sense of security.
He divined that some ulterior move was projected. So it proved. The
Indians, instead of concentrating their energies upon the destruction
of the forces at the railhead, decided to attack the long line of
communication at various points, to surprise and destroy the supply
trains. A guerilla war broke out, and this baffled North, for he could
not bring them to a pitched battle.
The Indians clung like limpets to the grade, and woe betide any
stragglers who fell into their hands, for they were cruelly tortured
and put to death. Time after time, as the supply train was puffing
along slowly, the plain on either side suddenly would reveal hordes of
ferocious savages, who had crept through the tall grass unobserved
to within a few feet of the track. The men on the train secured
any shelter possible behind the transported goods, and blazed away
furiously. Brisk skirmishes and opportunities to display marksmanship
occurred nearly every day to relieve the tedium of swinging hammer,
pick-axe and shovel. Major North happened to be attacked in this way
one day, though the enemy were unaware of his presence. But they were
so dismayed at the spirited reception that they received that they
broke and fled, with North in pursuit. He chased them for hours, and
inflicted such losses that the tribe surrendered. A few days later a
large number of the vanquished enlisted under the railway-builder’s
banner, assisted in the building of the grade, and became law-abiding
citizens.
There was one point which was a tempting prize to the Cheyennes. This
was a depot 372 miles west of Omaha. Its safety was entrusted to
North’s friendly Indians, and they proved too watchful to enable a raid
to be made with success. The Cheyennes were determined to secure its
capture, and, quietly gathering reinforcements, one day made a supreme
attempt to rush it with a thousand men. It was a desperate battle that
ensued, but the defenders, being entrenched, secured the advantage, and
after fighting desperately for several hours were left in possession of
the hundreds of tons of supplies.
These tactics had to be pursued for some 500 miles, but the engineers
in time became wearied at the daily round of working and fighting.
Besides, they were approaching the Rocky Mountains, where the physical
difficulties would be so great as to demand their entire concentration
in order to lift the metals over an obstacle 8000 feet above the sea.
It was realised, also, that the broken slopes would give the Indians
every advantage to prosecute their guerrilla warfare to distinct
advantage. The outlook was so depressing that a halt was called. The
situation was urged upon the Government, and, as a result, General
Grant decided to interview the Indians in person, with a view to
placating them. He made a hazardous and exciting journey along the
railway to the heart of the enemy’s country. There, with pow-wow and
peace-pipe, an honourable treaty was drawn up; the Indians promised to
abandon their opposition, and to permit the railway to go forward.
Another difficulty the builders had to battle against was the scarcity
of labour. The Californian Gold Fields were too magnetising to
cause the men to stay long on the grade. They preferred to woo the
fickle goddess of fortune in a scramble for the yellow metal, to a
steady, daily round of toil at a regular wage. As a last resource
the sheet-anchor of the railway-builder had to be called in--the
Chinaman. The Orientals stuck to the work, and under their efforts
the line progressed with greater speed than had been possible before
their advent. At one time the rails were laid so speedily that the
teams could not bring up supplies fast enough to meet the needs of the
graders and track-layers.
The permanent way was crude. It was a pioneer line in very truth. The
earth was thrown up roughly, the sleepers were dumped on its crown, and
the rails were hastily spiked to their bed. The line was little better
than what one sees hastily improvised for the transportation of spoil
on large engineering works. It writhed and twisted among obstructions
in a fantastic manner, for the engineers, having neither funds nor time
at their disposal, merely ran round or over humps, whichever method
was the quicker. Speed and comfort were negligible considerations.
The line, once communication with the coast was established, could be
overhauled and strengthened later at leisure. Consequently, travelling
was rough, the oscillation was severe, and the danger of derailment
always existent. It was these conditions that prompted a phlegmatic
Englishman, who essayed the journey shortly after the line was opened,
to remark that “the train travelled more smoothly when it was off the
rails!”
Some idea of the speed with which work was prosecuted, the innumerable
drawbacks notwithstanding, may be gathered from the fact that the whole
1,800 miles of line were built and opened to traffic within six years
from the turning of the first spadeful of earth at Sacramento. For the
greater part of this distance the monthly average was 50 miles--truly a
magnificent feat. In order to maintain this high pressure, 25,000 men
and 5000 cattle teams were required, and the total cost of the work was
$115,000,000, or, roughly, £23,000,000.
The dawn of the year 1869 saw the two advancing arms racing towards the
Great Salt Lake. The Central Pacific, upon encountering this inland
sea, debouched to the north and plunged into the broken Promontory
Range. Here, at an altitude of 5000 feet, the two arms met, and, amid
the wild huzzas of over a thousand people, the last gap was closed,
and golden spikes were driven into a sleeper of polished laurel by
Leland Stanford and Thomas Durant, the presidents of the respective
divisions, to admit the passage of a train, waiting close by with steam
up, to pass from the Central to the Union Pacific Railway. The precise
point at which the opposing armies met is indicated by a board standing
beside the track, the inscription on which runs--
LAST SPIKE,
COMPLETING FIRST
TRANS-CONTINENTAL RAILROAD
DRIVEN AT THIS POINT,
MAY 10, 1869.
The occasion was one of great rejoicing, especially among the citizens
of San Francisco. The town went mad with excitement. The festivities
commenced two days before the golden spike was driven, and was
continued for two days afterwards. Literature contributed its quota to
the commemoration of the historic event in the form of a poem from Bret
Harte.
In crossing the prairie stretches the railway constructional forces
were indebted appreciably for their support to the buffalo, which
roamed the plains in tens of thousands. The slaughter of this animal
was tremendous to provide fresh meat for the camps, and hides for the
clothing of the workmen against the blasts and severe cold of winter.
Their existence was providential, especially when the Indians succeeded
in capturing and destroying the supply trains bringing up provisions.
Water often was a serious problem. For stretches of over a hundred
miles at a time not a drop could be obtained from the parched land, and
specially-built cars had to be pressed into service to transport this
indispensable commodity.
Some idea of the solitude of the country may be gathered from the fact
that during a continuous 600 miles not a single white man or homestead
was seen. Before the line was completed a pony express plied between
Sacramento and Salt Lake City, and the journey under normal conditions
occupied three and a half days. To-day the distance is covered in about
one-third of the time.
In the course of a few years the traffic on the Overland Route assumed
such proportions as to be beyond the capacity of the ill-laid track.
The grades were too heavy and the curves too sharp, while rails and
bridges were too light. Extensive reconstruction was taken in hand.
Banks were abolished, curves were straightened, bridges were rebuilt,
the permanent way was re-ballasted, short sections were cut out here,
or introduced there, to reduce the mileage--in short, the whole line
was rebuilt practically at an expenditure of millions to bring the
great highway up to the model of present-day practice.
One of the most important of these improvement works was that known
as the Lucin Cut-off. This was a daring piece of engineering forced
upon the railway by rival lines, which, possessing easier grades and
a better-alignment, could haul heavier loads at a speed beyond the
capacity of the pioneer road. This adverse factor was experienced very
severely around the north end of Salt Lake, where the line plunges into
the rugged and broken Promontory Range, to overcome which such heavy
grades had to be introduced as to reduce the speed of trains to a crawl
of 12 miles per hour.
At first it appeared impracticable to ease this situation, but the
chief engineer was called in and urged to find a means of extricating
the company from the predicament. After several months’ survey around
this sheet of water he prepared plans which he submitted to his
directors. They were extremely audacious. He suggested the abandonment
of 373 miles of the old line completely, as it was beyond improvement.
In its place he proposed 326 miles of new track, which not only showed
a saving of 57 miles in distance, but gave no ruling grade exceeding
21.12 feet per mile. At one point he was baulked by the configuration
of the country in the Pequop range, where a grade of 74 feet to the
mile was found unavoidable. Moreover, he showed a saving of over
half-a-mile in vertical height, the climb on the westward run being cut
down from 4,550 feet to 1,535 feet, and on the eastward journey from
4,456½ feet to 1,444 feet.
The salient feature of the scheme, however, challenged particular
attention. Instead of running around Salt Lake he advocated a route
across it, giving a line as direct as the bird flies from shore to
shore, supported on earthen embankments where such could be erected,
and in other places upon a timber viaduct. Some idea of what this
scheme represented may be gathered from the construction of a bridge
from Dover to Calais--a project that has been promulgated--for the
distance was about the same.
The engineer was prompted in his belief as to the practicability of the
suggestion from his personal investigations. Popular fancy had clothed
this stretch of salt water in many legends, one of which was that its
depths were unfathomable. This fallacy was scattered to the winds when
soundings were taken, for the water was found to be comparatively
shallow at the point it was contemplated to cross the lake. Collis P.
Huntington hesitated from embarking upon the scheme when it was first
unfolded, partly on account of its estimated cost, but more because of
its unusual character.
However, when E. H. Harriman secured the control of the line, he
entertained no qualms. His engineer said it was feasible, so it must
be done to avoid that laborious haul over the hills to the north. Work
commenced forthwith, and was pursued with great vigour. When the bank
of the lake was gained, the engineer pushed the earthen embankment
as far into the water as he could, so as to reduce the extent of the
trestling. The distance from shore to shore was 27 miles, but as he
took advantage of a peninsula which juts well into the water from the
north bank, four miles of the line were built on dry land.
To commence the embankment from the water’s edge an ingenious expedient
was adopted. Heavy planks loaded with weighty bags of sand were floated
out on the proposed location, and upon this novel permanent way the
temporary rails for the ballast cars were laid, and the spoil dumped
into the lake until the embankment appeared above water-level. Then
the section of floating track was pushed still farther ahead, and the
same cycle of operations repeated until the limit of the earthwork was
gained. As the embankment grew in height the light rails were replaced
by a heavier type, over which rumbled cars carrying 40 tons of ballast
apiece, and which was pitched pell-mell into the water on either side.
The embankment was then left for a while to permit settling to take
place. In time it became as solid as a jetty.
The trestle section proved the most trying, not so much on account
of the technical questions involved, but owing to the difficulty in
obtaining timber. The wood had to be brought hundreds of miles from the
forests of Texas and the north-west. Extensive stretches of trees were
purchased and saw-mills were erected to cut the logs to the desired
dimensions on the spot. Upon arrival at Salt Lake the wood was dumped
into the water, large log booms being formed, so that the material
might become seasoned thoroughly.
Work was delayed considerably by the lack of supplies of timber,
from storms which swept this inland sea, and which at times wrought
considerable damage. At one or two places, although careful soundings
were taken, the lake bed proved fickle. When the pile-drivers were set
to work, banging the massive uprights into the solid earth, progress
would be painfully slow for a time, and then suddenly the pile would
descend with uncanny rapidity. The cause was discovered readily. The
lake bed is covered with a thick crust of salt and soda deposits, the
accumulation of centuries, packed so hard as to give the semblance
of being solid rock when sounded. Yet it was only a shell or crust
covering unstable soil below. Driving the piles broke up this rind, and
then a solid foundation could not be found.
Attempts to remedy this state of affairs were made by pitching rock
into the water to provide a solid floor to support the timber uprights.
This method proved so slow and expensive that the engineer devised
another solution of the difficulty. He ran out a light trestle and
dumped rubble overboard around its foundations until the woodwork was
buried completely, and a solid earthen embankment was produced to carry
the rails.
The actual extent of timber trestling aggregates 12 miles, and this
erection spans the lake practically at its narrowest central part. Some
of the pile-drivers were carried on floating pontoons, while others
were mounted on the track above, the permanent way being pushed forward
as rapidly as the timber work was completed. Owing to the depth of the
water, some of the upright members are as much as 110 feet in length.
They are disposed in rows of five at right angles to the track, and
connected by massive longitudinal members, on which is laid three-inch
planking, superimposed with a layer of ballast. It was while building
the timber work that the greatest depth of water was reached--from 30
to 34 feet.
The trestle was erected with striking rapidity, the record being the
completion of no less than 5,317 feet of track in six working days. Had
it been possible to bring the timber up more quickly, a greater length
of line could have been laid in the time. At rail-level the viaduct
is 16 feet in width, and the track is so smooth and solid that the
“Overland Limited” can hurtle along at full speed without producing the
slightest vibration.
By the time the viaduct was completed, 38,256 piles had been used. This
represented no less than 2,824,700 lineal feet of timber which had been
torn from the forests. If these logs had been placed end to end they
would have formed a continuous line for nearly 535 miles.
So straight did the engineer plot and build the Lucin Cut-off, that
even if he had complied with Euclid’s definition of a straight line,
it would have been necessary only to have deducted 1,708 feet from the
102.91 miles of track which he laid. In addition, he abolished 3,919
degrees of curves. To understand what this means it is only necessary
to remember that each degree represents a segment of the circle. By
dividing the above total by 360, the number of degrees to the circle, a
result of 11.88 circles is obtained. In other words, on the old route
between Lucin and Ogden, the train not only traversed the distance
between the two points, but described nearly 12 circles as well. For
36 miles the track is dead level and for another 30 miles the rise is
so slight that one has to walk half-a-mile to rise his own height. By
the time the task was completed a round £1,000,000, or $5,000,000, had
been expended. It appears a huge outlay to reduce working expenses and
to increase revenue, but it affords a striking illustration of the
boldness of guiding railway spirits in America.
CHAPTER VI
THE LONGEST “TOY” RAILWAY
The Principality is a land of many surprises to the visitor, for it
possesses innumerable attractions. Yet it is doubtful whether any
feature arouses more interest in North Wales than the strange little
railway which runs from Portmadoc for a distance of 13¼ miles among
the mountains. Certain it is that no tourist would think of omitting a
journey over what is known colloquially as the Festiniog “Toy” Railway,
for it is one of the great sights of North Wales.
For several years it held a unique position among the great systems of
the world as the narrowest gauge line in operation. The metals are laid
only 23¼ inches apart--less than half the distance between the rails
forming the roads of the greater proportion of steel highways bounding
the globe--and yet it has a traffic which many a more important railway
would have just cause to envy. Visitors disembarking from the London &
North-Western express at Portmadoc, and seeing the diminutive engine
and trucks drawn up alongside on their own road and completely dwarfed
by the towering rolling-stock of the standard-gauge line, cannot
repress a smile, for the engines, cars, trucks and wagons are no larger
than are used upon the larger-sized model railways devised to-day for
the amusement and education of the young.
Yet it is a complete pocket edition of the familiar railway, and its
capacity is amazing. The engine provokes interest, for it is no taller
than an average-sized person. Its coupled wheels are only 28 inches in
diameter, while the cylinders measure but 8¼ inches in diameter and
have a stroke of only 13 inches. The cars and wagons are on the same
scale, and the first impression of the diminutive iron horse awakens
doubts as to whether it is safe to trust oneself to its care. But see
that self-same engine busy at work hauling a train of 7 passenger
coaches, a guard’s van, 10 goods wagons and 100 or more empty slate
trucks, stretching out for a length of 1,200 feet and representing a
total load of 110 tons, out of Portmadoc, bound for the quarries, and
disdain gives way to complete admiration.
The locomotive “Little Wonder,” despite its age, for it dates back from
1869, completely justifies its appellation, for it handles the above
load on the steepest grades with ease, and attains a speed of 30 miles
an hour where the physical conditions are suited to fast travelling.
The work it has to fulfil is not to be despised by any means, for the
country through which the line extends is amongst the most rugged in
the country. In the course of the thirteen and a quarter miles it
has to overcome a difference of 700 feet in altitude, which means a
pull against the collar for the whole way from Portmadoc, though the
gradients are of varying severity. Yet even the easiest climb is 1 in
186, while the steepest rise is 1 in 68.6; with a bank of no less than
1 in 36 on one of the spur lines. The curves likewise are startling in
their sharpness and frequency, and at times when the engine is loaded
to its utmost capacity the train may be seen writhing like a gigantic
black snake along three curves at the same time.
The permanent way was originally laid in 1839, the enterprise having
been carried out for the conveyance of slate from the quarries
to Portmadoc. On the downward journey the laden trucks travelled
by gravity, the empties being hauled back by horses. In the late
’fifties, however, the chief engineer, Mr. C. E. Spooner, realising
the far-reaching advantages arising from the use of power, suggested
that the tramway should be converted into a railway, and in 1863 his
suggestion was adopted. In the early days travelling was exciting, for
the bridges and tunnels were so low that the engine-driver, stoker and
other officials on the line had to duck their heads when they reached
these obstacles, since to stand upright in one of the vehicles was
certain to court a violent end by collision with these structures.
These, however, have been altered so that one need entertain no more
apprehension concerning safety on this line than when travelling
upon a standard-gauge road. Visitors, realising the fact that by its
means they could be conveyed comfortably to some of the wildest and
most beautiful corners of the Principality, sought its transportation
assistance, and in 1864 passengers were first carried as an experiment,
but free of charge. The Board of Trade did not decline to sanction its
operation in the interests of the public, but possibly somewhat dubious
of the wisdom of their action, hedged in the privilege with certain
restrictions, the most important of which was limitation of speed.
When, however, it was proved that there was no danger in travelling
over this two-foot line at 30 miles an hour this latter ban was removed.
The line possesses several features of technical interest, and being
a single track, is operated upon the staff system, with every device
to secure absolute safety in operation in the form of signalling
and telegraphing facilities. Moreover, travelling is comfortable,
for although the gauge is less than two feet, the cars, designed
by the engineer, are built on the bogie principle and have seating
accommodation for fifty passengers. A trip over the line certainly
constitutes an experience.
The complete success which attended the conversion of this railway from
equine- to steam-power in 1864 stimulated the wider adoption of the
narrow-gauge system, though as a rule this term is somewhat elastic,
inasmuch as it signifies that such a railway has a gauge less than the
standard width of 4 feet 8½ inches, and is particularly associated with
the 39 inch or 42 inch gauge. Still several “two-foot” lines were laid
down, especially in France and India, so that the Festiniog experiment
has proved a very profitable “toy” to more countries than one. In
fact, not far distant from the pioneer toy railway is another--the
North Wales Narrow Gauge railway--which connects Dinas, near Carnarvon,
with Snowdon Station.
These railway systems, however, are of short length, and when one
remembers the broken character of the country which they serve, their
_raison d’être_ is obvious. But the application of the idea to a
trunk line 360 miles in length appears quite impracticable. Yet it
has been accomplished, and its realisation has opened up a corner of
Africa which formerly was almost impassable, and which, but for its
fulfilment, would have left the country traversed in the hands of
hostile natives.
This “toy” railway upon a large scale is the Otavi Line, which connects
Tsumeb, buried 368 miles in the heart of the wilderness of German
South-West Africa, with the coast at Swapkomund. To-day it ranks as
the longest narrowest gauge line in the world, the metals, as in the
case of the Festiniog railway, being laid only 600 millimetres, or
approximately two feet apart.
In the late ’eighties prospecting parties who had heard of the mineral
wealth lying dormant in this inhospitable and inaccessible country,
set out to ascertain whether rumour could be verified to a sufficient
extent to ensure the riches of the rocks being exploited commercially.
They suffered great privations and hardships in their toil across the
waterless veldt, but when they gained the Otavi country they found that
their journey was more than repaid by enormous discoveries of copper.
They collected detailed information concerning the extent of these
deposits, and when they returned to Europe it was decided to develop
the new “Copperado” without further delay.
However, there was one critical point. How could the mineral, after
being mined, be transported to the coast for shipment. The intervening
country was among the most sterile to be found in the continent south
of the Sahara. The mining companies concerned at once suggested a
railway as the only solution of the problem. But they realised very
readily, from the reports of their emissaries who had ventured
to Otavi, that such an undertaking was beset with difficulties
innumerable, while the construction of a line upon the standard gauge
would prove ruinously expensive. In order to secure extrication from
their plight the companies approached the firm of Arthur Koppel of
Berlin. The latter company dispatched a corps of its own surveyors to
the country to spy out the desert between the coast and the mines,
in order to find the best location and to report generally upon the
engineering features of the scheme.
When the surveyors returned to civilisation they unhesitatingly
recommended a light narrow-gauge railway, such as they had built
in several parts of the world where similar conditions prevailed.
They advocated the 600 millimetre or two-foot gauge because it not
only would meet all traffic requirements for many years to come, but
its initial cost would be so much cheaper, and it could be built so
much more quickly than a wider or standard gauge. The recommendation
was debated at great length, and after discussing the relative
estimated capital and operating costs of lines of different gauges,
the overwhelming advantages presented by the “toy-line” gauge were
found to outweigh any arguments that could be raised against it.
The mining companies merely demanded the line as a link between the
copper country and the coast for their own purposes. The country
lying between the coast and the mines held out no attractions for any
economic development, so that all the requisitions likely to be made
by the mining companies could be met adequately by such a railway.
Consequently the recommendation of the engineers was accepted, and they
were entrusted with the completion of the undertaking.
[Illustration: BUILDING THE OTAVI LINE THROUGH THE GERMAN SOUTH-WEST
AFRICAN BUSH
Hereros, Ovambos and Italians working side by side.]
When the mining companies expressed their decision they did not
anticipate the extraordinary traffic which the railway would be called
upon to fulfil a little later. These were duties which not only taxed
the capacity of the diminutive railway to a supreme degree, but were
of a character which justified the confidence of the engineers and
practically saved the colony to the German Empire.
[Illustration: THE PASSAGE OF THE FIRST TRAIN, GAILY DECORATED FOR THE
OCCASION, OVER THE “TOY-LIKE” OTAVI RAILWAY]
This reproduction of the Festiniog toy railway was commenced without
loss of time. In 1903 constructional engineers with a boat-load of
constructional material were dispatched to South Africa, and the grade
was commenced from Swakopmund, at a point 40 feet above the sea-level,
the location extending in a north-easterly direction to Otavi, 300
miles distant in the interior.
The first sod was turned in October, and the constructional engineers
bent to their task with great zest. But scarcely had they got into
their stride when the Hereros rebellion broke out. This was an
unexpected development, and as the natives had been recruited in large
numbers to build the permanent way, the engineers were faced with a
grave situation. At the first signs of the insurrection the greater
majority of the natives threw down their tools and stampeded from the
line to their towns and villages to take up arms. The Governor of the
colony strove to arrest this wholesale desertion by recourse to drastic
measures--he seized as many men working on the grade as he could and
placed them safely under lock and key. The result was that the little
band of white engineers was left with scarcely a navvy to assist them.
However, they struggled on as best they could, but progress was
painfully slow. At first the insurrection was belittled--regarded as a
flash in the pan--and the engineers anticipated confidently the early
return of their workmen. But these illusions were dispelled rudely when
it became realised at last that the country was up in arms from end to
end. There was only one way out of the desperate situation, and that
was to import labour from Europe. Such a step upset the preliminary
estimates for the undertaking to a pronounced degree, for the native
labour had been taken into the calculation when framing the cost of the
work. To bring white labour from Europe increased the capital outlay
very appreciably. However, there was no alternative, and accordingly
an Italian contractor arrived on the scene with a small army of 300
Italians, and work resumed its former busy aspect.
However, peace did not reign for long. The Italian workmen saw
that they held the advantage over the engineers, that there was no
competitive labour, and accordingly they struck for higher pay. The
engineers, caught on the horns of a dilemma, had to surrender, and the
Italians picked up their tools. Then another cause of dissatisfaction
manifested itself. The workmen concluded that they were being driven
too hard, so they declined to perform a full day’s labour. They
held the whip-hand and emphasised its potency so frequently, and
the friction between employers and employed became so keen, that it
appeared more than once as if the contract would have to be suspended
until the rebellion was quelled.
While these disputes and continual bickerings were at their height
further complication was provoked. The German military authorities,
finding the subjugation of the Hereros a far heavier task than they
had anticipated, wished to penetrate into the heart of the country
so as to strike a supreme blow upon the enemy’s stronghold. They had
their own line extending from Swakopmund to Windhuk, but owing to its
heavy grades and light construction it had broken down completely
under the strain of the heavy military traffic. The authorities strove
to alleviate this situation by utilising bullock-carts to transport
troops and commissariat up-country, but this alternative failed
lamentably. This service was so slow, and the absence of water by the
wayside was felt to a serious degree. In their extremity the German
Government appealed to the engineers of the Otavi line. They besought
them to spare no effort to drive the railway forward speedily, first
to Ouguati, 109¾ miles from the coast, and then to Omaruru, 145 miles
beyond the former point. As an inducement the builders were offered a
heavy premium.
The engineers agreed to meet official demands, and to expedite the
constructional work a further army of 750 Italians and 500 Ovambo
coolies was sent to reinforce the forces on the grade. To tempt the
Italian workmen to strive their utmost they offered a fixed minimum
wage as an incentive. However, it was not long before trouble arose
once more. The new arrivals fraternised with their compatriots already
on the scene, and learned how the engineers had been forced to pay
higher and higher wages by recourse to strikes. The Italians came
to the conclusion that concerted action would be highly successful
because several weeks would elapse before their places could be taken
by other imported labour, while they regarded the Ovambo coolies, who
proved industrious workmen, with supreme contempt. Every conceivable
obstacle was thrown in the way of the engineers. Work was stopped upon
the slightest provocation, and apparent grievances were aired with
monotonous frequency.
When at last they were placated and the workmen did settle down to
their tasks they proceeded in a lackadaisical manner, and the day’s
work was only a quarter of what might have been accomplished. Under
ordinary circumstances each Italian could have coped with 10 cubic
yards of earthwork per day, but they handled only about 2¾ cubic yards!
This rendered them distinctly inferior to the Ovambos, who, though not
comparable with the Europeans from the physical point of view, plodded
along steadily, and handled on the average from 3½ to 4 cubic yards per
day. The Italians had no complaint concerning their scale of payment,
for they received from 5_s._ to 10_s._--$1.25 to $2.00--per day, while
the coolies, who did twice the work, received but 2_s._ 6_d._ or 60
cents a day, together with food and housing accommodation.
One day matters reached a climax. The white workmen struck in a body,
and declined to move a hand unless they received another increase in
wages. The engineers, who had been groaning under the extortionate
demands of the blackmailing Italians for several weeks past, now took
a firm stand. They declined point-blank to entertain the proposal.
Moreover, they commenced to take the law into their own hands and
to adopt stern measures. Several of the leading recalcitrants were
straightway dismissed for breach of contract. This situation lasted for
eight weeks, and at times the outlook became extremely threatening,
for the Italians chafed under the unexpected opposition they had
encountered. Suddenly the dispute collapsed and the Italians sullenly
returned to their work.
Coupled with this distressing condition of affairs at the railhead,
the engineers experienced grave difficulties at Swakopmund. They could
not get the constructional and other material unloaded from their
ships. This harbour is notoriously a bad one, and being congested with
military traffic, method and order had given way to complete chaos.
Weeks elapsed before an incoming ship could discharge its cargo for
the railway, and then the engineers only secured their requirements by
building a special mole because the anchorage was silting up with sand.
In the spring of 1905 matters took a more hopeful turn. The sullen
Italians were spurred on by the granting of premiums, and under this
inducement more rapid progress was effected. The white workmen were
forced to their tasks by the appearance of severe competition. Many of
the Hereros grew tired of fighting and surrendered to the authorities.
When asked if they would be content to work upon the railway they
accepted the offer with alacrity, and the Italians saw that they were
in serious danger of being displaced entirely. The fair treatment that
was meted out to the natives who had surrendered became noised far
and wide through the country, with the result that large numbers of
Hereros, who had grasped the hopelessness of their opposition, made
their way to the railhead and threw down their arms and offered to take
up the pick and shovel. It was a curious sight, for here were large
numbers of the natives, against whom war was being waged, voluntarily
assisting in the advance of the very force that was being driven
forward to bring about the complete subjugation of their race. Curious
to relate, moreover, the engineers found that their former implacable
foes, when properly treated, developed into splendid conscientious
workmen, and far easier to control than the much-vaunted white labour.
After leaving the coast the railway makes practically a continuous and
steady climb to a maximum height of some 5,218 feet in the course of
its 360 miles. Notwithstanding this extreme difference in altitude, it
was found possible to keep the banks easy, the sharpest gradient being
1 in 50. The country traversed is most inhospitable, the first 145
miles being through a wild desert, and wide stretches of scrub-covered
country broken with kopjes. Extensive bridging was found necessary
to carry the track across gullies and rivulets, there being in all
110 of these structures. They are built throughout of steel, the
deckplate girder type being the most generally favoured, and the most
important work of this class has a length of 333 feet, built up in five
spans. The curves were kept as easy as possible, the standard radius
being about 500 feet. Here and there, however, owing to the cramped
conditions of the route open to the track, it was found requisite
to reduce the radius to some 270 feet in order to avoid heavy and
expensive cutting through rocks and hills.
Some idea of the extent to which the engineers were delayed by their
repeated differences with the Italian workmen may be gathered from
the fact that although 23 months were occupied in carrying the rails
from Swakopmund to Omaruru, a matter of 145 miles, the second section,
from the latter point to Tsumeb, the present terminus, a matter of
215 miles, required but another year. When the railway was rushed
onwards from Omaruru, although the country to be crossed was somewhat
easier from the physical point of view, and lent itself to more rapid
construction, acceleration was attributable in the main to the ample
supply of labour available and absence of trouble with the workmen
engaged.
Another grave difficulty against which the builders had to struggle
was water. In fact, it might be said that the scarcity of this
commodity was more perplexing than those governing the labour, strikes
notwithstanding. It was not merely securing sufficient supplies for
the workmen’s needs, but also for constructional purposes, such as for
the locomotive boilers, mixing of concrete for masonry, and so forth.
On the first section every pint of drinking water had to be brought
up from the base on the coast to the railhead, and as this advanced
the difficulties concerned with its transportation increased. In some
instances bullock-carts were the only vehicles that could be pressed
into service for its conveyance over 30 or 40 miles. Throughout the
first 85 miles from Swakopmund to Usakos not a drop could be drawn
from the earth. Innumerable borings in search of the liquid were made
alongside the line as it progressed, but they were rewarded with no
material success. Occasionally small quantities were found, but it was
too brackish and quite unfit for drinking purposes. When Usakos was
gained the situation was eased somewhat by a local discovery, but the
water had to be softened before it could be used by the engines, and
accordingly a plant for treating the water in this manner had to be
brought up country and erected. This, however, was useless for domestic
purposes, and when the line was pushed on from Omaruru, special water
trains had to be run for the convenience of the workmen. Huge tanks
were laden on the cars and were carried from the coast to the railhead,
the journey occupying several hours. The trouble and expense involved
in connection with this vital requisite influenced the cost and time
occupied in building the line very unfavourably, so much so indeed,
that the preliminary estimates of the cost were exceeded very markedly.
This question has not been solved satisfactorily yet, and it
will remain to puzzle the administration of the line until some
conveniently-situated subterranean water supply is tapped on the
barren veldt. The load of every train has to be increased by a special
tank-tender coupled behind the engine containing 2,200 gallons of
water, which represents so much unremunerative load.
The rolling-stock is quite in keeping with this diminutive railway.
The tiny engines have driving-wheels 24 inches in diameter, while the
cylinders have a diameter of 12 inches and a stroke of 17¾ inches. Yet
they can haul a load of 100 tons at a speed of 25 miles an hour on the
level and at 9½ miles an hour on the steepest banks of 1 in 50.
This appears to be a mere crawl in comparison with the speeds with
which we are familiar on the standard railways. But when one recalls
the manner in which this little “toy” line has changed conditions of
travel in a lonely corner of the African continent, and the former
rate of progress possible by bullock-cart, even 9½ miles an hour
appears to be an amazing speed. Before the iron horse appeared in
German South-West Africa, to travel from Swakopmund to Omaruru, a mere
145 miles, was a heroic achievement, entailing a laborious slow tramp
through lonely sterile wastes of boulders and scrub. A pace of 7 or 10
miles a day was considered fast travelling, and one who covered the
journey in a fortnight was considered to have driven hard. To-day the
same distance can be reeled off in about 12 hours.
CHAPTER VII
THE WONDERS OF THE TYROL
Probably there is no country in Europe wherein are compressed so many
and such varied marvels of engineering executed in connection with the
building of the iron road as in Austria. As is well known, the country
is a sea of towering rugged mountains, with steep slopes, knotted by
crags and scarred by deep gullies, intersected by broad sylvan valleys.
Such topographical conditions impose a severe tax upon the skill
and resources of the engineer. Consequently this territory has been
the scene of many grim grapples with Nature--some in which the odds
have been overwhelmingly against the engineers, and in which success
has been achieved only by dogged perseverance. Conspicuous in this
direction are the wonderful tunnels.
It was the successful piercing of the Mont Cenis and St. Gotthard
tunnels that first spurred the Austrian engineers to work of this
character. Their first attempt, the boring of the Arlberg, was such
a conspicuous success that they did not hesitate afterwards to have
recourse to such methods when all other means appeared impracticable.
To-day the country can point to four huge Alpine tunnels which stand
among the foremost achievements of their class in the world. Such ways
and means for forcing the iron road from one point to another are
highly expensive, but in each instance the ends have justified the
means. By their provision, points only a few miles apart as the crow
flies, and which with surface railways could have been connected only
by wearying, devious routes, have been brought into close communication.
When the Arlberg chain was taken in hand, the preliminary surveys
showed that it would approximate seven miles in length, and that about
the centre of the tunnel a solid mass of rock, 1,600 feet in thickness,
would extend from the roof and track to the storm-swept …