gutenberg.go-v.org

Tunneling: A Practical Treatise.

The Project Gutenberg eBook of Tunneling: A Practical Treatise. This eBook is for the use of anyone anywhere in the United States and most other parts of the world at no cost and with almost no restrictions whatsoever. You may copy it, give it away or re-use it under the terms of the Project Gutenberg License included with this eBook or online at www.gutenberg.org. If you are not located in the United States, you will have to check the laws of the country where you are located before using this eBook. Title: Tunneling: A Practical Treatise. Author: Charles Prelini Release date: August 3, 2019 [eBook #60043] Most recently updated: October 17, 2024 Language: English Other information and formats: www.gutenberg.org/ebooks/60043 Credits: Produced by deaurider, Harry Lamé and the Online Distributed Proofreading Team at http://www.pgdp.net (This file was produced from images generously made available by The Internet Archive) *** START OF THE PROJECT GUTENBERG EBOOK TUNNELING: A PRACTICAL TREATISE. *** Transcriber’s Notes Text between _underscores_, =equal signs= and ~tildes~ represents text printed in italics, bold face and sans-serif, respectively. Small capitals have been replaced with ALL CAPITALS. More Transcriber’s Notes may be found at the end of this text. TUNNELING: A PRACTICAL TREATISE BY CHARLES PRELINI, C. E. AUTHOR OF “EARTH AND ROCK EXCAVATION,” “DREDGES AND DREDGING,” “EARTH SLOPES, RETAINING WALLS AND DAMS,” ETC. PROFESSOR OF CIVIL ENGINEERING IN MANHATTAN COLLEGE, NE

source: Project Gutenberglicence: Public domain (per item)database: /home/dbs/gutenberg.dbmode: tablerecords: 544887 (max_rowid)citation: https://www.gutenberg.org/

The Project Gutenberg eBook of Tunneling: A Practical Treatise.

This eBook is for the use of anyone anywhere in the United States and
most other parts of the world at no cost and with almost no restrictions
whatsoever. You may copy it, give it away or re-use it under the terms
of the Project Gutenberg License included with this eBook or online
at www.gutenberg.org. If you are not located in the United States,
you will have to check the laws of the country where you are located
before using this eBook.

Title: Tunneling: A Practical Treatise.

Author: Charles Prelini

Release date: August 3, 2019 [eBook #60043]
Most recently updated: October 17, 2024

Language: English

Other information and formats: www.gutenberg.org/ebooks/60043

Credits: Produced by deaurider, Harry Lamé and the Online Distributed
Proofreading Team at http://www.pgdp.net (This file was
produced from images generously made available by The
Internet Archive)

*** START OF THE PROJECT GUTENBERG EBOOK TUNNELING: A PRACTICAL TREATISE. ***

Transcriber’s Notes

Text between _underscores_, =equal signs= and ~tildes~ represents text
printed in italics, bold face and sans-serif, respectively. Small
capitals have been replaced with ALL CAPITALS.

More Transcriber’s Notes may be found at the end of this text.

TUNNELING:
A PRACTICAL TREATISE

BY

CHARLES PRELINI, C. E.

AUTHOR OF “EARTH AND ROCK EXCAVATION,” “DREDGES AND DREDGING,”
“EARTH SLOPES, RETAINING WALLS AND DAMS,” ETC. PROFESSOR
OF CIVIL ENGINEERING IN MANHATTAN COLLEGE,
NEW YORK

_167 ILLUSTRATIONS_

SIXTH EDITION, REVISED AND ENLARGED

[Illustration]

NEW YORK
D. VAN NOSTRAND COMPANY
TWENTY-FIVE PARK PLACE
1912

COPYRIGHT, 1912,
BY
D. VAN NOSTRAND COMPANY
NEW YORK

Stanhope Press
F. H. GILSON COMPANY
BOSTON, U.S.A.

PREFACE TO THE SIXTH EDITION

During the few years that have elapsed since the publication of the
first edition of this work, the art of tunneling through different soils
and especially under large bodies of water, has made considerable
progress. During the last ten years, no less than eight subaqueous
tunnels involving the construction of sixteen tubes have been
constructed for the service of the city of New York alone. The reader
will, no doubt, also recall the tunnels under the Boston Harbor, the St.
Clair, the Charles and Detroit Rivers in our own country as well as the
tunnels under the Thames and the Seine in Europe. Engineers, contractors
and workmen have acquired such experience in these difficult underground
and under-river construction that the work is now undertaken without any
of the fear and hesitation that were associated with the earlier
enterprises.

As entirely new methods have been introduced by professional men, it was
found necessary to arrange the presentation of the subject in this sixth
edition so as to give due prominence to these recent methods.

Besides this, other changes have been made in order to give greater
attention to American method of excavating tunnels through rock and
loose soil. This will explain the treatment of the crown-bar and also
the extensive illustration of the heading and bench method as well as
the drift method of driving tunnels which is followed in the United
States.

Space has also been given to important tunnels recently built mainly for
the purpose of illustrating the various methods discussed in the text
and also to bring out more clearly the characteristics of the different
methods of tunnel excavation.

The author hopes that these added features will meet the present
requirements of engineers and students.

CHARLES PRELINI.

MANHATTAN COLLEGE,
NEW YORK CITY.

CONTENTS

PAGE

INTRODUCTORY--THE HISTORICAL DEVELOPMENT OF TUNNEL BUILDING xiii

CHAPTER

I. PRELIMINARY CONSIDERATIONS; CHOICE BETWEEN A TUNNEL AND AN
OPEN CUT; GEOLOGICAL SURVEYS 1

II. METHODS OF DETERMINING THE CENTER LINE AND FORMS AND
DIMENSIONS OF CROSS-SECTION 9

III. EXCAVATING MACHINES AND ROCK DRILLS; EXPLOSIVES AND
BLASTING 22

IV. GENERAL METHODS OF EXCAVATION; SHAFTS; CLASSIFICATION OF
TUNNELS 36

V. METHODS OF TIMBERING OR STRUTTING TUNNELS 47

VI. METHODS OF HAULING IN TUNNELS 59

VII. TYPES OF CENTERS AND MOLDS EMPLOYED IN CONSTRUCTING TUNNEL
LININGS OF MASONRY 66

VIII. METHODS OF LINING TUNNELS 72

IX. TUNNELS THROUGH HARD ROCK; GENERAL DISCUSSION;
REPRESENTATIVE MECHANICAL INSTALLATIONS FOR TUNNEL WORK 84

X. TUNNELS THROUGH HARD ROCK (_continued_); EXCAVATION BY
DRIFTS; THE SIMPLON AND MURRAY HILL TUNNELS 102

XI. TUNNELS THROUGH HARD ROCK (_continued_); EXCAVATION BY
HEADINGS 130

XII. EXCAVATING TUNNELS THROUGH SOFT GROUND; GENERAL
DISCUSSION; THE BELGIAN METHOD 143

XIII. THE GERMAN METHOD--EXCAVATING TUNNELS THROUGH SOFT GROUND
(_continued_); BALTIMORE BELT LINE TUNNEL 155

XIV. THE FULL SECTION METHOD OF TUNNELING; ENGLISH METHOD;
AMERICAN METHOD; AUSTRIAN METHOD 166

XV. SPECIAL TREACHEROUS GROUND METHOD; ITALIAN METHOD;
QUICKSAND TUNNELING; PILOT METHOD 182

XVI. OPEN-CUT TUNNELING METHODS; TUNNELS UNDER CITY STREETS;
BOSTON SUBWAY AND NEW YORK RAPID TRANSIT 195

XVII. SUBMARINE TUNNELING; GENERAL DISCUSSION; THE SEVERN TUNNEL 218

XVIII. SUBMARINE TUNNELING (_continued_); THE COMPRESSED AIR
METHOD; THE MILWAUKEE WATER-WORKS TUNNEL 225

XIX. SUBMARINE TUNNELING (_continued_); THE SHIELD SYSTEM 238

XX. SUBMARINE TUNNELING (_continued_); THE SHIELD AND
COMPRESSED AIR METHOD; THE HUDSON RIVER TUNNEL OF THE
PENNSYLVANIA RAILROAD 263

XXI. SUBMARINE TUNNELING (_continued_); TUNNELS AT VERY SHALLOW
DEPTH; THE COFFERDAM METHOD; THE PNEUMATIC CAISSON METHOD;
THE JOINING TOGETHER SECTIONS OF TUNNELS BUILT ON LAND 281

XXII. ACCIDENTS AND REPAIRS IN TUNNELS DURING AND AFTER
CONSTRUCTION 301

XXIII. RELINING TIMBER-LINED TUNNELS WITH MASONRY 315

XXIV. THE VENTILATION AND LIGHTING OF TUNNELS DURING
CONSTRUCTION 325

XXV. THE COST OF TUNNEL EXCAVATION AND THE TIME REQUIRED FOR
WORK 336

LIST OF ILLUSTRATIONS

FIGURE PAGE

1. Diagram Showing Manner of Lining in Rectilinear Tunnels 10

2. B. R. Value’s Device for Locating the Center Line Inside of
a Tunnel 11

3. Triangulation System for Establishing the Center Line of the
St. Gothard Tunnel 12

4. Method of Transferring the Center Line down Center Shafts 13

5. Method of Transferring the Center Line down the Side Shafts 14

6. Method of Laying out the Center Line of Curvilinear Tunnels 15

7. Diagram of Polycentric Sectional Profile 19

8, 9 and 10. Typical Sectional Profiles for Tunnel 20

11. Soft Ground Bucket Excavating Machine; Central London
Underground Railway 22

12. Column Mounting for Percussion Drill; Ingersoll Sargent Drill
Co. 26

13. Sketch of Diamond Drill Bit 27

14. Diagram Showing Sequence of Excavation for St. Gothard
Tunnel 36

15. Diagram Showing Manner of Determining Correspondence of
Excavation to Sectional Profile 38

16. Polar Protractor for Determining Profile of Excavated Cross-
Section 39

17. Joining Tunnel Struts by Halving 48

18. Round Timber Post and Cap Bearing 48

19. Ceiling Strutting for Tunnel Roofs 49

20. Ceiling Strutting with Side Post Supports 49

21. Sill, Side Post and Cap Cross Frame Strutting 49

22. Reinforced Cross Frame Strutting for Treacherous Materials 49

23. Longitudinal Poling-Board System of Roof Strutting 50

24. Transverse Poling-Board System of Roof Strutting 50

25. Shaft with Single Transverse Strutting 52

26. Rectangular Frame Strutting for Shafts 53

27. Reinforced Rectangular Frame Strutting for Shafts in
Treacherous Materials 53

28. Strutting of Timber Posts and Railway Rail Caps 56

29. Strutting Made Entirely of Railway Rails 56

30. Rziha’s Combined Strutting and Centering of Cast Iron 57

31. Cast-Iron Segment of Rziha’s Strutting and Centering 57

32. Cast-Iron Segmental Strutting for Shafts 58

33. Platform Car for Tunnel Work 59

34. Iron Dump-Car for Tunnel Work 60

35. Wooden Dump-Car for Tunnel Work 60

36. Box-Car for Tunnel Work 61

37. Elevator Car for Tunnel Shafts 65

38. Ground Mold for Constructing Tunnel Invert Masonry 67

39. Combined Ground Mold and Leading Frame for Invert and Side
Wall Masonry 67

40. Leading Frame for Constructing Side Wall Masonry 68

41. Plank Center for Constructing the Roof Arch 69

42. Trussed Center for Constructing the Roof Arch 70

43 and 44. A Typical Form of Timber Lining for Tunnels 73

45. Diagram Showing Forms adopted for Side-Wall Foundations 76

46 and 47. Transverse Sections of Tunnels Showing Methods for
Increasing the Thickness of the Lining at Different Points 79

48. Refuge Niche in St. Gothard Tunnel 81

49. East Portal of Hoosac Tunnel 82

50, 51 and 52. Arrangement of Drill Holes in the Heading of
Turchino Tunnel 91

53 and 54. Arrangement of Drill Holes in the Heading of the Fort
George Tunnel 91

55. Diagram Showing Sequence of Excavations in Drift Method of
Tunneling Rock 102

56. Sketches Showing Sequence of Work in Excavating and Lining
the Simplon Tunnel 111

57. General Details of the Brandt Rotary Drills Employed at the
Simplon Tunnel 112

58. Sequence of Excavation in the Murray Hill Tunnel 124

59. Traveling Platform for the Excavation of the Upper Side of
the Murray Hill Tunnel 125

60. Timbering Used in the Murray Hill Tunnel 126

61. Diagram Showing Sequence of Excavation in Heading Method of
Tunneling Rock 132

62. Method of Strutting Roof, St. Gothard Tunnel 135

63. Sketch Showing Arrangement of Tracks, St. Gothard Tunnel 135

64. Arrangement of Drill Holes in the Fort George Tunnel 137

65. Longitudinal Section of the Heading and Bench Excavation at
the Fort George Tunnel 137

66. Diagram Showing the Arrangement of Drill Holes in the
Heading and Bench of the Gallitsin Tunnel 140

67. Diagram Showing Modification of the Heading and Bench Method 140

68 and 68A. Diagrams Showing Sequence of Excavation in the
Belgian Method 145

69. Sketch Showing Radial Roof Strutting, Belgian Method 147

70. Sketch Showing Roof Arch Center, Belgian Method 147

71. Sketch Showing Method of Underpinning Roof Arch with the
Side Wall Masonry 149

72. Longitudinal Section Showing Construction by the Belgian
Method 149

73. Diagram Showing Sequence of Excavation in Modified Belgian
Method 152

74. Sketch Showing Failure of Roof Arch by Opening at Crown 153

75. Sketch Showing Methods of Repairing Roof Arch Failures 154

76. Diagrams Showing Sequence of Excavation in German Method of
Tunneling 155

77. Diagram Showing Sequence of Excavation in Water Bearing
Material, German Method 156

78. Sketch Showing Work of Excavating and Timbering Drifts and
Headings 157

79. Sketch Showing Method of Roof Strutting 157

80. Sketch Showing Roof Arch Centers and Arch Construction 158

81. Sketch Showing Method of Excavating and Strutting Baltimore
Belt Line Tunnel 162

82. Roof Arch Construction with Timber Centers, Baltimore Belt
Line Tunnel 163

83. Roof Arch Construction with Iron Centers, Baltimore Belt
Line Tunnel 164

84. Diagram Showing Sequence of Excavation in English Method of
Tunneling 167

85. Sketches Showing Construction of Strutting, English Method 168

86 and 87. Sketches of Typical Timber Roof-Arch Centers, English
Method 169

88. Sequence of Excavation in the American Method 172

89. Strutting the Heading in the American Method 172

90. Temporary Timbering of the Roof in the American Method 173

91. Showing Crown Bars Supported by Segmental Arches 173

92. Transversal and Longitudinal Section of a Tunnel Excavated
and Strutted According to the American Method 174

93 and 94. Diagrams Showing Sequence of Excavation in Austrian
Method of Tunneling 177

95, 96 and 97. Sketches Showing Construction of Strutting,
Austrian Method 178

98. Sketch Showing Manner of Constructing the Lining Masonry,
Austrian Method 179

99. Diagram Showing Sequence of Excavation in Italian Method of
Tunneling 183

100. Sketch Showing Strutting for Lower Part of Section 183

101 and 101A. Sketches Showing Construction of Centers, Italian
Method 184

102. Sketch Showing Invert and Foundation Masonry, Italian Method. 185

103. Sketch Showing Longitudinal Section of a Tunnel under
Construction, Italian Method 186

104. Sketch Showing Sequence of Excavation, Stazza Tunnel 186

105. Sketch Showing Method of Strutting First Drift, Stazza
Tunnel 187

106 and 107. Sketches Showing Temporary Strutting Arch
Construction, Stazza Tunnel 187

108. Sketch Showing Preliminary Drainage Galleries, Quicksand
Method 190

109. Sketch Showing Construction of Roof Strutting, Quicksand
Method 190

110. Sketch Showing Construction of Masonry Lining, Quicksand
Method 191

111. Sketch Showing Pilot Method of Tunneling 193

112. Diagram Showing Sequence of Construction in Open-Cut Tunnels 197

113. Sketch Showing Method of Timbering Open-Cut Tunnels, Double
Parallel Trench Method 198

114. Side-Wall Foundation Construction Open-Cut Tunnels 198

115. Wide-Arch Section, Boston Subway 204

116. Double-Barrel Section, Boston Subway 205

117. Four-Track Rectangular Section, Boston Subway 206

118. Section Showing Slice Method of Construction, Boston Subway 206

119. Double-Track Section, New York Rapid Transit Railway 212

120. Park Avenue Deep Tunnel Construction, New York Rapid Transit
Railway 214

121. Harlem River Tunnel, New York Rapid Transit Railway 215

122. Sketch Showing Underground Stream, Milwaukee Water-Works
Tunnel 229

123. Sketch Showing Methods of Lining, Milwaukee Water-Works
Tunnel 232

124. Longitudinal Section of Brunel’s Shield, First Thames Tunnel 241

125. First Shield Invented by Barlow 242

126. Second Shield Invented by Barlow 243

127. Shield Suggested by Greathead for the Proposed North and
South Woolwich Subway 245

128. Beach’s Shield Used on Broadway Pneumatic Railway Tunnel 245

129. Shield for City and South London Railway 246

130. Shield for St. Clair River Tunnel 247

131. Shield for Blackwall Tunnel 248

132. Elliptical Shield for Clichy Sewer Tunnel, Paris 249

133. Semi-Elliptical Shield for Clichy Sewer Tunnel 250

134. Roof Shield for Boston Subway 251

135. Transversal and Longitudinal Section of Prelini’s Shield 252

136. Elevation and Section of Hydraulic Jack, East River Gas
Tunnel 260

137. Cast-Iron Lining, St. Clair River Tunnel 262

138. General Elevations and Sections of Shields 270

139. Plan and Elevation of First Bulkhead Wall in South Tube,
Manhattan 273

140. Typical Cross-Sections of One Tube of Pennsylvania Railroad
Tunnel under the Hudson River 278

141. Sections of Cofferdam, Van Buren St. Tunnel, Chicago 283

142. Showing Working Platforms and Piles Sunk in Dredged Channel 286

143. Showing Sheeting-Piles for the Sides of the Caisson and
Trussed Beam for the Roof 287

144. Showing the Caisson with the Working-Chamber 287

145. Showing the Tunnel Constructed within the Caisson 289

146. Showing Sides of the Caisson and Supports for the Roof 290

147. Showing the Roof of the Caisson Formed by the Upper Half of
the Tunnel 291

148. Showing the Tunnel Completed by Building the Lower Half
within the Caisson 292

149. Transversal Section of the Caissons for the Tunnel under the
Seine River 294

150. Showing the Joining of the Caissons at the Pont Mirabeau
Tunnel under the Seine River 295

151. Cross-Sections and Plans of the Detroit River Tunnel 298

152. Tunneling through Caved Material by Heading 306

153. Tunneling through Caved Material by Drifts 307

154 and 155. Filling in Roof Cavity Formed by Falling Material 307

156. Timbering to Prevent Landslides at Portal 308

157. Shortening Tunnel Crushed by Landslide at Portal 308

158. Extending Tunnel through Landslide at Portal 309

159 and 160. Relining Timber-Lined Tunnel 316

161. Relining Timber-Lined Tunnel, Great Northern Ry 317

162. Relining Timber-Lined Tunnel, Great Northern Ry 318

163. Relining Timber-Lined Tunnel, Great Northern Ry 319

164. Construction of Centering Mullan Tunnel 320

165. Centering Mullan Tunnel 321

166. Relining Timber-Lined Tunnel, Norfolk & Western Ry 322

167. Relining Timber-Lined Tunnel, Norfolk & Western Ry 323

INTRODUCTION

THE HISTORICAL DEVELOPMENT OF TUNNEL BUILDING.

A tunnel, defined as an engineering structure, is an artificial gallery,
passage, or roadway beneath the ground, under the bed of a stream, or
through a hill or mountain. The art of tunneling has been known to man
since very ancient times. A Theban king on ascending the throne began at
once to drive the long, narrow passage or tunnel leading to the inner
chamber or sepulcher of the rock-cut tomb which was to form his final
resting-place. Some of these rock-cut galleries of the ancient Egyptian
kings were over 750 ft. long. Similar rock-cut tunneling work was
performed by the Nubians and Indians in building their temples, by the
Aztecs in America, and in fact by most of the ancient civilized peoples.

The first built-up tunnels of which there are any existing records were
those constructed by the Assyrians. The vaulted drain or passage under
the southeast palace of Nimrud, built by Shalmaneser II. (860-824 B.C.),
is in all essentials a true soft-ground tunnel, with a masonry lining. A
much better example, however, is the tunnel under the Euphrates River,
which may quite accurately be claimed as the first submarine tunnel of
which there exists any record. It was, however, built under the dry bed
of the river, the waters of which were temporarily diverted, and then
turned back into their normal channel after the tunnel work was
completed, thus making it a true submarine tunnel only when finished.
The Euphrates River tunnel was built through soft ground, and was lined
with brick masonry, having interior dimensions of 12 ft. in width and
15 ft. in height.

Only hand labor was employed by these ancient peoples in their tunnel
work. In soft ground the tools used were the pick and shovels, or
scoops. For rock work they possessed a greater range of appliances.
Research has shown that among the Egyptians, by whom the art of
quarrying was highly developed, use was made of tube drills and saws
provided with cutting edges of corundum or other hard, gritty material.
The usual tools for rock work were, however, the hammer, the chisel, and
wedges; and the excellence and magnitude of the works accomplished by
these limited appliances attest the unlimited time and labor which must
have been available for their accomplishment.

The Romans should doubtless rank as the greatest tunnel builders of
antiquity, in the number, magnitude, and useful character of their
works, and in the improvements which they devised in the methods of
tunnel building. They introduced fire as an agent for hastening the
breaking down of the rock, and also developed the familiar principle of
prosecuting the work at several points at once by means of shafts. In
their use of fire the Romans simply took practical advantage of the
familiar fact that when a heated rock is suddenly cooled it cracks and
breaks so that its excavation becomes comparatively easy. Their method
of operation was simply to build large fires in front of the rock to be
broken down, and when it had reached a high temperature to cool it
suddenly by throwing water upon the hot surface. The Romans were also
aware that vinegar affected calcareous rock, and in excavating tunnels
through this material it was a common practice with them to substitute
vinegar for water as the cooling agent, and thus to attack the rock both
chemically and mechanically. It is hardly necessary to say that this
method of excavation was very severe on the workmen because of the heat
and foul gases generated. This was, however, a matter of small concern
to the builders, since the work was usually performed by slaves and
prisoners of war, who perished by thousands. To be sentenced to labor on
Roman tunnel works was thus one of the severest penalties to which a
slave or prisoner could be condemned. They were places of suffering and
death as are to-day the Spanish mercury mines.

Besides their use of fire as an excavating agent, the Romans possessed a
very perfect knowledge of the use of vertical shafts in order to
prosecute the excavation at several different points simultaneously.
Pliny is authority[1] for the statement that in the excavation of the
tunnel for the drainage of Lake Fucino forty shafts and a number of
inclined galleries were sunk along its length of 3¹⁄₂ miles, some of the
shafts being 400 ft. in depth. The spoil was hoisted out of these shafts
in copper pails of about ten gallons’ capacity by windlasses.

[1] “Tunneling,” Encly. Brit., 1889, vol. xxiii., p. 623.

The Roman tunnels were designed for public utility. Among those which
are most notable in this respect, as well as for being fine examples of
tunnel work, may be mentioned the numerous conduits driven through the
calcareous rock between Subiaco and Tivoli to carry to Rome the pure
water from the mountains above Subiaco. This work was done under the
Consul Marcius. The longest of the Roman tunnels is the one built to
drain Lake Fucino, as mentioned above. This tunnel was designed to have
a section of 6 ft. × 10 ft.; but its actual dimensions are not uniform.
It was driven through calcareous rock, and it is stated that 30,000 men
were employed for eleven years in its construction. The tunnels which
have been mentioned, being designed for conduits, were of small section;
but the Romans also built tunnels of larger sections at numerous points
along their magnificent roads. One of the most notable of these is that
which gives the road between Naples and Pozzuoli passage through the
Posilipo hills. It is excavated through volcanic tufa, and is about 3000
ft. long and 25 ft. wide, with a section of the form of a pointed arch.
In order to facilitate the illumination of this tunnel, its floor and
roof were made gradually converging from the ends toward the middle; at
the entrances the section was 75 ft. high, while at the center it was
only 22 ft. high. This double funnel-like construction caused the rays
of light entering the tunnel to concentrate as they approached the
center, and thus to improve the natural illumination. The tunnel is on a
grade. It was probably excavated during the time of Augustus, although
some authorities place its construction at an earlier date.

During the Middle Ages the art of tunnel building was practiced for
military purposes, but seldom for the public need and comfort. Mention
is made of the fact that in 1450 Anne of Lusignan commenced the
construction of a road tunnel under the Col di Tenda in the Piedmontese
Alps to afford better communication between Nice and Genoa; but on
account of its many difficulties the work was never completed, although
it was several times abandoned and resumed. For the most part,
therefore, the tunnel work of the Middle Ages was intended for the
purposes and necessities of war. Every castle had its private
underground passage from the central tower or keep to some distant
concealed place to permit the escape of the family and its retainers in
case of the victory of the enemy, and, during the defense, to allow of
sorties and the entrance of supplies.

The tunnel builders of the Middle Ages added little to the knowledge of
their art. Indeed, until the 17th century and the invention of gunpowder
no practical improvement was made in the tunneling methods of the
Romans. Engravings of mining operations in that century show that
underground excavation was accomplished by the pick or the hammer and
chisel, and that wood fires were lighted at the ends of the headings to
split and soften the rocks in advance. Although gunpowder had been
previously employed in mining, the first important use of it in tunnel
work was at Malpas, France, in 1679-81, in the tunnel for the Languedoc
Canal. This tunnel was 510 ft. long, 22 ft. wide, and 29 ft. high, and
was excavated through tufa. It was left unlined for seven years, and
then was lined with masonry.

With the advent of gunpowder and canal building the first strong impetus
was given to tunnel building, in its modern sense, as a commercial and
public utilitarian construction, since the days of the Roman Empire.
Canal tunnels of notable size were excavated in France and England
during the last half of the 17th century. These were all rock or
hard-ground tunnels. Indeed, previous to 1800 the soft-ground tunnel was
beyond the courage of engineer except in sections of such small size
that the work better deserves to be called a drift or heading than a
tunnel. In 1803, however, a tunnel 24 ft. wide was excavated through
soft soil for the St. Quentin Canal in France. Timbering or strutting
was employed to support the walls and roof of the excavation as fast as
the earth was removed, and the masonry lining was built closely
following it. From the experience gained in this tunnel were developed
the various systems of soft-ground subterranean tunneling since
employed.

It was by the development of the steam railway, however, that the art of
tunneling was to be brought into its present prominence. In 1820-26 two
tunnels were built on the Liverpool & Manchester Ry. in England. This
was the beginning of the rapid development which has made the tunnel one
of the most familiar of engineering structures. The first railway tunnel
in the United States was built on the Alleghany & Portage R. R. in
Pennsylvania in 1831-33; and the first canal tunnel had been completed
about 13 years previously (1818-21) by the Schuylkill Navigation Co.,
near Auburn, Pa. It would be interesting and instructive in many
respects to follow the rise and progress of tunnel construction in
detail since the construction of these earlier examples, but all that
may be said here is that it was identical with that of the railway.

The art of tunneling entered its last and greatest phase with the
construction of the Mont Cenis tunnel in Europe and the Hoosac tunnel in
America, which works established the utility of machine rock-drills and
high explosives. The Mont Cenis tunnel was built to facilitate railway
communication between Italy and France, or more properly between
Piedmont and Savoy, the two parts of the kingdom of Victor Emmanuel II.,
separated by the Alps. It is 7.6 miles long, and passes under the Col di
Fréjus near Mont Cenis. Sommeiller, Grattoni, and Grandis were the
engineers of this great undertaking, which was begun in 1857, and
finished in 1872. It was from the close study of the various
difficulties, the great length of the tunnel, and the desire of the
engineers to finish it quickly, that all the different improvements were
developed which marked this work as a notable step in the advance of the
art of tunneling. Thus the first power-drill ever used in tunnel work
was devised by Sommeiller. In addition, compressed air as a motive power
for drills, aspirators to suck the foul air from the excavation, air
compressors, turbines, etc., found at Mont Cenis their first application
to tunnel construction. This important rôle played by the Mont Cenis
tunnel in Europe in introducing modern methods had its counterpart in
America in the Hoosac tunnel completed in 1875. In this work there were
used for the first time in America power rock-drills, air compressors,
nitro-glycerine, electricity for firing blasts, etc.

There remains now to be noted only the final development in the art of
soft-ground submarine tunneling, namely, the use of the shield and metal
lining. The shield was invented and first used by Sir Isambard Brunel in
excavating the tunnel under the River Thames at London, which was begun
in 1825, and finished in 1841. In 1869 Peter William Barlow used an iron
lining in connection with a shield in driving the second tunnel under
the Thames at London. From these inventions has grown up one of the most
notable systems of tunneling now practiced, which is commonly known as
the shield system.

In closing this brief review of the development of modern methods of
tunneling, to the presentation of which the remainder of this book is
devoted, mention should be made of a form of motive power which promises
many opportunities for development in tunnel construction. Electricity
has long been employed for blasting and illuminating purposes in tunnel
work. It remains to be extended to other uses. For hauling and for
operating certain classes of hoisting and excavating machinery it is one
of the most convenient forms of power available to the engineer. Its
successful application to rock-drills is another promising field. For
operating ventilating fans it promises unusual usefulness.

TUNNELING

CHAPTER I.

PRELIMINARY CONSIDERATIONS. CHOICE BETWEEN A TUNNEL AND OPEN CUT.
GEOLOGICAL SURVEYS.

CHOICE BETWEEN A TUNNEL AND AN OPEN CUT.

When a railway line is to be carried across a range of mountains or
hills, the first question which arises is whether it is better to
construct a tunnel or to make such a détour as will enable the
obstruction to be passed with ordinary surface construction. The answer
to this question depends upon the comparative cost of construction and
maintenance, and upon the relative commercial and structural advantages
and disadvantages of the two methods. In favor of the open road there
are its smaller cost and the decreased time required in its
construction. These mean that less capital will be required, and that
the road will sooner be able to earn something for its builders. Against
the open road there are: its greater length and consequently its heavier
running expenses; the greater amount of rolling-stock required to
operate it; the heavy expense of maintaining a mountain road; and the
necessity of employing larger locomotives, with the increased expenses
which they entail. In favor of the tunnel there are: the shortening of
the road, with the consequent decrease in the operating expenses and
amount of rolling-stock required; the smaller cost of maintenance,
owing to the protection of the track from snow and rain and other
natural influences causing deterioration; and the decreased cost of
hauling due to the lighter grades. Against the tunnel, there are its
enormous cost as compared with an open road and the great length of time
required to construct it.

To determine in any particular case whether a tunnel or an open road is
best, requires a careful integration of all the factors mentioned. It
may be asserted in a general way, however, that the enormous advance
made in the art of tunnel building has done much to lessen the strength
of the principal objections to tunnels, namely, their great cost and the
length of time required for their construction. Where the choice lies
between a tunnel or a long détour with heavy grades it is sooner or
later almost always decided in favor of a tunnel. When, however, the
conditions are such that the choice lies between a tunnel or a heavy
open cut with the same grades the problem of deciding between the two
solutions is a more difficult one.

It is generally assumed that when the cut required will have a vertical
depth exceeding 60 ft. it is less expensive to build a tunnel unless the
excavated material is needed for a nearby embankment or fill. This rule
is not absolute, but varies according to local conditions. For instance,
in materials of rigid and unyielding character, such as rock, the
practical limit to the depth of a cut goes far beyond that point at
which a tunnel would be more economical according to the above rule. In
soils of a yielding character, on the other hand, the very flat slope
required for stability adds greatly to the cost of making a cut.

It may be noted in closing that the same rule may be employed in
determining the location of the ends of the tunnel, for assuming that it
is more convenient to excavate a tunnel than an open cut when the depth
exceeds 60 ft., then the open cut approaches should extend into the
mountain- or hill-sides only to the points where the surface is 60 ft.
above grade, and there the tunnel should begin. If, therefore, we draw
on the longitudinal profile of the tunnel a line parallel to the plane
of the tracks, and 60 ft. above it, this line will cut the surface at
the points where the open-cut approaches should cease and the tunnel
begin. This is a rule-of-thumb determination at the best, and requires
judgment in its use. Should the ground surface, for example, rise only a
few feet above the 60 ft. line for any distance, it is obviously better
to continue the open cut than to tunnel.

THE METHOD AND PURPOSE OF GEOLOGICAL SURVEYS.

When it has been decided to build a tunnel, the first duty of the
engineer is to make an accurate geological survey of the locality. From
this survey the material penetrated, the form of section and kind of
strutting to be used, the best form of lining to be adopted, the cost of
excavation, and various other facts, are to be deduced. In small tunnels
the geological knowledge of the engineer should enable him to construct
a geological map of the locality, or this knowledge may be had in many
cases by consulting the geological maps issued by the State or general
government surveys. When, however, the tunnel is to be of great length,
it may be necessary to call in the assistance of a professional
geologist in order to reconstruct accurately the interior of the
mountain and thereby to ascertain beforehand the different strata and
materials to be excavated, thus obtaining the data for calculating both
the time and cost of excavating the tunnel.

The geological survey should enable the engineer to determine, (1) the
character of the material and its force of cohesion, (2) the inclination
of the different strata, and (3) the presence of water.

=Character of Material.=--The character of the material through which
the proposed tunnel will penetrate is best ascertained by means of
diamond rock-drills. These machines bore an annular hole, and take away
a core for the whole depth of the boring, thus giving a perfect
geological section showing the character, succession, and exact
thickness of the strata. By making such borings at different points
along the center line of the projected tunnel, and comparing the
relative sequence and thickness of the different strata shown by the
cores, the geological formation of the mountain may be determined quite
exactly. Where it is difficult or impracticable to make diamond drill
borings on account of the depth of the mountain above the tunnel, or
because of its inaccessibility, the engineer must resort to other
methods of observation.

The present forms of mountains or hills are due to weathering, or the
action of the destructive atmospheric influences upon the original
material. From the manner in which the mountain or hill has resisted
weathering, therefore, may be deduced in a general way both the nature
and consistency of the materials of which it is composed. Thus we shall
generally find mountains or hills of rounded outlines to consist of soft
rocks or loose soils, while under very steep and crested mountains hard
rock usually exists. To the general knowledge of the nature of its
interior thus afforded by the exterior form of the mountain, the
engineer must add such information as the surface outcroppings and other
local evidences permit.

For the purposes of the tunnel builder we may first classify all
materials as either, (1) hard rock, (2) soft rock, or (3) soft soil.

Hard rocks are those having sufficient cohesion to stand vertically when
cut to any depth. Many of the primary rocks, like granite, gneiss,
feldspar, and basalt, belong to this class, but others of the same group
are affected by the atmosphere, moisture, and frost, which gradually
disintegrate them. They are also often found interspersed with pyrites,
whose well-known tendency to disintegrate upon exposure to air
introduces another destructive agency. For these reasons we may divide
hard rocks into two sub-classes; viz., hard rocks unaffected by the
atmosphere, and those affected by it. This distinction is chiefly
important in tunneling as determining whether or not a lining will be
required.

Soft rocks, as the term implies, are those in which the force of
cohesion is less than in hard rocks, and which in consequence offer less
resistance to attacks tending to break down their original structure.
They are always affected by the atmosphere. Sandstones, laminated clay
shales, mica-schists, and all schistose stones, chalk and some volcanic
rocks, can be classified in this group. Soft rocks require to be
supported by timbering during excavation, and need to be protected by a
strong lining to exclude the air, and to support the vertical pressures,
and prevent the fall of fragments.

Soft soils are composed of detrital materials, having so little cohesion
that they may be excavated without the use of explosives. Tunnels
excavated through these soils must be strongly timbered during
excavation to support the vertical pressure and prevent caving; and they
also always require a strong lining. Gravel, sand, shale, clay,
quicksand, and peat are the soft soils generally encountered in the
excavation of tunnels. Gravels and dry sand are the strongest and
firmest; shales are very firm, but they possess the great defect of
being liable to swell in the presence of water or merely by exposure to
the air, to such an extent that they have been known to crush the
timbering built to support them. Quicksand and peat are proverbially
treacherous materials. Clays are sometimes firm and tenacious, but when
laminated and in the presence of water are among the most treacherous
soils. Laminated clays may be described as ordinary clays altered by
chemical and mechanical agencies, and several modifications of the same
structure are often found in the same locality. They are composed of
laminæ of lenticular form separated by smooth surfaces and easily
detached from each other. Laminated clays generally have a dark color,
red, ocher or greenish blue, and are very often found alternating with
strata of stiatites or calcareous material. For purposes of construction
they have been divided into three varieties.

Laminated clays of the first variety are those which alternate with
calcareous strata and are not so greatly altered as to lose their
original stratification. Laminated clays of the second variety are those
in which the calcareous strata are broken and reduced to small pieces,
but in which the former structure is not completely destroyed; the clay
is not reduced to a humid state. Laminated clays of the third variety
are those in which the clay by the force of continued disturbance, and
in the presence of water, has become plastic. Laminated clays are very
treacherous soils; quicksand and peat may be classed, as regards their
treacherous nature, among the laminated clays of the third variety.

=Inclination of Strata.=--Knowing the inclination of the strata, or the
angle which they make with the horizon, it is easy to determine where
they intersect the vertical plane of the tunnel passing through the
center line, thus giving to a certain extent a knowledge of the
different strata which will be met in the excavation. On the inclination
of the strata depend: (1) The cost of the excavation; the blasting, for
instance, will be more efficient if the rocks are attacked perpendicular
to the stratification; (2) The character of the timbering or strutting;
the tendency of the rock to fall is greater if the strata are horizontal
than if they are vertical; (3) The character and thickness of the
lining; horizontal strata are in the weakest position to resist the
vertical pressure from the load above when deprived of the supporting
rock below, while vertical strata, when penetrated, act as a sort of
arch to support the pressure of the load above. The foregoing remarks
apply only to hard or soft rock materials.

In detrital formations the inclination of the strata is an important
consideration, because of the unsymmetrical pressures developed. In
excavating a tunnel through soft soil whose strata are inclined at 30°
to the horizon, for instance, the tunnel will cut these strata at an
angle of 30°. By the excavation the natural equilibrium of the soil is
disturbed, and while the earth tends to fall and settle on both sides at
an angle depending upon the friction and cohesion of the material, this
angle will be much greater on one side than on the other because of the
inclination of the strata; and hence the prism of falling earth on one
side is greater than on the other, and consequently the pressures are
different, or in other words, they are unsymmetrical. These
unsymmetrical pressures are usually easily taken care of as far as the
lining is concerned, but they may cause serious cave-ins and badly
distort the strutting. Caving-in during excavation may be prevented by
cutting the materials according to their natural slope; but the
distortion of the strutting is a more serious problem to handle, and one
which oftentimes requires the utmost vigilance and care to prevent
serious trouble.

=Presence of Water.=--An idea of the likelihood of finding water in the
tunnel may be obtained by studying the hydrographic basin of the
locality. From it the source and direction of the springs, creeks,
ravines, etc., can be traced, and from the geological map it can be seen
where the strata bearing these waters meet the center line. Not only
ought the surface water to be attentively studied, but underground
springs, which are frequently encountered in the excavation of tunnels,
require careful attention. Both the surface and underground waters
follow the pervious strata, and are diverted by impervious strata. Rocks
generally may be classed as impervious; but they contain crevices and
faults, which often allow water to pass through them; and it is,
therefore, not uncommon to encounter large quantities of water in
excavating tunnels through rock. As a rule, water will be found under
high mountains, which comes from the melted ice and snow percolating
through the rock crevices.

Some detrital soils, like gravel and sand, are pervious, and others,
like clay and shale, are impervious. Detrital soils lying above clay are
almost certain to carry water just above the clay stratum. In tunnel
work, therefore, when the excavation keeps well within the clay stratum,
little trouble is likely to be had from water; should, however, the
excavation cut the clay surface and enter the pervious material above,
water is quite certain to be encountered. The quantity of water
encountered in any case depends upon the presence of high mountains near
by, and upon other circumstances which will attract the attention of the
engineer.

A knowledge of the pressure of the water is desirable. This may be
obtained by observing closely its source and the character of the strata
through which it passes. Water coming to the excavation through rock
crevices will lose little of its pressure by friction, while that which
has passed some distance through sand will have lost a great deal of its
pressure by friction. Water bearing sand, and, in fact, any water
bearing detrital material, has its fluidity increased by water pressure;
and when this reaches the point where flow results, trouble ensues. The
streams of water met in the construction of the St. Gothard tunnel had
sufficient pressure to carry away timber and materials.

CHAPTER II.

METHODS OF DETERMINING THE CENTER LINE AND FORMS AND DIMENSIONS OF
CROSS-SECTION.

DETERMINING THE CENTER LINE.

Tunnels may be either curvilinear or rectilinear, but the latter form is
the more common. In either case the first task of the engineer, after
the ends of the tunnel have been definitely fixed, is to locate the
center line exactly. This is done on the surface of the ground; and its
purpose is to find the exact length of the tunnel, and to furnish a
reference line by which the excavation is directed.

=Rectilinear Tunnels.=--In short tunnels the center line may be
accurately enough located for all practical purposes by means of a
common theodolite. The work is performed on a calm, clear day, so as to
have the instrument and observations subjected to as little atmospheric
disturbance as possible. Wooden stakes are employed to mark the various
located points of the center line temporarily. The observations are
usually repeated once at least to check the errors, and the stakes are
altered as the corrections dictate; and after the line is finally
decided to be correctly fixed, they are replaced by permanent monuments
of stone accurately marked. The method of checking the observations is
described by Mr. W. D. Haskoll[2] as follows:

“Let the theodolite be carefully set up over one of the stakes, with
the nail driven into it, selecting one that will command the best
position so as to range backwards and forwards over the whole length
of line, and also obtain a view of the two distant points that range
with the center line; this being done, let the centers of every stake
... be carefully verified. If this be carefully done, and the centers
be found correct, and thoroughly in one visual line as seen through
the telescope, there will be no fear but that a perfectly straight
line has been obtained.”

[2] “Practical Tunneling,” by F. W. Simms.

[Illustration: FIG. 1.--Diagram Showing Manner of Lining in Rectilinear
Tunnels.]

The center line which has thus been located on the ground surface has to
be transposed to the inside of the tunnel to direct the excavation. To
do this let _A_ and _B_ be the entrances and _a_ and _b_ be the two
distinct fixed points which have been ranged in with the center line
located on the ground surface over the hill _A f B_, Fig. 1. The
instrument is set up at _V_, any point on the line _A a_ produced, and a
bearing secured by observation on the center line marked on the surface.
This bearing is then carried into the tunnel by plunging the telescope,
and setting pegs in the roof of the heading. Lamps hung from these pegs
furnish the necessary sighting points. This same operation is repeated
on the opposite side of the hill to direct the excavation from that end
of the tunnel. These operations serve to locate only the first few
points inside the tunnel. As the excavation penetrates farther into the
hill, it becomes impossible to continue to locate the line from the
outside point, and the line has to be run from the points marked on the
roof of the heading. Great accuracy is required in all these
observations, since a very small error at the beginning becomes greater
and greater as the excavation advances. To facilitate the accurate
location of points on the roof of the tunnel, a simple device was
designed by Mr. Beverley R. Value, shown in Fig. 2. Two iron spikes,
each having a small hole in the flat end, are driven into the rock about
9 ins. apart. A brass bar, 1 in. high, ¹⁄₄ in. thick and 10 ins. long,
having a hole near one end and a 1 in. slot at the other, is screwed
tightly into the head of the spikes. The middle part of the bar is
divided into inches and tenths of an inch. A separate brass hanger is
fitted to the bar, having a vernier with its zero at the middle of the
hanger and corresponding to a plumb line attached below. The hanger is
moved back and forth until it coincides with the line of sight of the
transit, and then the readings of the vernier are recorded. Any time
that the hanger is placed on the bar and the vernier marks the same
reading, the plumb line will indicate the center line of the tunnel.
When, instead of one bar, two are inserted at a distance of 20 or 30 ft.
apart, the plumb lines suspended from the hangers will represent the
vertical plane passing through the axis of the tunnel in coincidence
with the one staked out on the surface ground.

[Illustration: FIG. 2.--B. R. Value’s Device for Locating the Center
Line Inside of a Tunnel.]

The location of the center line of a long tunnel, which is to be
excavated under high mountains, is a very difficult operation, and the
engineers usually leave this part of the work to astronomers, who fix
the stations from which the engineers direct the work of construction.
The center lines of all the great Alpine tunnels were located by
astronomers who used instruments of large size. Thus, in ranging the
center line of the St. Gothard tunnel, the theodolite used had an object
glass eight inches in diameter.[3] Instead of the ordinary mounting a
masonry pedestal with a perfectly level top is employed to support the
instrument during the observations. The location is made by means of
triangulation. The various operations must be performed with the
greatest accuracy, and repeated several times in such a way as to reduce
the errors to a minimum, since the final meeting of the headings
depends upon their elimination.

[3] See also the Simplon Tunnel, Chapter X.

[Illustration: FIG. 3.--Triangulation System for Establishing the Center
Line of the St. Gothard Tunnel.]

The St. Gothard tunnel furnishes perhaps the best illustration of
careful work in locating the center line of long rectilinear tunnels of
any tunnel ever built. The length of this tunnel is 9.25 miles, and the
height of the mountain above it is very great. The center line was
located by triangulation by two different astronomers using different
sets of triangles, and working at different times. The set or system of
triangles used by Dr. Koppe, one of the observers, is shown by Fig. 3;
it consists of very large and quite small triangles combined, the latter
being required because the entrances both at Airolo and Goeschenen were
so low as to permit only of a short sight being taken. The apices of the
triangles were located by means of the contour maps of the Swiss Alpine
Club. Each angle was read ten times, the instrument was collimated four
times for each reading, and was afterwards turned off 5° or 10° to avoid
errors of graduation. The average of the errors in reading was about one
second of arc. The triangulation was compensated according to the method
of least squares. The probable error in the fixed direction was
calculated to be 0.8″ of arc at Goeschenen and 0.7″ of arc at Airolo.
From this it was assumed that the probable deviation from the true
center would be about two inches at the middle of the tunnel, but when
the headings finally met this deviation was found to reach eleven
inches.

Comparatively few tunnels are driven by working from the entrances
alone, the excavation being usually prosecuted at several points at once
by means of shafts. In these cases, in order to direct the excavation
correctly, it is necessary to fix the center line on the bottom of the
shaft. This is accomplished in two ways,--one being employed when the
shaft is located directly over the center line, and the other when the
shaft is located to one side of the center line.

When the shaft is located on the center line two small pillars are
placed on opposite edges of the shaft and collimating with the center
line as shown by Fig. 4. On these two pillars the points corresponding
to the center line are correctly marked, and connected by a wire
stretched between them. To this wire two plumb bobs are fastened as far
apart as possible. These plumb bobs mark two points on the center line
at the bottom of the shaft, and from them the line is extended into the
headings as the work advances. In these operations, heavy plumb bobs are
used. In the New York subway plumb bobs of steel, weighing 25 lbs. each,
were used, and to prevent rotation they were made with cross-sections,
in the shape of a Greek cross, and were sunk in buckets filled with
water. Owing to the difference between the temperature at the top and
that at the bottom of the shaft, strong currents of air are produced,
which keep in constant oscillation the wires to which the bobs are
suspended.

[Illustration: FIG. 4.--Method of Transferring the Center Line down
Center Shafts.]

To determine the center line at the bottom of the shaft, the headings
are first driven from both sides of the shaft, after which a transit is
set up on the same alignment with the two wires, and this will indicate
the vertical plane passing through the axis of construction. Two points
are then fixed on the roof of the tunnel in continuation of this
vertical plane. When the plumb bobs are removed from the shaft and two
small plumb bobs are suspended to the two points mentioned, they will
always give the same vertical plane passing through the axis of
construction transferred from the surface.

Because of the continuous moving of the wires, the fixing of the points
on the roof of the tunnel is very troublesome, and the operation should
be repeated by different men at different times before the points are
permanently fixed.

[Illustration: FIG. 5.--Method of Transferring the Center Line down Side
Shafts.]

When the shaft is placed at one side of the tunnel the pillars or bench
marks are placed normal to the center line on the edges of the shaft as
shown by Fig. 5. Between the points _A_ and _B_ a wire is stretched, and
from it two plumb bobs are suspended, as described in the preceding
case; these plumb bobs establish a vertical plane normal to the axis of
the tunnel. The excavation of the side tunnel is carried along the line
_BW_ until it intersects the line of the main tunnel, whose center line
is determined by measuring off underground a distance equal to the
distance _BO_ on the surface. By setting the instrument over the
underground point _O_, and turning off a right angle from the line _BO_,
the center line of the tunnel is extended into the headings.

=Curvilinear Tunnels.=--There are various methods of locating the center
lines of curvilinear tunnels, but the method of tangent offsets is the
one most commonly employed.

At the beginning the excavation is conducted as closely as may be to
the line of the curve, and as soon as it has progressed far enough the
tangent _AT_, Fig. 6, is ranged out. At _B_ a point is located over
which to set the instrument, and the distance _AB_ is measured for the
purpose of finding the ordinate of the right angle triangle _OAB_. Now
_OA_ = _r_, _AB_ = _d_, and φ = angle _ABO_. Then:

_r_
Tang. φ = ---.
_d_

[Illustration: FIG. 6.--Method of Laying Out the Center Line of
Curvilinear Tunnels.]

Doubling the value of φ and making the angle _ABC_ = 2 φ, the line _BC_
will be fixed and the point _C_ located by taking _AB_ = _BC_. On _BC_
the ordinates are laid off to locate the curve. Prolong _CB_ so that
_CD_ = _CB_. Then the portion of the curve _CF_ is symmetrical with
_CE_, and the ordinates used to locate _EC_ may be employed to locate
_CF_, by laying them off in the reverse order.

In curvilinear tunnels several cases may be considered.

(1) When the tunnel for almost its entire length is driven on a tangent
with a curve at each end.

(2) When the tunnel begins with a curve and ends with a straight line.

(3) When the whole tunnel is in curve from portal to portal.

(4) The helicoidal or corkscrew tunnel.

* * * * *

(1) The axis of every one of the great Alpine tunnels is a straight
line, with a curve at each end. To range out the center line of one of
these long tunnels from a curve, no matter how accurately laid out, will
certainly cause an error, which, magnified with the distance, may
produce serious results. To avoid these inconveniences, the
determination of the axis of the tunnel should be made from a straight
line. This means that the tunnel is at first excavated on a straight
line for its entire length and after the headings driven from both
portals have met, the two portions of the tunnel or curve are excavated
and constructed. The portions of the tunnel excavated on straight lines
for conveniences of construction may then be abandoned or used in cases
of accidents or repairs.

When the axis of a short tunnel has a curve at each end and a straight
line in the middle, it is driven directly from the entrances; first,
however, excavating the curvilinear portions of the tunnel. In such a
case it would be advisable to proceed in the following manner. Drive the
headings on the curvilinear portions of the tunnel, staking out the
center line by means of the offsets from the tangents. At the ends of
the curves lay out from both fronts the rectilineal portion of the
tunnel. Only very narrow headings should be excavated at first while the
whole section could be enlarged near the entrances. The excavation of
the headings at the front should advance very rapidly, in order that the
headings may meet in the shortest possible time. When communication is
established, it is comparatively easy to correct an error resulting from
driving the tunnel from the curves.

(2) When a tunnel begins with a curve and ends with a straight line, the
work of excavation should proceed from both ends. From the straight end
of the tunnel only the heading should be driven, while from the
curvilinear end the whole section could be opened at once. By this
arrangement the excavation progresses slowly from the curvilinear end
and rapidly from the straight end of the tunnel. Once communication has
been established and any error corrected, the work of enlarging the
profile of the tunnel may be pushed with the same activity from both
ends.

(3) When the center line of the entire tunnel is a curve, there is more
probability of slight deviations from the true axis of the proposed
work. In such a case it would be advisable to first excavate a narrow
heading and to concentrate all the efforts in driving the headings as
rapidly as possible in order that they may meet in the shortest time.
The center line of these headings is staked out by the usual method of
the offsets from the tangent. The enlarging of the section of the tunnel
could be commenced at both portals and be driven slowly until the
headings have met and any errors corrected, when the work could be
pushed with the greatest activity all along the line.

(4) In corkscrew or helicoidal tunnels the entire center line is on a
curve. In these tunnels, as a rule, there is a great difference of level
between the two portals, one being much higher than the other, so
careful attention should be paid to the tunnel grade. Working in the
limited spaces afforded by narrow headings it is very probable that
errors may be made in fixing both the alignment and the grade of the
tunnel. To prevent these almost unavoidable errors, it would be well to
excavate at first only the headings, to stake the center line in the
roof of these headings and then to lay the grade of the tunnel as
accurately as possible. The work on the headings should be pushed as
rapidly as possible in order that they may meet quickly, so that the
center line, as temporarily laid out, may be corrected and permanently
fixed for the direction of successive operations. In these tunnels the
headings should be excavated near the center of the tunnel cross-section
so that the sides and roof of the heading would be at some distance from
the sides and roof of the proposed tunnel. This arrangement will easily
permit corrections to be made in case any slight difference from the
true line was erroneously made during the excavation of the headings.

FORM AND DIMENSIONS OF CROSS-SECTION.

In deciding upon the sectional profile of a tunnel two factors have to
be taken into consideration: (1) The form of section best suited to the
conditions, and (2) the interior dimensions of this section.

=Form of Section.=--The form of the sectional profile of a tunnel should
be such that the lining is of the best form to resist the pressures
exerted by the unsupported walls of the tunnel excavation, and these
vary with the character of the material penetrated. These pressures are
both vertical and lateral in direction; the roof, deprived of support by
the excavation, tends to fall, and the opposite sides for the same
reason tend to slide inward along a plane more or less inclined,
depending upon the friction and cohesion of the material. In some rocks
the cohesion is so great that they will stand vertically, while it may
be very small in loose earth which slides along a plane whose
inclination is directly proportional to the cohesion.

From the theory of resistance of profiles we know that the resistance of
a line to exterior normal forces is directly proportional to its degree
of curvature, and consequently inversely proportional to the radius of
the curve. Hence the sectional profile of a tunnel excavated through
hard rock, where there are no lateral pressures owing to the great
cohesion of the material, and having to resist only the vertical
pressure, should be designed to offer the greatest resistance at its
highest point, and the curve must, therefore, be sharper there, and may
decrease toward the base. In quicksand, mud, or other material
practically without cohesion, the pressures will all be normal to the
line of the profile, and a circular section is the one best suited to
resist them. These theoretical considerations have been proved correct
by actual experience, and they may be employed to determine in a general
way the form of section to be adopted. Applying them to very hard rock,
they give us a section with an arched roof and vertical side walls. In
softer materials they give us an elliptical section with its major axis
vertical, and in very soft quicksands and mud they give us the circular
section. These three forms of cross-section and their modifications are
the ones commonly employed for tunnels. An important exception to this
general practice, however, is met with in some of the city underground
rapid-transit railways built of late years, where a rectangular or box
section is employed. These tunnels are usually of small depth, so that
the vertical pressures are comparatively light, and the bending strains,
which they exert upon the flat roof, are provided for by employing steel
girders to form the roof lining.

[Illustration: FIG. 7.--Diagram of Polycentric Sectional Profile.]

From what has been said it will be seen that it is impossible to
establish a standard sectional profile to suit all conditions. The best
one for the majority of conditions, and the one most commonly employed,
is a polycentric figure in which the number of centers and the length of
the radii are fixed by the engineer to meet the particular conditions
which exist. In a general way this form of center may be considered as
composed of two parts symmetrical in respect to the vertical axis. Fig.
7 shows such a profile, in which _DH_ is the vertical axis. The section
is unsymmetrical in respect to the horizontal axis _GE_. The upper part
forming the roof arch is usually a semi-circle or semi-oval, while the
lower part, comprising the side walls and invert of floor, varies
greatly in outline. Sometimes the side walls are vertical and the invert
is omitted, as shown by Fig. 8; and sometimes the side walls are
inclined, with their bottoms braced apart by the invert, as shown by
Fig. 9. In more treacherous soils the side walls are curved, and are
connected by small curved sections to the invert, as shown by Fig. 10.
In the last example the side walls are commonly called skewbacks, and
the lower part of the section is a polycentric figure like the upper
part, but dissimilar in form.

In a tunnel section whose profile is composed entirely of arcs the
following conditions are essential: The centers of the springer arcs
_Ga_ and _Ea′_, Fig. 7, must be located on the line _GE_; the center of
the roof arc _bDb′_ must be located on the axis _HD_; the total number
of centers must be an odd number; the radii of the succeeding arcs from
_G_ toward _D_ and _E_ toward _D_ must decrease in length, and finally
the sum of the angles subtended by the several arcs must equal 180°.

[Illustration:

~Fig. 8~

~Fig. 9~

~Fig. 10~

FIGS. 8 to 10.--Typical Sectional Profiles for Tunnel.]

=Dimensions of Section.=--The dimensions to be given to the
cross-section of a tunnel depend upon the purpose for which it is to be
used. Whatever the purpose of the tunnel, the following three points
have to be considered in determining the size of its cross-section: (1)
The size of clear opening required; (2) the thickness of lining masonry
necessary; and (3) the decrease in the clear opening from the
deformation of the lining.

Railway tunnels may be built either to accommodate one or two, three and
four tracks. In single-track tunnels a clear space of at least 2¹⁄₂ ft.
on each side should be allowed for between the tunnel wall and the side
of the largest standard locomotive or car, and a clear space of at least
3 ft. should be allowed for between the roof and the top of the same
locomotive or car. Since the roof of the tunnel is arch-shaped, to
secure a clearance of 3 ft. at every point will necessitate making the
clearance at the center greater than this amount. In double-track
tunnels the same amounts of side and roof clearances have to be provided
for, and, in addition, there has to be a clearance of at least 2 ft.
between trains. On the three- and four-track tunnels only the width
varies while the height remains almost equal to the two track. Referring
to Fig. 7, and assuming the line _AB_ to represent the level of the
tracks, then the ordinary dimensions in feet required for both single-
and double-track tunnels are as follows:--

+--------------+--------+----------+----------+---------------+
| | HEIGHT, | WIDTH, | HEIGHT, | HEIGHT, |
| | D. F. | G. E. | C. F. | C. H. |
| | FEET. | FEET. | FEET. | FEET. |
+------------+----------+----------+----------+---------------+
|Single track|17.6 to 18|16.5 to 18|6 to 7.4|¹⁄₄ to ¹⁄₈ _AB_|
|Double track|26.6 to 28|26.6 to 28|6.3 to 6.9|¹⁄₄ to ¹⁄₈ _AB_|
+------------+----------+----------+----------+---------------+

The dimensions of tunnels built for aqueduct purposes are determined so
as to have an area of cross-section equal to the required waterway. In
the Croton Aqueduct two different types of cross-sections were used, the
circular one for tunnels through rock and the horseshoe section for
tunnels through loose materials. In the Catskill aqueduct three
different cross-sections have been selected, the circular one for
tunnels under pressure and the horseshoe for tunnels at the hydraulic
gradient. These, however, through rock have a cross-section formed of a
semi-circular arch and vertical side walls, while through earth the
semi-circular arch is supported by skewback walls.

In tunnels built for railroad aqueduct sewer and any other purpose the
thickness of the masonry lining to be allowed for varies with the
material penetrated, as will be explained in a succeeding chapter where
the dimensions for various ordinary conditions are given in tabular
form. The lining masonry is subject to deformation in three ways: by the
sinking of the whole masonry structure, by the squeezing together of the
side walls by the lateral pressures, and by the settling of the
roof-arch. The whole masonry structure never sinks more than three or
four inches, and merits little attention. The movement of the side walls
towards each other, which may amount to three or four inches for each
wall without endangering their stability, has, however, to be allowed
for; and similar allowance must be made for the settling of the
roof-arch, which may amount to from nine inches to two feet, when the
arch is built first as in the Belgian system and rests for some time
upon the loose soil.

CHAPTER III.

EXCAVATING MACHINES AND ROCK DRILLS: EXPLOSIVES AND BLASTING.

=Earth-Excavating Machines.=--Comparatively few of the labor-saving
machines employed for breaking up and removing loose soil in ordinary
surface excavation are used in tunnel excavation through the same
material. Several forms of tunnel excavating machines have been tried at
various times, but only a few of them have attained any measure of
success, and these have seldom been employed in more than a single work.
In the Central London underground railway work through clay a continuous
bucket excavator (Fig. 11) was employed with considerable saving in time
and labor over hand work. In some recent tunnel work in America the
contractors made quite successful use of a modified form of steam
shovel. These are the most recent attempts to use excavating machines in
soft ground, and they, like all previous attempts, must be classed as
experiments rather than as examples of common practice. The Thomson
machine,[4] however, can be employed in any tunnel driven through loose
soil. It occupies a comparatively small space and may easily work when
the timbering is used to support the roof of the tunnel. Steam shovel
instead may give efficient result only in the case that the whole
section of the tunnel is open at once and there are no timbers to
prevent the free swinging of the dipper handle and boom. But in tunnels
through loose soils it is almost impossible to open the whole section at
once without the necessity of supporting the roof. Consequently the use
of steam shovel in loose tunnels is very limited. The shovel, the spade,
and the pick, wielded by hand, are the standard tools now, as in the
past, for excavating soft-ground tunnels.

[4] The machine was designed by Mr. Thomas Thomson, Engineer for
Messrs. Walter Scott & Co.

[Illustration: FIG. 11.--Soft Ground Bucket Excavating Machine: Central
London Underground Railway.]

=Rock-Excavating Machines.=--At one period during the work of
constructing the Hoosac tunnel considerable attention was devoted to the
development of a rock excavating, boring, or tunneling machine. This
device was designed to cut a groove around the circumference of the
tunnel thirteen inches wide and twenty-four feet in diameter by means of
revolving cutters. It proved a failure, as did one of smaller size,
eight feet in diameter, tried subsequently. During and before the Hoosac
tunnel work a number of boring-machines of similar character were
experimented with at the Mont Cenis tunnel and elsewhere in Europe; but,
like the American devices, they were finally abandoned as impracticable.

=Hand Drills.=--Briefly described, a drill is a bar of steel having a
chisel-shaped end or cutting-edge. The simplest form of hand drill is
worked by one man, who holds the drill in one hand, and drives it with a
hammer wielded by his other hand. A more efficient method of hand-drill
work is, however, where one man holds the drill, and another swings the
hammer or sledge. Another form of hand drill, called a churn drill,
consists of a long, heavy bar of steel, which is alternately raised and
dropped by the workman, thus cutting a hole by repeated impacts.

In drilling by hand the workman holding the drill gives it a partial
turn on its axis at every stroke in order to prevent wedging and to
offer a fresh surface to the cutting-edge. For the same reason the chips
and dust which accumulate in the drill-hole are frequently removed. The
instruments used for this purpose are called scrapers or dippers, and
are usually very simple in construction. A common form is a strong wire
having its end bent at right angles, and flattened so as to make a sort
of scoop by which the drillings may be scraped or hoisted out of the
hole. It is generally advantageous to pour water into the drill-hole
while drilling to keep the drill from heating.

=Power Drills.=--When the conditions are such that use can be made of
them, it is nearly always preferable to use power drills, on account of
their greater speed of penetration and greater economy of work. Power
drills are worked by direct steam pressure, or by compressed air
generated by steam or water power, and stored in receivers from which it
is led to the drills through iron pipes. A great variety of forms of
power drills are available for tunnel work in rock, but they can nearly
all be grouped in one of two classes: (1) Percussion drills, and (2)
Rotary drills.

_Percussion Drills._--The first American percussion drill was patented
by Mr. J. J. Couch of Philadelphia, Penn., in March, 1849. In May of the
same year, Mr. Joseph W. Fowle, who had assisted Mr. Couch in developing
his drill, patented a percussion drill of his own invention. The Fowle
drill was taken up and improved by Mr. Charles Burleigh, and was first
used on the Hoosac tunnel. In Europe Mr. Cavé patented a percussion
drill in France in October, 1851. This invention was soon followed by
several others; but it was not until Sommeiller’s drill, patented in
1857 and perfected in 1861, was used on the Mont Cenis tunnel, that the
problem of the percussion drill was practically solved abroad. Since
this time numerous percussion drill patents have been taken out in both
America and Europe.

A percussion drill consists of a cylinder, in which works a piston
carrying a long piston rod, and which is supported in such a manner that
the drill clamped to the end of the piston rod alternately strikes and
is withdrawn from the rock as the piston reciprocates back and forth in
the cylinder. Means are devised by which the piston rod and drill turn
slightly on their axis after each stroke, and also by which the drill is
fed forward or advanced as the depth of the drill-hole increases. The
drills of this type which are in most common use in America are the
Ingersoll-Sergeant and the Rand. There are various other makes in common
use, however, which differ from the two named and from each other
chiefly in the methods by which the valve is operated. All of these
drills work either with direct steam pressure or with compressed air.
Workable percussion drills operated by electricity are built, but so far
they do not seem to have been able to compete commercially with the
older forms. No attempt will be made here to make a selection between
the various forms of percussion drills for tunnel work, and for the
differences in construction and the merits claimed for each the reader
is referred to the makers of these machines. All of the leading makes
will give efficient service. It goes almost without saying that a good
percussion drill should operate with little waste of pressure, and
should be composed of but few parts, which can be easily removed and
changed.

_Drill Mountings._--For tunnel work the general European practice is to
mount power drills upon a carriage moving on tracks in order that they
be easily withdrawn during the firing of blasts. Connection is made with
the steam or compressed air pipes by means of flexible hose which can
easily be attached or detached as the drill advances or when it is moved
for repairs or during blasts. Two, four, and sometimes more drills are
mounted and work simultaneously on a single carriage. In America it has
been found that column mountings have been more successful for tunnel
work than any other form. The column mounting made by the
Ingersoll-Sergeant Drill Co. is shown in Fig. 12. In using this form of
mounting no tracks or other special apparatus is required; it is not
necessary, as is the case with the carriage mounting, to remove the
débris before resuming operations, but as soon as the blasting has been
finished and the smoke has sufficiently disappeared the column can be
set up and drilling resumed.

[Illustration: FIG. 12.--Column Mounting for Percussion Drill:
Ingersoll-Sergeant Drill Co.]

_Rotary Drills._--Rotary drilling machines, or more simply rotary
drills, were first used in 1857 in the Mont Cenis tunnel. The advantages
claimed for rotary drills in comparison with percussion drills are: (1)
That less power is required to drive the drill, and the power is better
utilized; (2) once the machines work easily they do not require
continual repairs, and (3) in driving holes of large size the interior
nucleus is taken away intact, thus reducing work and increasing the
speed of drilling. Rotary drills are extensively used for geological,
mining, well-driving, and prospecting purposes; but they are very seldom
employed in tunnels in America, although successfully used for this
purpose in Europe. The reason they have not gained more favor among
American tunnel builders is due to some extent perhaps to prejudice, but
chiefly to the great cost of the machine as compared with percussion
drills, and to the expense of diamonds for repairs. Those who advocate
these machines for tunnel work point out, however, that under ordinary
usage the diamonds have a very long life,--borings of 700 lin. ft. being
recorded without repairs to the diamonds.

[Illustration: FIG. 13.--Sketch of Diamond Drill Bit.]

The form of rotary drill used chiefly for prospecting purposes is the
diamond drill. This machine consists of a hollow cylindrical bit having
a cutting-edge of diamonds, which is revolved at the rate of from two
hundred to four hundred revolutions per minute by suitable machinery
operated by steam or compressed air. The diamonds are set in the
cutting-edge of the bit so as to project outward from its annular face
and also slightly inside and outside of its cylindrical sides (Fig. 13).
When the drill rod with the bit attached is rotated and fed forward the
bit cuts an annular hole into the rock; the drillings being removed from
the hole by a constant stream of water which is forced down through the
hollow drill rod and emerges, carrying the débris with it, up through
the narrow space between the outside of the bit and the walls of the
hole. There are various makes of diamond drills, but they all operate in
essentially the same manner.

The rotary drill principally employed in Europe in tunneling is the
Brandt. The cutting-edge of the Brandt drill consists of hardened steel
teeth. The bit is pressed against the rock by hydraulic pressure, and
usually makes from seven to eight revolutions per minute. Some of the
water when freed goes through the hollow bit, keeping it cool, and
cleaning the hole of débris. A water pressure of from 300 to 450 lbs.
per square inch is required to operate these drills. Rotary rock-drills
may be mounted either on carriages or on columns for tunnel work.
Several machines have recently been constructed for the purpose of
breaking the rock in tunnels without blasting, but they did not meet the
approval of tunnel engineers. One of these machines is provided with
numerous electric torches, which are applied to the rock at the front.
By suddenly chilling the rock with a stream of cold water the stone will
crumble away. Another machine was tested, with little success, in the
excavation for the New Grand Central Depot in New York. On the face of
this machine there is a multitude of chipping drills revolving on four
arms and driven by air pressure. They attack the rock and chip it into
fragments, which are carried away by an endless band.

EXPLOSIVES AND BLASTING.

When the holes are once drilled, either by hand or power drills, they
are charged with explosives. The principal explosives employed in
tunneling are gunpowder, nitroglycerine, and dynamite.

=Gunpowder.=--Gunpowder is composed of charcoal, sulphur, and saltpeter
in proportions varying according to the quality of the powder. For
mining purposes the composition employed is 65% saltpeter, 15% sulphur,
and 20% charcoal. It is a black granulated powder having a specific
gravity of 1.5; the black color is given by the charcoal; and the
grains have an angular form, and vary in size from ¹⁄₈ in. to ³⁄₈ in.
Good blasting powder should contain no fine grains, which may be
detected by pouring some of the powder upon a sheet of white paper. The
force developed by the explosion of gunpowder is not accurately known;
it depends upon the space in which it is confined. Different authorities
estimate the pressure at from 15,000 lbs. per sq. in. in loose blasts to
200,000 lbs. per sq. in. in gunnery. Authorities also differ in opinion
as to the character of the gases developed by the explosion of
gunpowder, a matter of vital concern to the tunnel engineer, since they
are likely to affect the health and comfort of his workmen. It may be
assumed in a general way, however, that the oxygen of the saltpeter
converts nearly all of the carbon of the charcoal into carbon dioxide, a
portion of which combines with the potash of the saltpeter to form
carbonate of potash, the remainder continuing in the form of gas. The
sulphur is converted into sulphuric acid, and forms a sulphate of
potash, which by reaction is decomposed into hyposulphite and sulphide.
The nitrogen of the saltpeter is almost entirely evolved in a free
state; and the carbon not having been wholly burnt into carbonic acid,
there is a proportion of carbonic oxide.

=Nitroglycerine.=--Nitroglycerine is one of the modern explosives used
as a substitute for gunpowder. It is a fluid produced by mixing
glycerine with nitric and sulphuric acids; it freezes at +41° F., and
burns very quietly, developing carbonic acid, nitrogen, oxygen, and
water. By percussion or by the explosion of some substances, such as
capsules of gunpowder or fulminate of mercury, nitroglycerine produces a
sudden explosion in which about 1250 volumes of gases are produced. The
pressure of these gases has been calculated at 26,000 atmospheres, or
324,000 lbs. per sq. in. Nitroglycerine explodes very easily by
percussion in its normal state, but with great difficulty when frozen;
hence, in America, at the beginning of its use, it was transported only
in a frozen state. When dirty, nitroglycerine undergoes a spontaneous
decomposition accompanied by the development of gases and the evolution
of heat, which, reaching 388° F., causes it to explode. Notwithstanding
the enormous pressures which nitroglycerine develops, it is very seldom
used in its liquid state, but is mixed with a granular absorbent earth
composed of the shells of diatoms. The fluid undergoes no chemical
change by being absorbed, and explodes, freezes, and burns under the
same conditions as in the fluid state.

=Dynamite.=--The credit of rendering nitroglycerine available for the
purposes of the engineer by mixing it with a granular absorbent is due
to Albert Nobel of Stockholm, Sweden, who named the new material
dynamite. The nitroglycerine in dynamite loses very little of its
original explosive power, but is very much less easily exploded by
percussion, and can be employed in horizontal as well as vertical holes,
which was, of course, not possible in its liquid state. Dynamite must
contain at least 50% of nitroglycerine. Some manufacturers, instead of
using diatomaceous earth, use other absorbents which develop gases upon
explosion and increase the force of the explosion. These mixtures are
classed under the general name of false dynamites. A great many
varieties of dynamite are manufactured, and each manufacturer usually
makes a number of grades to which he gives special names. Dynamite for
railway work, tunneling, and mining contains about 50% of
nitroglycerine; for quarrying about 35%, and for blasting soft rocks
about 30%. It is sold in cylindrical cartridges covered with paper.

=Storage of Explosives.=--In driving tunnels through rock large
quantities of explosives must be used, and it is necessary to have some
safe place for storing them. In many States there are special laws
governing the transportation and storage of explosives; where there is
no regulation by law the engineer should take suitable precautions of
his own devising. It is best to build a special house or hut in one of
the most concealed portions of the work and away from the tunnel, and
protect it with a lightning-rod and from fire. Strict orders should be
given to the watchman in charge not to allow persons inside with lamps
or fire in any form, and smoking should be prohibited. The use of
hammers for opening the boxes should be prohibited; and dynamite,
gunpowder, and fulminate of mercury should not be stored together in the
same room. A quantity of dynamite for two or three days’ consumption may
be stored near the entrance of the tunnel in a locked box, the keys of
which are kept by the foreman of the work. When dynamite has been frozen
the engineer should provide some arrangement by which it may be heated
to a temperature not exceeding 120° F., and absolutely forbid it being
thawed out on a stove or by an open fire.

=Fuses.=--When gunpowder is used in tunneling it is ignited by the
Blickford match. This match, or fuse as it is more commonly called,
consists of a small rope of yarn or cotton having as a core a small
continuous thread of fine gunpowder. To protect the outside of the fuse
from moisture it is coated with tar or some other impervious substance.
These fuses are so well made that they burn very uniformly at the rate
of about 1 ft. in 20 seconds, hence the moment of explosion can be
pretty accurately fixed beforehand. Blickford matches have the objection
for tunnel work of burning with a bad odor, especially when they are
coated with tar, and to remedy this many others have been invented.
Those of Rzika and Franzl are the best known of these. The former has
many advantages, but it burns too quickly, about 3 ft. per second, and
is expensive; the latter consists of a small hollow rope filled with
dynamite.

Blickford matches cannot be used to explode dynamite, the use of a
cartridge being required. These cartridges are small copper cylinders
containing fulminate of mercury. They may be attached to the end of the
Blickford match, which being ignited the spark travels along its length
until it reaches the copper cylinder, where it explodes the fulminate of
mercury, which in turn explodes the dynamite. Blasts may also be fired
by electricity, which, in fact, is the most common and the preferable
method, because several blasts can be fired simultaneously, and because
the current is turned on at a great distance, thus affording greater
safety to the workmen.

The method of electric firing generally employed in America is known as
the connecting series method, and consists in firing several mines
simultaneously. The ends of the wires are scraped bare, and the wire of
the first hole of the series is twisted together with the wire of the
second hole, and so on; finally the two odd wires of the first and last
holes are connected to two wires of a single cable or to two separate
cables extending to some safe place to which the men can retreat. Here
the two cable wires are connected by binding screws to the poles of a
battery, or sometimes to a frictional electric machine. The current
passes through the wires, making a spark at each break, and so fires the
fulminate of mercury, which explodes the dynamite.

Simultaneous firing by electricity by utilizing the united strength of
the blasts at the same instant secures about 10% greater efficiency from
the explosives. Another advantage of electric firing is that in case of
a missfire of any one of the holes there is slight possibility of
explosion afterwards, and the place can be approached at once to
discover the cause.

=Tamping.=--Tamping is the material placed in the hole above the
explosive to prevent the gases of explosion from escaping into the air.
Tamping generally consists of clay. When gunpowder is used the clay must
be well rammed with a wooden tool, and paper, cotton, or some other dry
material must be placed between the moist clay and the powder. When
dynamite is used it is not necessary to ram the tamping, since the
suddenness of the explosion shatters the rock before the clay can be
driven from the hole.

A few experienced men should be appointed to fire the blasts. These men
should give ample warning previous to the blast in order that all
machinery and tools which might be injured by flying fragments may be
removed out of danger, and so that the workmen may seek safety. When
all is ready they should fire the blasts, keeping accurate count of the
explosions to ensure that no holes have missed fire, and should call the
workmen back when all danger is over. In case any hole has missed fire
it should be marked by a red lamp or flag.

=Nature of Explosions.=--When the explosives are ignited a sudden
development of gases results, producing a sudden and violent increase of
pressure, usually accompanied by a loud report. The energy of the
explosion is exerted in all directions in the form of a sphere having
its center at the point of explosion, and the waves of energy lose their
force as the distance from this central point increases. The energy of
the explosion at any point in the sphere of energy is, therefore,
inversely proportional to the distance of this point from the center of
explosion. In the vicinity of the center of explosion the gases have
sufficient power to destroy the force of cohesion and shatter the rock;
further on, as they lose strength, they only destroy the elasticity of
the material and produce cracks; and still further away they only
produce a shock, and do not affect the material. Within the sphere of
energy there are, therefore, three other concentric spheres: the first
one being where cohesion is destroyed, the second where elasticity is
overcome, and the third where the shock is transmitted by elasticity.
When the latter sphere comes below the surface, the gases remain inside
the rock; but when the surface intersects either of the other two
spheres, the gases blow up the rock, forming a cone or crater, whose
apex is at the point of explosion, and which is called the
blasting-cone. The larger the blasting-cone is, the greater is the
amount of rock broken up; and the object of the engineer should,
therefore, always be so to regulate the depth of the hole and the
quantity of explosive as to secure the largest possible blasting cone in
each case. Experiments are required to determine the most efficient
depth of hole, and quantity of explosive to be employed, since these
differ in different kinds of rock, with the position of the rock
strata, etc.; but in ordinary practice, the depths of the holes are
made from 2 to 3 ft. in the heading and upper portion of the tunnel,
when drilled by hand; and from 6 to 8 ft. when drilled by power drills.
In the lower portion of the profile, the holes are made deeper, from 3
ft. to 4 ft. when drilled by hand, and exceeding 6 ft. when drilled by
power. The distance of the holes apart should be about equal to the
diameter of the blasting-cone; as a general rule it is assumed that the
base of the blasting-cone has a diameter equal to twice the depth of the
hole. The following table gives the average number of holes required in
each part of the excavation for the St. Gothard tunnel in which the
heading was excavated by machine drills while the other parts were
excavated by hand drills:

NO. OF PART.[5] NAME OF PART. NO. OF HOLES.
1. Heading 6 to 9
2. Right wing of heading 3 to 5
3. Left wing of heading 3 to 5
4. Shallow trench with core 2
5. Deepening of trench to floor 6 to 9
6. Narrow mass of core to left 3
7. Greater mass of core to left 6 to 9
8. Culvert 1
--------
Total section 30 to 43

[5] The location of the parts numbered is shown by Fig. 14, p. 36.

The quantity of explosives required for blasting depends upon the
quality of the rock, since the force of the explosives must overcome the
cohesion of the rock, which varies with its nature, and often differs
greatly in rocks of the same kind and composition. The quantity of
explosives required to secure the greatest efficiency in blasting any
particular rock may be determined experimentally, but in practice it is
usually deduced by the following rules: (1) The blasting force is
directly proportional to the weight of the explosives used, and (2) the
bulk of the blasted rock is proportional to the cube of the depth of the
holes. It is usually assumed, also, that the explosive should fill at
least one-fourth the depth of the hole.

The following table gives the depth of holes and amount of dynamite used
at each advance in the Fort George Tunnel illustrated on page 135.

+-------------------+------------+--------+-------+----------+
| ORDER OF FIRING. | KINDS OF | DEPTH. |CHARGE.| KIND OF |
| | HOLES. | | | DYNAMITE.|
+-------------------+------------+--------+-------+----------+
|Bench { 1st round|4 grading |3′ to 5′|50 lbs.|40% climax|
|Holes { |5 bench |9′ 6″ |45 „ |40% „ |
| { 2nd round|6 trimming |3′ to 9′|42 „ |40% „ |
| | | | | |
|Heading { 3d round |8 center cut|9′ |56 „ |60% „ |
| Holes { 4th round|8 side |8′ |48 „ |40% „ |
| { 5th round|6 dry |8′ |36 „ |40% „ |
+-------------------+------------+--------+-------+----------+

CHAPTER IV.

GENERAL METHODS OF EXCAVATION: SHAFTS: CLASSIFICATION OF TUNNELS.

A number of different modes of procedure are followed in excavating
tunnels, and each of the more important of these will be considered in a
separate chapter. There are, however, certain characteristics common to
all of these methods, and these will be noted briefly here.

[Illustration: FIG. 14.--Diagram Showing Sequence of Excavation for St.
Gothard Tunnel.]

[Illustration: FIG. 15.--Diagram Showing Manner of Determining
Correspondence of Excavation to Sectional Profile.]

=Division of Section.=--It may be asserted at the outset that the whole
area of the tunnel section is not ordinarily excavated at one time, but
that it is removed in sections, and as each section is excavated it is
thoroughly timbered or strutted. The order in which these different
sections are excavated varies with the method of excavation, and it is
clearly shown for each method in succeeding chapters. As a single
example to illustrate the proposition just made, the division of the
section and the sequence of excavation adopted at the St. Gothard tunnel
is selected (Fig. 14). The different parts of the section were excavated
in the order numbered; the names given to each part, and the number of
holes employed in breaking it down, are given by the table on page 35.
Whatever method is employed, the work always begins by driving a
heading, which is the most difficult and expensive part of the
excavation. All the other operations required in breaking down the
remainder of the tunnel section are usually designated by the general
term of enlargement of the profile. The various operations of excavation
may, therefore, be classified either as excavation of the heading or
enlargement of the profile.

=Excavation of the Heading.=--There is considerable confusion among the
different authorities regarding the exact definition of the term
“heading” as it is used in tunnel work. Some authorities call a small
passage driven at the top of the profile a heading, and a similar
passage driven at the bottom of the profile a drift; others call any
passage driven parallel to the tunnel axis, whether at the top or at the
bottom of the profile, a drift; and still others give the name “heading”
to all such passages. For the sake of distinctness of terminology it
seems preferable to call the passage a heading when it is located at the
top of the profile, and a drift when it is located near the bottom.

Headings and drifts are driven in advance of the general excavation for
the following purposes: (1) To fix correctly the axis of the tunnel; (2)
to allow the work to go on at different points without the gangs of
laborers interfering with each other; (3) to detect the nature of
material to be dealt with and to be ready in any contingency to overcome
any trouble caused by a change in the soil; and (4) to collect the
water. The dimensions of headings in actual practice vary according to
the nature of the soil through which they are driven. As a general rule
they should not be less than 7 ft. in height, so as to allow the men to
work standing, and have room left for the roof strutting. The width
should not be less than 6 ft., to allow two men to work at the front,
and to give room for the material cars without interfering with the wall
strutting. Usually headings are made 8 ft. wide. The length of headings
in practice varies according to circumstances. In very long tunnels
through hard rock the headings are sometimes excavated from 1000 ft. to
2000 ft. in advance, in order that they may meet as soon as possible and
the ranging of the center line be verified, and so that as great an
area of rock as possible may be attacked at the same time in the work of
enlarging the profile. In short tunnels, where the ranging of the center
line is less liable to error, shorter headings are employed, and in soft
soils they are made shorter and shorter as the cohesion of the soil
decreases. When the material has too little cohesion to stand alone, the
tops and sides of the heading require to be supported by strutting. To
prevent caving at the front of the heading, the face of the excavation
is made inclined, the inclination following as near as may be the
natural slope of the material.

=Enlargement of the Profile.=--The enlargement of the profile is
accomplished by excavating in succession several small prisms parallel
to the heading, and its full length, which are so located that as each
one is taken out the cross-section of the original heading is enlarged.
The number, location, and sequence of these prisms vary in different
methods of excavation, and are explained in succeeding chapters where
these methods are described. To direct the excavation so as to keep it
always within the boundaries of the adopted profile, the engineer first
marks the center line on the roof of the heading by wooden or metal
pegs, or by some other suitable means by which a plumb line may be
suspended. He next draws to a large scale a profile of the proposed
section; and beginning at the top of the vertical axis he draws
horizontal lines at regular intervals, as shown by Fig. 15, until they
intersect the boundary lines of the profile, and designates on each of
these lines the distance between the vertical axis and the point where
it intersects the profile. It is evident that if the foreman of
excavation divides his plumb line in a manner corresponding to the
engineer’s drawing, and then measures horizontally and at right angles
to the vertical center plane of the tunnel the distance designated on
the horizontal lines of the drawing, he will have located points on the
profile of the section, or in other words have established the limits of
excavation.

[Illustration: FIG. 16.--Polar Protractor for Determining Profile of
Excavated Cross-Section.]

In the excavation of the Croton Aqueduct for the water supply of New
York city, an instrument called a polar protractor was used for
determining the location of the sectional profile. It was invented by
Mr. Alfred Craven, division engineer of the work. This instrument
consists of a circular disk graduated to degrees, and mounted on a
tripod in such a manner that it may be leveled up, and also have a
vertical motion and a motion about the vertical axis. The construction
is shown clearly by Fig. 16. In use the device is mounted with its
center at the axis of the tunnel. A light wooden measuring-rod tapering
to a point, shod with brass and graduated to feet and hundredths of a
foot, lies upon the wooden arm or rest, which revolves upon the face of
the disk, and slides out to a contact with the surface of the
excavation at such points as are to be determined. If the only
information desired is whether or not the excavation is sufficient or
beyond the established lines, the rod is set to the proper radius, and
if it swings clear the fact is determined. If a true copy of the actual
cross-section is desired, the rod is brought into contact with the
significant points in the cross-section, and the angles and distances
are recorded.

The general method of directing the excavation in enlarging the profile
by referring all points of the profile to the vertical axis is the one
usually employed in tunneling, and gives good results. It is considered
better in actual practice to have the excavation exceed the profile
somewhat than to have it fall short of it, since the voids can be more
easily filled in with riprap than the encroaching rock can be excavated
during the building of the masonry. In tunnels where strutting is
necessary the excavation must be made enough larger than the finished
section to provide the space for it. In soft-ground tunnels it is also
usual to enlarge the excavation to allow for the probable slight sinking
of the masonry. The proper allowance for strutting is usually left to
the judgment of the foreman of excavation, but the allowance for
settlement must be fixed by the engineer.

SHAFTS.

Shafts are vertical walls or passages sunk along the line of the tunnel
at one or more points between the entrances, to permit the tunnel
excavation to be attacked at several different points at once, thus
greatly reducing the time required for excavation. Shafts may be located
directly over the center of the tunnel or to one side of it, and, while
usually vertical, are sometimes inclined. During the construction of the
tunnel the shafts serve the same purpose as the entrances; hence they
must afford a passageway for the excavated materials, which have to be
hoisted out, and also for the construction tools and materials which
have to be lowered down them. They must also afford a passageway for
workmen, draft animals, and for pipes for ventilation, water, compressed
air, etc. The character of this traffic indicates the dimensions
required, but these depend also upon the method of hoisting employed.
Thus, when a windlass or horse gin is used, and the materials are
hoisted in buckets of small dimensions, the dimensions of the shaft may
also be small; but when steam elevators are employed, and the material
is carried on cars run on to the platform of the elevator, large
dimensions must be given to the shaft. Generally the parts of the shaft
used for different purposes are separated by partitions. The elevator
for workmen and the various pipes are placed in one compartment, while
the elevator for hoisting the excavated material and lowering
construction material is placed in another.

Shafts may be either temporary or permanent. They are temporary when
they are filled in after the tunnel is completed, and permanent when
they are left open to supply ventilation to the tunnel. Permanent shafts
are usually made circular, and lined with brick, unless excavated in
very hard and durable rock. When sunk for temporary use only, shafts are
usually made rectangular with the greater dimension transverse to the
tunnel. They are strutted with timber. A pump is generally located at
the bottom of the shaft to collect the water which seeps in from the
sides of the shaft and from the tunnel excavation. The dimensions of
this pump will of course vary with the amount of water encountered, as
will also the capacity of the pump for forcing it up and out of the
shaft, which has always to be kept dry.

The majority of engineers prefer to sink shafts directly over the center
line of the tunnel. Side shafts are employed chiefly by French
engineers. The chief advantage of the former method is the great
facility which it affords for hoisting out the materials, while in favor
of the latter method is the non-interference of the shaft with the
operations inside the tunnel. Were it not that the side shaft requires
the introduction of a transverse gallery connecting it with the tunnel,
it would be on the whole superior to the center shaft; but the side
gallery necessitates turning the cars at right angles, and consequently
the use of a very sharp curve or a turntable to reach the shaft bottom,
which is a disadvantage that may outweigh its advantages in some other
respects. It is impossible to state absolutely which of these methods of
locating shafts is the best; both present advantages and disadvantages,
and the use of one or the other is usually determined more by the local
conditions than by any general superiority of either.

When side shafts are employed they are sometimes made inclined instead
of vertical. This form is used when the depth of the shaft is small. By
it the hauling is greatly simplified, since the cars loaded at the front
with excavated material can be hauled directly out of the shaft and to
the dumping-place, surmounting the inclined shaft by means of continuous
cables. The short galleries connecting the side shafts with the tunnel
proper usually have a smaller section than the tunnel, but are excavated
in exactly the same manner. Another form of side shaft sometimes used is
one reaching to the surface when the tunnel runs close to the side of
cliff, as is the case with some of the Alpine railway tunnels.

CLASSIFICATION OF TUNNELS.

Tunnels are classified in various ways, but the most logical method
would appear to be a grouping according to the quality of the material
through which they are driven; and this method will be adopted here. By
this method we have first the following general classification: (1)
Tunnels in hard rock; (2) tunnels in ordinary loose soil; (3) tunnels in
quicksand; (4) open-cut tunnels; and (5) submarine tunnels. It is hardly
necessary to say that this classification, like all others, is simply
an arbitrary arrangement adopted for the sake of order and convenience
in treating the subject.

=Tunnels in Hard Rock.=--With the numerous labor-saving methods and
machines now available, hard rock is perhaps the safest and easiest of
all materials through which to drive a tunnel. Tunnels through hard rock
may be excavated, either by a drift or by a heading. The difference
depends upon whether the advance gallery is located close to the floor
or near the soffit of the section.

=Tunnels in Loose Soils.=--In driving tunnels through loose soils many
different methods have been devised, which may be grouped as follows:
(1) Tunnels excavated at the soffit--Belgian method; (2) tunnels
excavated along the perimeter--German method; (3) tunnels excavated in
the whole section--English, Austrian and American methods; (4) tunnels
excavated in two halves independent of each other--Italian method.

(1) Excavating the tunnel by beginning at the soffit of the section, or
by the Belgian method, is the method of tunneling in loose soils most
commonly employed in Europe at the present time. It consists in
excavating the soffit of the section first; then building the arch,
which is supported upon the unexcavated ground; and finally in
excavating the lower portion of the section, and building the side walls
and invert.

(2) In excavating tunnels along the perimeter an annular excavation is
made, following closely the outline of the sectional profile in which
the lining masonry is built, after which the center core is excavated.
In the German method two drifts are opened at each side of the tunnel
near the bottom. Other drifts are excavated, one above the other, on
each side to extend or heighten the first two until all the perimeter is
open except across the bottom. The masonry lining is then built from the
bottom upwards on each side to the crown of the arch, and then the
center core is removed and the invert is built.

(3) This method, as its name implies, consists in taking out short
lengths of the whole sectional profile before beginning the building of
the masonry. In the English method the invert is built first, then the
side walls, and finally the arch. The excavators and masons work
alternately. The Austrian method differs in two particulars from the
English: the length of section opened is made great enough to allow the
excavators to continue work ahead of the masons, and the side walls and
roof are built before the invert. In the American method the whole
section of the tunnel is open at once: excavators and masons work
simultaneously, but a very large quantity of timbering is required.

(4) The Italian method is very seldom employed on account of its
expensiveness, but it can often be used where the other methods fail. It
consists in excavating the lower half of the section, and building the
invert and side walls, and then filling the space between the walls in
again except for a narrow passageway for the cars; next the upper part
of the section is excavated, as in the Belgian method, and the arch is
built; and finally the soil in the lower part is permanently removed.

=Tunnels in Quicksand.=--Tunnels through quicksand are driven by one of
the ordinary soft-ground methods after draining away the water, or else
as submarine tunnels.

=Open-Cut Tunnels.=--Open-cut tunnels are those driven at such a small
depth under the surface that it is more convenient to excavate an open
cut, build the tunnel masonry inside it, and then refill the open
spaces, than it is to carry on the work entirely underground. In firm
soils the usual mode of operation is to excavate first two parallel
trenches for the side walls, then remove the core, and build the arch
and the invert. In unstable soils, since the invert must be built first,
it is usual to open up a single wide trench. In infrequent cases where a
tunnel is desired in a place which is to be filled in, the masonry is
built as a surface structure, which in due time is covered.

=Submarine Tunnels.=--The mode of procedure followed in excavating
submarine tunnels depends upon whether the material penetrated is
pervious or impervious to water. In impervious material any of the
ordinary methods of tunneling found suitable may be employed. In
pervious material the excavation may be accomplished either by means of
compressed air to keep the water out of the excavation, or by means of a
shield closing the front of the excavation, or by a combination of these
two methods. Tunnels on the river bed are built by means of coffer dams
which inclose alternate portions of the work, by sinking a continuous
series of pneumatic caissons and opening communication between them, and
by sinking the tunnel in sections constructed on land.

{_In hard rock._ {By drifts.
{ {By a heading.
{ {_By upper half:_ }
{ { the arch is built }Belgian method.
{ { before the side walls. }
{ {
{ {_By the perimeter:_ }
{ { excavated and lined }
{ { before the central }German method.
{ { nucleus is removed. }
{ {
{_In loose soil._{_By whole section:_ {English method.
{ { the lining begins after{Austrian method.
{ { the whole section is {American method.
{ { excavated. {
{ {
{ {_By halves:_ }
{ { the lower half is }
{ { excavated and lined, }Italian method.
{ { followed by the work }
{ { of the upper half. }
METHODS OF{
EXCAVATING{_In quicksand._
TUNNELS. {
{ {In resistant soils. {By two lateral
{ { {narrow trenches.
{_Open-cut_ {
{_tunnels._ {In loose soils. {By one very large
{ { {trench.
{ {
{ {Built up. By slices.
{
{ {At great depths under }By any method.
{ {the river bed. }
{ {
{ { {By shield.
{ {At small depths {By compressed
{ {under the river {air.
{_Submarine_ {bed. {By shield and
{_tunnels._ { {compressed air.
{ {
{ { {By coffer dams.
{ { {By pneumatic
{ {On the river bed. {caissons.
{ { {By built-up
{ { {sections.

The above diagram gives in compact form the classification of tunnels
according to materials penetrated and methods of excavation adopted,
which have been described more fully in the succeeding paragraphs. It
may be noted here again that this is a purely arbitrary classification,
and serves mostly as a convenience in discussing the different classes
of tunnels without confusion.

CHAPTER V.

METHODS OF TIMBERING OR STRUTTING TUNNELS.

The purpose of timbering or strutting in tunnel work is to prevent the
caving-in of the roof and side walls of the excavation previous to the
construction of the lining. As the strutting has to resist all the
pressures developed in the roof and side walls, which may be exceedingly
troublesome and of great intensity in loose soils, its design and
erection call for particular care. The method of strutting adopted
depends upon the method of excavation employed; but in every case the
problem is not only to build it strong enough to withstand the pressures
developed, but to do this as economically as possible, and with as
little hindrance as may be to the work which is going on simultaneously
and which will come later. Only the latter general problems of strutting
peculiar to all methods of tunnel work will be considered here. For this
consideration strutting may be classified according to the material of
which it is built, under the heads of timber structures and iron
structures.

[Illustration: FIG. 17.--Joining Tunnel Struts by Halving.]

[Illustration: FIG. 18.--Round Timber Post and Cap Bearing.]

TIMBER STRUTTING.

Timber is nearly always employed for strutting in tunnel work. So long
as it has the requisite strength, any kind of timber is suitable for
strutting, since, it being only temporarily employed, its durability is
a matter of slight importance. Timber with good elastic properties, like
pine or spruce, is preferably chosen, since it yields gradually under
stress, thus warning the engineer of the approach of danger; while oak
and other strong timbers resist until the last moment, and then yield
suddenly under the breaking load. Soft woods, moreover, are usually
lighter in weight than hard woods, which is a considerable advantage
where so much handling is required in a restricted space. Round timbers
are generally employed, since they are less expensive, and quite as
satisfactory in other respects as sawed timbers. In the English and
Austrian methods of strutting, which are described further on, a few of
the principal struts are of sawed timbers.

The various timbers of the strutting are seldom attached by framed
joints, but wedges are used to give them the necessary bearing against
each other. Where framed joints are employed they are made of the
simplest form usually by halving the joining timbers, as shown by Fig.
17. Fig. 18 shows a form of joint used where round posts carry beams of
similar shape. The reason why it is possible to do away with jointed
connections to such a great extent, is that the strains which the
timbers have to resist are either compressive or bending strains, and
because the timbers are so short that they do not require to be spliced.

=Strutting of Headings.=--The method of strutting the heading that is
employed depends upon the material through which the heading is driven.
In solid rock strutting may not be required at all, or only for the
purpose of preventing the fall of loose blocks from the roof, then
vertical props are erected where required, or horizontal beams are
inserted into the side walls, as shown by Fig. 19. These horizontal
beams may be used singly at dangerous places, or they may be placed from
2 ft. to 3 ft. apart all along the heading. In the latter case they
usually carry a lagging of planks, which may be placed at intervals or
close together, and filled above with stone in case the roof of the
excavation is very unstable. Planks used in this manner are usually
called poling-boards. Where the side walls as well as the roof require
support, vertical side posts are employed to carry the roof beams, as
shown by Fig. 20; and, when necessary, poling-boards are inserted
between these posts and the walls of the excavation.

[Illustration: FIG. 19.--Ceiling Strutting for Tunnel Roofs.]

[Illustration: FIG. 20.--Ceiling Strutting with Side Post Supports.]

[Illustration: FIG. 21.--Sill, Side Post and Cap Cross Frame Strutting.]

[Illustration: FIG. 22.--Reinforced Cross Frame Strutting for
Treacherous Materials.]

_Frame Strutting._--In very loose soils not only the roof and side
walls, but also the floor of the heading require strutting. In these
cases frame strutting is employed, as shown by Fig. 21. It consists
simply of a rectangular frame; at the top there is a crown bar supported
by two vertical side posts setting on a sill laid across the bottom of
the heading. These frames are spaced at close intervals, and carry
longitudinal planks or poling-boards. The sill of the frame is sometimes
omitted when the soil is stable enough to permit it, and in its place
wooden footing blocks are substituted to carry the side posts. In soils
where the pressures are great enough to bend the crown bar, a secondary
frame is employed, as shown by Fig. 22, the two inclined roof members,
or rafters, of which support the crown bar at the center.

[Illustration: FIG. 23.--Longitudinal Poling-Board System of Roof
Strutting.]

[Illustration: FIG. 24.--Transverse Poling-Board System of Roof
Strutting.]

It is the more common practice in driving headings through soft soils to
use inclined poling-boards to support the roof. Fig. 23 shows one method
of doing this. The method of operation is as follows: Assuming the
poling-boards _a_ and _b_ to be in place, and supported by the frames
_A_, _B_, _C_, as shown, the first step in continuation of the work is
to insert the poling-board _c_ over the crown bar of frame _C_, and
under the block _m_. Excavation is then begun at the top, and as fast as
the soil is removed ahead of it the poling-board _c_ is driven ahead
until its rear end only slightly overhangs the crown bar of frame _C_.
The remainder of the face of the heading is then excavated nearly to the
front end of the poling-board _c_, and another frame is set up. By a
succession of these operations the heading is advanced. The
poling-boards at the sides of the heading are placed in a similar manner
to the roof poling-boards. A second method of using inclined
poling-boards is shown by Fig. 24. Here the poling-boards run
transversely, and are supported by the arrangement of timbering shown.
The chief advantage of using these inclined poling-boards, particularly
in the manner shown by Fig. 23, is that the excavators work under cover
at all times, and are thus safe from falling fragments or sudden
cavings.

_Box Strutting._--In very treacherous soils, such as quicksand, peat,
and laminated clay, box strutting is commonly employed. The method of
building this strutting is to set up at the face of the work a
rectangular frame, and use it as a guide in driving a lagging or boxing
of horizontal planks into the soft soil ahead. These planks have sharp
edges, and are driven to a distance of 2 ft. or 3 ft. into the face of
the heading, so as to inclose a rectangular body of earth. This earth is
excavated nearly to the ends of the planks, and then another frame is
inserted close up against the new face of the excavation, which supports
the planks so that the remainder of the earth included by them may be
removed. These two frames, with their plank lagging, constitute a “box;”
and a series of these boxes, one succeeding another, form the strutting
of the heading.

=Strutting the Face.=--In some cases it is found necessary to strut the
face of the heading in order to prevent it from caving in. This is
generally done by setting plank vertically, and bracing them up by means
of inclined props whose feet abut against the sill of the nearest cross
frame. This strutting is erected while the workmen are placing the side
and roof strutting, and is removed to permit excavation.

=Full Section Timber Strutting.=--For strutting the full section two
forms of timbering are employed, known as the polygonal system and the
longitudinal system.

Longitudinal strutting consists of a timber structure so arranged as to
have all the principal members supporting the poling-boards parallel to
the axis of the tunnel. This system of strutting is peculiar to the
English method of tunneling. The longitudinal timbers rest on this
finished masonry at one end, and are carried on a cross frame or by
props at the other end. At intermediate points the longitudinals are
braced apart by struts in planes transverse to the tunnel axis. This
construction makes a very strong strutting framework, since the
transverse struts act as arch ribs to stiffen the longitudinals; but the
use of transverse poling-boards requires the excavation of a larger
cross-section than is necessary when longitudinal poling-boards are
employed, and this increases the cost both for the amount of earth
excavated and the greater quantity of filling required.

In polygonal strutting the main members are in a plane normal to the
axis of the tunnel. They form a polygon whose sides follow closely the
sectional profile of the excavation. These polygonal frames are placed
at more or less short intervals apart, and are braced together by short
longitudinal struts lying close to the sides of the excavation, and
running from one frame to the next, and also by longer longitudinal
members which extend over several frames. The polygonal system of
strutting is peculiar to the Austrian method of tunneling, and is fully
described in a succeeding chapter. One of its distinctive
characteristics is that the poling-boards are inserted parallel to the
tunnel axis. Polygonal strutting is generally held to be stronger than
longitudinal strutting under uniform loads, but it is more liable to
distortion when the loads are unsymmetrical.

[Illustration: FIG. 25.--Shaft with Single Transverse Strutting.]

[Illustration: FIG. 26.--Rectangular Frame Strutting for Shafts.]

[Illustration: FIG. 27.--Reinforced Rectangular Frame Strutting for
Shafts in Treacherous Materials.]

=Strutting of Shafts.=--Tunnel shafts are strutted both to prevent the
caving-in of the sides and to divide them into compartments. When the
material penetrated is very compact, and caving is not likely, a single
series of transverse struts, one above the other, running from the top
to the bottom of the shaft, as shown by Fig. 25, is used to divide it
into two compartments. In softer material, where the sides of the shaft
require support, Fig. 26 shows a form of strutting commonly employed. It
consists of vertical corner posts braced apart at intervals by four
horizontal struts placed close to the walls of the shaft. The longer
side struts are also braced apart at the center by a middle strut which
divides the shaft into two compartments. A lagging of vertical plank is
placed between the walls of the shaft and the horizontal side struts. In
very loose soils the form of strutting shown by Fig. 27 is employed.
This is practically the same construction as is shown by Fig. 26, with
the addition of an interior polygonal horizontal bracing in each half of
the shaft. Referring to Fig. 27, the timbers _a_, _a_, etc., are
vertical and continuous from the top to the bottom of the shaft; and the
horizontal timbers, _b_, _b_, etc., are spaced at more or less close
intervals vertically. The lagging planks may be laid with spaces between
them, or close together, or, in case of very loose material, with their
edges overlapping. The manner of constructing the strutting is also
governed by the stability of the soil. In firm soils it is possible to
sink the shaft quite a depth without timbering, and the timbering can
be erected in sections of considerable length, which is always an
advantage, but in loose soils the timbering has to follow closely the
excavation.

The solid wall shaft struttings which have been described are
discontinued at the point where the shaft intersects the tunnel
excavation; and from this point to the floor of the tunnel an open
timbering is employed, whose only duty is to support the weight of the
solid strutting above. This timbering is made in various forms, but the
most common is a timber truss or arch construction which spans the
tunnel section.

=Quantity of Timber.=--The quantity of timber employed in strutting a
tunnel varies with the character of the material through which the
tunnel is excavated: it is small for solid-rock tunnels, and large for
soft-ground tunnels. In the Belgian method of excavation a smaller
quantity of timber is used than in any of the other ordinary methods.
For single-track tunnels excavated by this method there will be needed
on an average about 3 to 3¹⁄₃ cu. yds. of timber per lineal foot of
tunnel. Practical experience shows that about four-fifths of the timber
once used can be employed for the second time. In any of the methods in
which the whole tunnel section is excavated at once, the average amount
of timber required per lineal foot is about 8.7 cu. yds. Of this amount
about two-thirds can be used a second time. In the Italian method, in
which the upper half and the lower half are excavated separately, about
5 cu. yds. of timber are required per lineal foot of tunnel, about
one-half of which can be employed a second time. For quicksand tunnels
the amount of timbering required per lineal foot varies from 3 to 5
cubic yds. Shaft strutting requires from 1 to 1¹⁄₂ cu. yds. of timber
per lineal foot.

=Dimensions of Timber.=--The dimensions of the principal members
composing the strutting of headings, full section, and shafts, are given
in Table I. The planks used for lagging or the poling-boards are usually
from 4 ins. to 6 ins. wide, with a length depending upon the method of
strutting employed.

TABLE I.

Showing Sizes of Various Timbers Used in Strutting Tunnels Driven
Through Different Materials.

+---------------------------------+-----------+----------------------+
| | ROCK. | SOFT SOILS. |
| +-----+-----+--------+------+------+
| |Hard.|Soft.|Compact.|Loose.| Very |
| | | | | |loose.|
| +-----+-----+--------+------+------+
| | ins.| ins.| ins. | ins. | ins. |
|Headings: | | | | | |
| Cap-pieces and vertical struts | 6 | 8 | 10 | 12 | 14 |
| Sills | | | 8 | 10 | 12 |
| Struts | 5 | 5 | 6 | 7 | 8 |
| Distance apart of the frames in | | | | | |
| feet | 6 | 4.5| 3 | 2.6 | 2.6 |
| | | | | | |
|Strutting of the tunnel, | | | | | |
|longitudinal strutting: | | | | | |
| Crown bars | 12 | 14 | 14 | | |
| Props vertical or inclined | | | | | |
| supporting the crown bars | 10 | 12 | 14 | | |
| Sills | 8 | 8 | 10 | | |
| Cap-pieces or saddles | 10 | 12 | 14 | | |
| Struts to stiffen the structure | 6 | 8 | 10 | | |
| Distance apart of the frames (in| | | | | |
| feet) | 4.5 | 4 | 3 | | |
| | | | | | |
|Polygonal strutting: | | | | | |
| Cap-pieces and contour pieces | 8 | 10 | 12 | 14 | 16 |
| Vertical struts on top | 10 | 12 | 14 | 16 | 18 |
| Vertical struts below | 12 | 14 | 16 | 20 | 24 |
| Intermediate sills | 12 | 14 | 16 | 20 | 24 |
| Lower sills | | | 12 | 16 | 18 |
| Raking props | 10 | 10 | 10 | 12 | 12 |
| Distance apart of the frames (in| | | | | |
| feet) | 6 | 4.5 | 4 | 3 | 3 |
| | | | | | |
|Shafts: | | | | | |
| Horizontal beams forming the | | | | | |
| frame | 8 | 8 | 10 | 12 | 14 |
| Transverse beams | 8 | 8 | 8 | 10 | 12 |
| Vertical struts between the | | | | | |
| frames | 8 | 8 | 10 | 12 | 12 |
| Struts to reënforce the frame | | 6 | 8 | 8 | 8 |
| Distance apart of the strutting | | | | | |
| (in feet) | 6 | 4.5 | 4 | 3 | 2.6 |
+---------------------------------+-----+-----+--------+------+------+

IRON STRUTTING.

In 1862 Mr. Rziha employed old iron railway rails for strutting the
Naensen tunnel, and his example was successfully followed in several
tunnels built later where timber was scarce and expensive. The
advantages which iron strutting is claimed to possess over the more
common wooden structure are: its greater strength; the smaller amount of
space which it takes up; and the fact that it does not wear out, and
may, therefore, be used over and over again.

[Illustration: FIG. 28.--Strutting of Timber Posts and Railway Rail
Caps.]

[Illustration: FIG. 29.--Strutting made entirely of Railway Rails.]

=Iron Strutting in Headings.=--In strutting the headings the cross
frames have a crown bar consisting of a section of old railway rail
carried either by wood or iron side posts. When wooden side posts are
used their upper ends have a dovetail mortise, and are bound with an
iron band, as shown by Fig. 28. The base of the rail crown bar is set
into the dovetail mortise and fastened by wedges. When iron side posts
are employed they usually consist of sections of railway rails, and the
crown bar is attached to them by fish-plate connections, as shown by
Fig. 29. The iron cross frames are set up as the heading advances, and
carry the plank lagging or poling-boards, exactly in the same manner as
the timber cross frames previously described.

[Illustration: FIG. 30.--Rziha’s Combined Strutting and Centering of
Cast Iron.]

[Illustration: FIG. 31.--Cast-Iron Segment of Rziha’s Strutting and
Centering.]

=Full Section Iron Strutting.=--The iron strutting devised by Mr. Rziha
for full section work is shown by Fig. 30. Briefly described, it
consists of voussoir-shaped cast-iron segments, which are built up in
arch form. Fig. 31 shows the construction of one of the segments, all of
which are alike, with the exception of the crown segment, which has a
mortise and tenon joint which is kept open by filling the mortise with
sand. The segments are bolted together by means of suitable bolt-holes
in the vertical flanges, and when fully connected form an arch rib of
cast iron. This arch rib, A, Fig. 30, carries a series of angle or
T-iron frames bent into approximately voussoir shape, as shown at B,
Fig. 30. Above these frames are inserted the poling-boards, running
longitudinally, and spanning the distance between consecutive arch ribs.
By removing the bent iron frames the cast-iron rib forms a center upon
which to construct the masonry. Finally, to remove the cast-iron rib
itself, the sand is drawn out of the mortise and tenon joint in the
crown segment, which allows the joint to close, and loosen the segments
so that they are easily unbutted.

The illustration, Fig. 30, shows longitudinal poling-boards; more often
longitudinal crown bars of railway rails span the space between
connective arch ribs, and support transverse poling-boards. In building
the masonry, work is begun at the bottom on each side, the bent iron
frames being removed one after another to give room for the masonry. As
each frame is removed, it is replaced with a sort of screw-jack to
support the poling-boards until the masonry is sufficiently completed to
allow their removal. The interior bracing of the arch rib shown at _a a_
and _b b_ consists of railway rails carried by brackets cast on to the
segments. A similar bracing of rails connects the successive arch ribs.
These lines of bracing serve to carry the scaffolding upon which the
masons work in building the lining.

[Illustration: FIG. 32.--Cast-Iron Segmental Strutting for Shafts.]

=Iron Shaft Strutting.=--In soft-ground shaft work, the use of an iron
strutting, consisting of consecutive cast-iron rings, has sometimes
been employed to advantage. Fig. 32 shows the construction of one of
these rings, which, it will be seen, is composed of four segments
connected to each other by means of bolted flanges. The holes shown in
the circumferential web of the ring are to allow for the seepage from
the earth side walls. The method of placing this cylindrical strutting
is to start with a ring having a cutting-edge. By means of excavation
inside the ring, and by ramming, the ring is sunk into the ground a
distance equal to its height. Another ring is then fastened by special
hooks on top of the first one, and the sinking continued until the
second ring is down flush with the surface. A third ring is then added,
and so on until the entire shaft is excavated and strutted. As in timber
shaft strutting, the solid iron ring strutting is carried down only to
the top of the tunnel section, and below this point there is an open
timber or iron supporting framework.

CHAPTER VI.

METHODS OF HAULING IN TUNNELS.

The transportation from one point to another within the tunnel and its
shafts of any material, whether it is excavated spoil or construction
material, is defined as hauling. In all engineering construction, the
transportation of excavated materials, and materials for construction,
constitutes a very important part of the expense of the work; but
hauling in tunnels where the room is very limited, and where work is
constantly in progress over and at the sides of the track, is a
particularly expensive process. Hauling in tunnels may be done either by
way of the entrances, or by way of the shafts, or by way of both the
entrances and shafts.

[Illustration: FIG. 33.--Platform Car for Tunnel Work.]

=Hauling by Way of Entrances.=--When the hauling is done by the way of
the entrances, the materials to be hauled are taken directly from the
point of construction to the entrances, or in the opposite direction,
by means of special cars of different patterns. For general purposes,
these different patterns of cars may be grouped into three
classes,--platform-cars, dump-cars, and box-cars. Representative
examples of these several classes of cars are shown in Figs. 33 to 36[6]
inclusive, but it will be readily understood that there are many other
forms.

[6] Reproduced from catalogue of Arthur Koppel, New York.

Briefly described, platform-cars (Fig. 33) consist of a wooden platform
mounted on tracks, and they are usually employed for the transportation
of timber, ties, etc. Dump-cars are used in greater numbers in tunnel
work than any other form. Fig. 34 shows a dump-car of metal
construction, and Fig. 35 one constructed with a metal under-frame and
wooden box. These cars are made to run on narrow-gauge tracks, and
usually have a capacity of about one to one and one-half cubic yards.
Box-cars are more extensively employed in Europe for tunnel work than in
America. Fig. 36 shows a typical European box-car for tunnel work. It is
made either to run on narrow-gauge or standard-gauge tracks.

[Illustration: FIG. 34.--Iron Dump-Car for Tunnel Work.]

[Illustration: FIG. 35.--Wooden Dump-Car for Tunnel Work.]

[Illustration: FIG. 36.--Box-Car for Tunnel Work.]

It is usually desirable in tunnel work to employ cars of different forms
for different parts of the work. In rock tunnels it is a common practice
to use narrow-gauge cars of small size in the headings, and larger,
broad-gauge cars for the enlargement of the profile. Where narrow-gauge
cars are employed for all purposes, it will also be found more
convenient to use platform-cars for handling the construction material,
and dump-cars for removing the spoil. The extent to which it is
desirable to use cars of different forms will depend upon the character
and conditions of the work, and particularly upon how far it is possible
to install the permanent track.

As a general ride, it is considered preferable to lay the permanent
tracks at once, and do all the hauling upon them, so that as soon as the
tunnel is completed, trains may pass through without delay. To what
extent this may be done, or whether it can be done at all or not,
depends upon the method of excavation and other local conditions. In
soft-ground tunnels excavated by the English or Austrian methods, it is
quite possible to lay the permanent tracks at first, since the whole
section is excavated at once, and the excavation is kept but a little
ahead of the completed tunnel. In rock tunnels, where the heading is
driven far ahead of the completed section, it is, of course, impossible
to keep the permanent track close to the advance work, and narrow-gauge
tracks must be laid in the heading. The same thing is true in
soft-ground tunnels driven by successive headings and drifts. In these
cases, therefore, where narrow-gauge tracks have to be used for some
portions of the work anyway, the question comes up whether it is
preferable to use temporary narrow-gauge tracks throughout, or to lay
the permanent track as far ahead as possible, and then extend
narrow-gauge tracks to the advance excavation. In the latter case it
will, of course, be necessary to trans-ship each load from the
narrow-gauge to the standard-gauge cars, or _vice versa_, which means
extra cost and trouble. To avoid this, the method is sometimes adopted
of laying a third rail between the standard-gauge rails, so that either
standard- or narrow-gauge cars may be transported over the line.
Whatever form the local conditions may require the system of
construction tracks to assume, it may be set down as a general rule that
the permanent tracks should be kept as far advanced as possible, and
temporary tracks employed only where the permanent tracks are
impracticable.

The motive power employed for hauling in tunnels may be furnished by
animals or by mechanical motors. Animal power is generally employed in
short tunnels and in the advance headings and galleries. In long
tunnels, or where the excavated material has to be transported some
distance away from the tunnel, mechanical power is preferable, for
obvious reasons. The motors most used are small steam locomotives,
special compressed-air locomotives, and electric motors. Compressed air
and electric locomotives are built in various forms, and are
particularly well adapted for tunnel work because of their small
dimensions, and freedom from smoke and heat.

=Hauling by Way of Shafts.=--When the excavated material and materials
of construction are handled through shafts, the operation of hauling may
be divided into three processes: the transportation of the materials
along the floor of the tunnel, the hoisting of them through the shaft,
and the surface transportation from and to the mouth of the shaft. These
three operations should be arranged to work in harmony with each other,
so as to avoid waste of time and unnecessary handling of the materials.
An endeavor should be made to avoid, if possible, breaking or
trans-shipping the load from the time it starts at the heading until it
is dumped at the spoil bank. This can be accomplished in two ways. One
way is to hoist the boxes of the cars from their trucks at the bottom of
the shaft, and place them on similar trucks running on the surface
tracks. The other way is to run the loaded cars on to the elevator
platform at the bottom, hoist them, and then run them on to the surface
tracks. If the first method is employed, the car box is usually made of
metal, and is provided at its top edges with hooks or ears to which to
attach the hoisting cables. When the second method is used, the elevator
platform has tracks laid on it which connect with the tracks on the
tunnel floor, and also with those on the surface.

=Hoisting Machinery.=--The machines most commonly employed for hoisting
purposes in tunnel shafts are steam hoisting engines, horse gins, and
windlasses operated by hand. Windlasses and horse gins are rather crude
machines for hoisting loads, and are used only in special
circumstances, where the shaft is of small depth, when the amount of
material to be hoisted is small, or where for any reason the use of
hoisting engines is precluded. The steam hoisting engine is the standard
machine for the rapid lifting of heavy vertical loads. Recently oil
engines and electric hoists have also come to be used to some extent,
and under certain conditions these machines possess notable advantages.

The construction of hand windlasses is familiar to every one. In tunnel
work this device is located directly over the shaft, with its axis a
little more than half a man’s height, so that the crank handle does not
rise above the shoulder line. To develop its greatest efficiency the
hoisting rope is passed around the windlass drum so that the two ends
hang down the shaft, and as one end descends the other ascends. A skip,
or bucket, is attached to each of the rope ends; and by loading the
descending skip with construction materials and the ascending skip with
spoil, the two skip loads tend to balance each other, thus increasing
the capacity of the windlass, and decreasing the manual labor required
to operate it. Skips varying from 0.3 cu. yd. to 0.5 cu. yd. are used.
The horse gin consists of a vertical cylinder or drum provided with
radial arms to which the horses are hitched, which revolve the cylinder
by walking around it in a circle. The hoisting rope is rove around the
drum so that the two ends extend down the shaft with skips attached, as
described in speaking of the hand windlass. The power of the horse gin
is, of course, much greater than that of a windlass operated by hand,
skips of 1 cu. yd. capacity being commonly used. Horse gins are no
longer economical hoisting machines, according to one prominent
authority, when V(H + 20) > 5000, where V equals the volume of material
to be hoisted, and H equals the height of the hoist, the weight of the
excavated material being 2100 lbs. per cu. yd. As a general rule,
however, it is assumed that it is not economical to employ horse gins
with a depth of shaft exceeding 150 ft.

As already stated, the most efficient and most commonly used device for
hoisting at tunnel shafts is the steam hoisting engine. There are
numerous builders of hoisting engines, each of which manufactures
several patterns and sizes of engines. In each case, however, the
apparatus consists of a boiler supplying steam to a horizontal engine
which operates one or more rope drums. The engines are always
reversible. They may be employed to hoist the skips directly, or to
operate elevators upon which the skips or cars are loaded. In either
case the hoisting ropes pass from the engine drum to and around vertical
sheaves situated directly over the shaft so as to secure the necessary
vertical travel of the ropes down the shaft. Where the shaft is divided
into two compartments, each having an elevator or hoist, double-drum
engines are employed, one drum being used for the operations in one
compartment, and the other for the operations in the other compartment.
Where the work is to be of considerable duration, or when it is done in
cold weather, more or less elaborate shelters or engine houses are built
to cover and protect the machinery.

Choice between the method of hoisting the skips directly, and the method
of using elevators, depends upon the extent and character of the work.
Where large quantities of material are to be hoisted rapidly, it is
generally considered preferable to employ elevators instead of hoisting
the skips directly. In direct hoisting at high speed, oscillations are
likely to be produced which may dash the skips against the sides of the
shaft and cause accidents. The loads which can be carried in single
skips are also smaller than those possible where elevators are used; and
this, combined with the slower hoisting speed required, reduces the
capacity of this method, as compared with the use of elevators. Where
elevators are employed, however, the plant required is much more
extensive and costly; it comprising not only the elevator cars with
their safety devices, etc., but the construction of a guiding framework
for these cars in the tunnel shaft. For these various reasons the
elevator becomes the preferable hoisting device where the quantity of
material to be handled is large, where the shafts are deep, and where
the work will extend over a long period of time; but when the contrary
conditions are the case, direct hoisting of the skips is generally the
cheaper. The engineer has to integrate the various factors in each
individual case, and determine which method will best fulfill his
purpose, which is to handle the material at the least cost within the
given time and conditions.

[Illustration: FIG. 37.--Elevator Car for Tunnel Shafts.]

The construction of elevators for tunnel work is simple. The elevator
car consists usually of an open framework box of timber and iron, having
a plank floor on which car tracks are laid, and its roof arranged for
connecting the hoisting cable (Fig. 37[7]). Rigid construction is
necessary to resist the hoisting strains. The sides of the car are
usually designed to slide against timber guides on the shaft walls. Some
form of safety device, of which there are several kinds, should be
employed to prevent the fall of the elevator, in case the hoisting rope
breaks, or some mishap occurs to the hoisting machinery, which endangers
the fall of the car. Speaking tubes and electric-bell signals should
also be provided to secure communication between the top and bottom of
the shaft.

[7] Reproduced from the catalogue of the Ledgerwood Manufacturing
Company, New York.

CHAPTER VII.

TYPES OF CENTERS AND MOLDS EMPLOYED IN CONSTRUCTING TUNNEL LININGS OF
MASONRY.

The masonry lining of a tunnel may be described as consisting of two or
more segments of circular arches combined so as to form a continuous
solid ring of masonry. To direct the operations of the masons in
constructing this masonry ring, templates or patterns are provided which
show the exact dimensions and form of the sectional profile which it is
desired to secure. These patterns or templates will vary in number and
construction with the form of lining and the method of excavation
adopted. Where the excavation is fully lined on all four sides, the
masonry work is usually divided into three parts,--the invert or floor
masonry, the side-wall masonry, and the roof-arch masonry. At least one
separate pattern has to be employed in constructing each of these parts
of the lining; and they are known respectively as ground molds, leading
frames, and arch centers, or simply centers. In the following paragraphs
the form and construction usually employed for each of these three kinds
of patterns is described.

=Ground Molds.=--Ground molds are employed in building the tunnel
invert. They are generally constructed of 3-inch plank cut exactly to
the form and dimensions of the invert masonry as shown in Fig. 38. To
permit of convenience of handling in a restricted space, they are
generally made in two parts, which are joined at the middle by means of
iron fish-plates and bolts. Either one or two ground molds may be
employed. Where two molds are used they are set up a short distance
apart, and cords are stretched from one to the other parallel to the
axis of the tunnel, by which the masons are guided in their work.
Extreme care has to be taken in setting the molds to ensure that they
are fixed at the proper grade, and are in a plane normal to the axis of
the tunnel. Where only one ground mold is employed, the finished masonry
is depended upon to supply the place of the second mold, cords being
stretched from it to the single mold placed the requisite distance
ahead. The leveling and centering of the molds is accomplished by means
of transit and level.

[Illustration: FIG. 38.--Ground Mold for Constructing Tunnel Invert
Masonry.]

[Illustration: FIG. 39.--Combined Ground Mold and Leading Frame for
Invert and Side Wall Masonry.]

Two modifications of the form of ground mold shown by Fig. 39 are
employed. The first modification is peculiar to the English method of
excavation, and consists in combining the ground mold with the leading
frame for the lower part of the side walls, as shown by Fig. 39. The
second modification is employed where the two halves or sides of the
invert are built separately, and it consists simply in using one-half of
the mold shown by Fig. 38. When the last method of constructing the
invert masonry is resorted to, extreme care has to be observed in
setting the half-mold in order to avoid error.

[Illustration: FIG. 40.--Leading Frame for Constructing Side Wall
Masonry.]

=Leading Frames.=--As already stated, leading frames are the patterns,
or molds, used in building the side walls of the lining. Like the ground
mold they are usually built of plank; one side being cut to the curve of
the profile, and the other being made parallel to the vertical axis of
the tunnel section. The vertical side usually has some arrangement by
which a plumb bob can be attached, as shown by Fig. 40, to guide the
workmen in erecting the frame. The combined leading frame and ground
mold shown in Fig. 39 has already been described. The use of this frame
is possible only where the masonry is begun at the invert and carried up
on each side at the same time. This mode of construction is peculiar to
the English method of tunneling; in all other methods the form of
separate ground frame shown by Fig. 40 is employed. The ground frames
are lined in and leveled up by transit and level; and, as in setting the
ground frames, care must be taken to secure accuracy in both direction
and elevation.

=Arch Centers.=--The template or form upon which the roof arch is built
is called a center. Unlike the ground molds and leading frames, the arch
centers have to support the weight of the masonry and the roof pressures
during the construction of the lining, and they, therefore, require to
be made strong. Owing to the fact that the pressures are indeterminate,
it is impossible to design a rational center, and resort is had to those
constructions which past experience has shown to work satisfactorily
under similar conditions. In a general way it can always be assumed that
the construction should be as simple as possible, that the center should
be so designed that it can be set up and removed with the least possible
labor, and that the different pieces of the framework and lagging should
be as short as possible, for convenience in handling.

Tunnel centers are usually composed of two parts,--a mold or curved
surface upon which the masonry rests, and a framework which supports the
mold. The curved surface or mold consists of a lagging of narrow boards
running parallel to the tunnel axis, which rests upon the arched top
members of two or more consecutive supporting frames. The supporting
frame is built in the form of a truss, and must be made strong enough to
withstand the heavy superimposed loads, consisting of the arch masonry
during construction, and of the roof pressures which are transferred to
the center when the strutting is removed to allow the masonry to be
placed. The framework of the center is supported either by posts resting
upon the floor of the excavation, or upon the invert masonry when this
is built first, as in the English and Austrian methods, or it may be
supported directly upon the ground where the arch masonry is built
first, as in the Belgian method of tunneling.

In describing the various methods of tunneling in succeeding chapters,
the center construction and method of supporting the center peculiar to
each will be fully explained, and only a few general remarks are
necessary here. Centers may be classified according to their
construction and composition into plank centers, truss centers, and iron
centers.

[Illustration: FIG. 41.--Plank Center for Constructing the Roof Arch.]

One of the most common forms of plank centers is shown by Fig. 41. It
consists of two half-polygons whose sides consist of 15 in. × 4 ft.
planks having radial end-joints. These two half-polygons are laid one
upon the other so that they break joints, as shown by the figure, and
the extrados of the frame is cut to the true curve of the roof arch. The
planks commonly used for making these centers are 4 ins. thick, making
the total thickness of the center 8 ins. Plank centers of the
construction described are suitable only for work where the pressures to
be resisted are small, as in tunnels through a fairly firm rock,
although there have been instances of their successful use in
soft-ground tunnels.

Where heavy loads have to be carried, trussed centers are generally
employed, the trusses being composed of heavy square beams with scarfed
and tenoned joints, reinforced by iron plates. Different forms of
trusses are employed in each of the different methods of tunneling, and
each of these is described in succeeding chapters; but they are
generally either of the king-post or queen-post type, or some
modification of them. The king-post truss may be used alone, with or
without the tie-beam, as shown by Fig. 42; but generally a queen-post
truss is made to form the base of support for a smaller king-post truss
mounted on its top. This arrangement gives a trapezoidal form to the
center, which approaches closely to the arch profile. Owing to the
character of the pressures transmitted to the center, the usual tension
members can be made very light.

[Illustration: FIG. 42.--Trussed Center for Constructing the Roof Arch.]

The combined center and strutting system devised by Mr. Rziha has
already been described in a previous chapter. In recent European tunnel
work quite extensive use has also been made of iron centers consisting
of several segments of curved I-beams, connected by fish-plate joints so
as to form a semi-circular arch rib. The ends or feet of these I-beam
ribs have bearing-plates or shoes made by riveting angles to the
I-beams. Centers constructed in a similar manner, but made of sections
of old railway rail, were used in carrying out the tunnel work on the
Rhine River Railroad in Germany. The advantages claimed for iron centers
are that they take up less room, and that they can be used over and over
again.

_Setting Up Centers._--According to the method of excavation followed in
building the tunnel, the centers for building the roof arch may have to
be supported by posts resting on the tunnel floor; or where the arch is
built first, as in the Belgian and Italian methods, they may be carried
on blocking resting on the unexcavated earth below. Whichever method is
employed, an unyielding support is essential, and care must be taken
that the centers are erected and maintained in a plane normal to the
tunnel axis. To prevent deflection and twisting, the consecutive centers
are usually braced together by longitudinal struts or by braces running
to the adjacent strutting. Only skilled and experienced workmen should
be employed in erecting the centers; and they should work under the
immediate direction of the engineer, who must establish the axis and
level of each center by transit and level.

_Lagging._--By the lagging is meant the covering of narrow longitudinal
boards resting upon the upper curved chords of the centers, and spanning
the opening between consecutive centers. This lagging forms the curved
surface or mold upon which the arch masonry is laid. When the roof arch
is of ashlar masonry the strips of lagging are seldom placed nearer
together than the joints of the consecutive ring stones, but in brick
arches they are laid close together. Besides the weight of the arch
masonry, the lagging timbers support the short props which keep the
poling-boards in place after the strutting is removed and until the arch
masonry is completed.

_Striking the Centers._--The centers are usually brought to the proper
elevation by means of wooden wedges inserted between the sill of the
center and its support, or between the bottom of the posts carrying the
center and the tunnel floor. These wedges are usually made of hard wood,
and are about 6 ins. wide by 4 ins. thick by 18 ins. long. To strike the
center after the arch masonry is completed, these wedges are withdrawn,
thus allowing the center to fall clear of the masonry. Usually the
center is not removed immediately after striking, so that if the arch
masonry fails the ruins will remain upon the center. The method of
striking the iron center devised by Mr. Rziha has been described in the
previous chapter on strutting.

CHAPTER VIII.

METHODS OF LINING TUNNELS.

Tunnels in soft soils and in loose rock, and rock liable to
disintegration, are always provided with a lining to hold the walls and
roof in place. This lining may cover the entire sectional profile of the
tunnel, or only a part of it, and it may be constructed of timber, iron,
iron and masonry, or, more commonly, of masonry alone.

=Timber Lining.=--Timber is seldom employed in lining tunnels except as
a temporary expedient, and is replaced by masonry as soon as
circumstances will permit. In the first construction of many American
railways, the necessity for extreme economy in construction, and of
getting the line open for traffic as soon as possible, caused the
engineers to line many tunnels with timber, which was plentiful and
cheap. Except for their small cost and the ease and rapidity with which
they can be constructed, however, these timber linings possess few
advantages. It is only the matter of a few years when the decay of the
timber makes it necessary to rebuild them, and there is always the
serious danger of fire. In several instances timber-lined tunnels in
America have been burned out, causing serious delays in traffic, and
necessitating complete reconstruction. Usually this reconstruction has
consisted in substituting masonry in place of the original timber
lining. In a succeeding chapter a description will be given of some of
the methods employed in replacing timber tunnel linings with masonry.
Various forms of timber lining are employed, of which Fig. 44 and the
illustrations in the chapter discussing the methods of relining
timber-lined tunnels with masonry are typical examples.

[Illustration: ~Cross Section.~

~Longitudinal Section.~

FIGS. 43 and 44.--A Typical Form of Timber Lining for Tunnels.]

=Iron Lining.=--The use of iron lining for tunnels was introduced first
on a large scale by Mr. Peter William Barlow in 1869, for the second
tunnel under the River Thames at London, England, and it has greatly
extended since that time. The lining of the second Thames tunnel
consisted of cylindrical cast-iron rings 8 ft. in diameter, the abutting
edges of the successive rings being flanged and provided with holes for
bolt fastenings. Each ring was made up of four segments, three of which
were longer than quadrants, and one much smaller forming the “key-stone”
or closing piece. These segments were connected to each other by flanges
and bolts. To make the joints tight, strips of pine or cement and hemp
yarn were inserted between the flanges. Since the construction of the
second Thames tunnel, iron lining has been employed for a great many
submarine tunnels in England, Continental Europe, and America, some of
them having a section over 28 ft. in diameter. Where circular iron
lining is employed, the bottom part of the section is leveled up with
concrete or brick masonry to carry the tracks, and the whole interior
of the ring is covered with a cement plaster lining deep enough
thoroughly to embed the interior joint flanges. In the succeeding
chapter describing the methods of driving tunnels by shields several
forms of iron tunnel lining are fully described.

=Iron and Masonry Lining.=--During recent years a form of combined
masonry and iron lining has been extensively employed in constructing
city underground railways in both Europe and America. Generally this
form of lining is built with a rectangular section. Two types of
construction are employed. In the first, masonry side walls carry a flat
roof of girders and beams, which carry a trough flooring filled with
concrete, or between which are sprung concrete or brick arches.
Sometimes the roof framing consists of a series of parallel I-beams laid
transversely across the tunnel, and in other cases transverse plate
girders carry longitudinal I-beams. In the second type of construction
the roof girders are supported by columns embedded in the side walls.
Where the tunnel provides for two or four tracks, intermediate column
supports are in some cases introduced between the side columns. In this
construction the roofing consists of concrete filled troughs or of
concrete or brick arches, as in the construction first described.
Examples of combined masonry and iron tunnel lining are illustrated in
the succeeding chapter on tunneling under city streets.

=Masonry Lining.=--The form of tunnel lining most commonly employed is
brick or stone masonry. Concrete and reinforced concrete masonry lining
has been employed in several tunnels built in recent years. The masonry
lining may inclose the whole section or only a part of it. The floor or
invert is the part most commonly omitted; but sometimes also the side
walls and invert are both omitted, and the lining is confined simply to
an arch supporting the roof. The roof arch, the side walls, and the
invert compose the tunnel lining; and all three may consist of stone or
brick alone, or stone side walls may be employed with brick invert and
roof arch. Rubble-stone masonry is usually employed, except at the
entrances, where the masonry is exposed to view. Here ashlar masonry is
usually used. The stone selected for tunnel lining should be of a
durable quality which weathers well. Where bricks are used they should
be of good quality. Owing to the comparative ease with which brick
arches can be built, they are generally used to form the roof arch, even
where the side walls are of stone masonry. Masonry lining may be built
in the form of a series of separate rings, or in the form of a
continuous structure extending from one end of the tunnel to the other.
The latter method of construction produces a stronger structure; but in
case of failure by crushing, the damage done is likely to be more
widespread than where separate rings are employed, one or two of which
may fail without injury to the others adjacent to them. The construction
is also somewhat simpler where separate rings are employed, since no
provision has to be made for bonding the whole lining into a continuous
structure. Where a series of separate rings is employed, the length of
each ring runs from 5 ft. up to 20 ft., it depending upon the character
of the material penetrated, and the method of construction employed. For
the purpose of detailed discussion the construction of masonry lining
may be divided into four parts,--the side-wall foundations, the side
walls themselves, the roof arch, and the invert.

Concrete and reinforced concrete linings are now extensively used on
account of cheapness and facility of handling, but they have the great
disadvantage of resisting pressure after they become hard, which is some
time after being placed. The strutting should, therefore, be left to
support the roof so as to prevent direct pressure on the fresh material.
The roof, as a rule, is supported by longitudinal planks held in
position by five or seven segments of arched frames placed across the
tunnel. A large quantity of timber and carpenter work is thus entirely
wasted and these costly items, in many cases, make the concrete lining
of a tunnel more expensive than the one built of brick and stone. To
avoid these inconveniences tunnels have been successfully lined with
concrete on the side walls and concrete blocks in the arches. These
blocks have been built by hand and molded in the shape of the arch
voussoirs.

=Foundations.=--In tunnels through rock of a hard and durable character
the foundations for the side walls are usually laid directly on the
rock. In loose rock, or rock liable to disintegration, this method of
construction is not generally a safe one, and the foundation excavation
should be sunk to a depth at which the atmospheric influences cannot
affect the foundation bed. In either case the foundation masonry is made
thicker than that of the side walls proper, so as to distribute the
pressure over a greater area, and to afford more room for adjusting the
side-wall masonry to the proper profile. In yielding soils a special
foundation bed has to be prepared for the foundation masonry. In some
instances it is found sufficient to lay a course of planks upon which
the masonry is constructed, but a more solid construction is usually
preferred.

This is obtained by placing a concrete footing from 1 ft. to 2 ft. deep
all along the bottom of the foundation trench, or in some cases by
sinking wells at intervals along the trench and filling them with
concrete, so as to form a series of supporting pillars.

[Illustration: FIG. 45.--Diagram Showing Forms Adopted for Side-Wall
Foundations.]

The form given to the foundation courses and lower portions of the side
walls varies. Where a large bearing area is required, the back of the
wall is carried up vertically as shown by the line _AB_, Fig. 45,
otherwise the rear face of the wall follows the line of excavation _AC_.
For similar reasons the front face of the wall may be made vertical, as
at _FG_, or inclined, as at _FH_. The line _FE_ indicates the shelf
construction designed to support the feet of the posts used to carry the
arch centers during the construction of the roof arch.

=Side Walls.=--The construction of the side walls above the foundation
courses is carried out as any similar piece of masonry elsewhere would
be built. To direct the work and insure that the inner faces of the
walls follow accurately the curve of the chosen profile, leading frames
previously described are employed.

=Roof Arch.=--For the construction of the roof arch, the centers
previously described are employed. Beginning at the edges of the center
on each side, the masonry is carried up a course at a time, care being
taken to have it progress at the same rate on both sides, so that the
load brought onto the centering is symmetrical. As soon as the centers
are erected, the roof strutting is removed, and replaced by short props
which rest on the lagging of the centers and support the poling-boards.
These props are removed in succession as the arch masonry rises along
the curve of the center, and the space between the top of the arch
masonry and the ceiling of the excavation is filled with small stones
packed closely. The keystone section of the arch is built last, by
inserting the stones or bricks from the front edge of the arch ring,
there being no room to set them in from the top, as is the practice in
ordinary open-arch construction. The keying of the arch is an especially
difficult operation, and only experienced men skilled in the work should
be employed to perform it. The task becomes one of unusual difficulty
when it becomes necessary to join the arches coming from opposite
directions.

=Invert.=--In all but one or two methods of tunneling, the invert is the
last portion of the lining to be built. In the English method of
tunneling, the invert is the first portion of the lining to be built,
and the same practice is sometimes necessary in soft soils where there
is danger of the bottoms of the side walls being squeezed together by
the lateral pressures unless the invert masonry is in place to hold them
apart. The ground molds previously described are employed to direct the
construction of the invert masonry.

=General Observations.=--In describing the construction of the roof
arch, mention was made of the stone filling employed between the back of
the masonry ring and the ceiling of the excavation. The spaces behind
the side walls are filled in a similar manner. The object of this stone
filling, which should be closely packed, is to distribute the vertical
and lateral pressures in the walls of the excavation uniformly over the
lining masonry. As the masonry work progresses, the strutting employed
previously to support the walls of the excavation has to be removed.
This work requires care to prevent accident, and should be placed in
charge of experienced mechanics who are familiar with its construction,
and can remove it with the least damage to the timbers, so that they may
be used again, and without causing the fall of the roof or the caving of
the sides by removing too great a portion of the timbers at one time.

=Thickness of Lining Masonry.=--It is obvious, of course, that the
masonry lining must be thick enough to support the pressure of the earth
which it sustains; but, as it is impossible to estimate these pressures
at all accurately, it is difficult to say definitely just what thickness
is required in any individual case. Rankine gives the following formulas
for determining the depths of keystone required in different soils:

For firm soils

( _r_²)
_d_ = √(0.12----),
( _s_ )

and for soft soils,

( _r_²)
_d_ = √(0.48----),
( _s_ )

where _d_ = the depth of the crown in feet, _r_ = the rise of the arch
in feet, and _s_ = the span of the arch in feet. Other writers, among
them Professor Curioni, attempt to give rational methods for calculating
the thickness of tunnel lining; but they are all open to objection
because of the amount of hypothesis required concerning pressures which
are of necessity indeterminate. Therefore, to avoid tedious and
uncertain calculations, the engineer adopts dimensions which experience
has proven to be ample under similar conditions in the past. Thus we
have all gradations in thickness, from hard-rock tunnels requiring no
lining, and tunnels through rocks which simply require a thin shell to
protect them from the atmosphere, to soft-ground tunnels where a masonry
lining 3 ft. or more in thickness is employed. Table II. shows the
thickness of masonry lining used in tunnels through soft soils of
various kinds.

The thickness of the masonry lining is seldom uniform at all points, as
is indicated by Table II. Figs. 46 and 47 show common methods of varying
the thickness of lining at different points, and are self-explanatory.

[Illustration: FIGS. 46 and 47.--Transverse Sections of Tunnels Showing
Methods of Increasing the Thickness of the Lining at Different Points.]

=Side Tunnels.=--When tunnels are excavated by shafts located at one
side of the center line, short side tunnels or galleries are built to
connect the bottoms of the shafts with the tunnel proper. These side
tunnels are usually from 30 ft. to 40 ft. long, and are generally made
from 12 ft. to 14 ft. high, and about 10 ft. wide. The excavation,
strutting, and lining of these side tunnels are carried on exactly as
they are in the main tunnel, with such exceptions as these short
lengths make possible. Table III. gives the thickness of lining used for
side tunnels, the figures being taken from European practice.

=Culverts.=--The purpose of culverts in tunnels is to collect the water
which seeps into the tunnel from the walls and shafts. The culvert is
usually located along the center line of the tunnel at the bottom. In
soft-ground tunnels it is built of masonry, and forms a part of the
invert, but in rock tunnels it is the common practice to cut a channel
in the rock floor of the excavation. Both box and arch sections are
employed for culverts. The dimensions of the section vary, of course,
with the amount of water which has to be carried away. The following are
the dimensions commonly employed:

+----------------+--------+--------+----------+-----------+
|KIND OF CULVERT.| HEIGHT | WIDTH |THICKNESS | THICKNESS |
| |IN FEET.|IN FEET.|OF WALLS |OF COVERING|
| | | | IN FEET. | IN FEET. |
+----------------+--------+--------+----------+-----------+
|Box culvert |1 to 1.5|1 to 1.5|0.8 to 1.2| 0.3 |
|Arch culvert |1 to 1.5|1 to 1.5|0.8 to 1.2| 0.4 |
+----------------+--------+--------+----------+-----------+

It should be understood that the dimensions given in the table are those
for ordinary conditions of leakage; where larger quantities of water are
met with, the size of the culverts has, of course, to be enlarged. To
permit the water to enter the culvert, openings are provided at
intervals along its side; and these openings are usually provided with
screens of loose stones which check the current, and cause the suspended
material to be deposited before it enters the culvert. In cases where
springs are encountered in excavating the tunnel, it is necessary to
make special provisions for confining their outflow and conducting it to
the culvert. In all cases the culverts should be provided with catch
basins at intervals of from 150 ft. to 300 ft., in which such suspended
matter as enters the culverts is deposited, and removed through covered
openings over each basin. At the ends of the tunnel the culvert is
usually divided into two branches, one running to the drain on each
side of the track.

[Illustration: FIG. 48.--Refuge Niche in St. Gothard Tunnel.]

=Niches.=--In short tunnels niches are employed simply as places of
refuge for trackmen and others during the passing of trains, and are of
small size. In long tunnels they are made larger, and are also employed
as places for storing small tools and supplies employed in the
maintenance of the tunnel. Niches are simply arched recesses built into
the sides of the tunnel, and lined with masonry; Fig. 48 shows this
construction quite clearly. Small refuge niches are usually built from 6
ft. to 9 ft. high, from 3 ft. to 6 ft. wide, and from 2 ft. to 3 ft.
deep. Large niches designed for storing tools and supplies are made from
10 ft. to 12 ft. high, from 8 ft. to 10 ft. wide, and from 18 ft. to 24
ft. deep, and are provided with doors. Refuge niches are usually spaced
from 60 ft. to 100 ft. apart, while the larger storage niches may be
located as far as 3000 ft. apart. The niche construction shown by Fig.
48 is that employed on the St. Gothard tunnel.

=Entrances.=--The entrances, or portals, of tunnels usually consist of
more or less elaborate masonry structures, depending upon the nature of
the material penetrated. In soft-ground tunnels extensive wing walls are
often required to support the earth above and at the sides of the
entrance; while in tunnels through rock, only a masonry portal is
required, to give a finish to the work. Often the engineer indulges
himself in an elaborate architectural design for the portal masonry.
There is danger of carrying such designs too far for good taste unless
care is employed; and on this matter the writer can do no better than to
quote the remarks of the late Mr. Frederick W. Simms in his well-known
“Practical Tunneling”:

“The designs for such constructions should be massive to be suitable
as approaches to works presenting the appearance of gloom, solidity,
and strength. A light and highly decorated structure, however elegant
and well adapted for other purposes, would be very unsuitable in such
a situation; it is plainness combined with boldness, and massiveness
without heaviness, that in a tunnel entrance constitutes elegance,
and, at the same time, is the most economical.”

[Illustration: FIG. 49.--East Portal of Hoosac Tunnel.]

Fig. 49 is an engraving from a photograph of the east portal of the
Hoosac tunnel, which is an especially good design. The portals of the
Mount Cenis tunnel were built of samples of stone encountered all along
the line of excavation. The stones were cut and dressed and utilized for
walls and voussoirs. The only ornament that is usually allowed on the
portals is the date of the opening of the tunnel prominently cut in the
stone above the arch.

TABLE II.

Showing Thickness of Masonry Lining for Tunnels through Soft Ground.

+------------------------------+------------+-----------+------------+
| CHARACTER OF MATERIAL. | KEYSTONE. | SPRINGERS.| INVERT. |
+------------------------------+------------+-----------+------------+
| | Ft. | Ft. | Ft. |
|Laminated clay, first variety |2.15 to 3 |2.75 to 3.5| 1.6 to 2.5|
|Laminated clay, second variety|3 to 4.5 |3.5 to 5.5| 2.5 to 4 |
|Laminated clay, third variety |4.5 to 6.5 |5.5 to 8.1| 4 to 4.5|
|Quicksand |2 to 3.28|2 to 4.1| 1.33 to 2.5|
+------------------------------+------------+-----------+------------+

TABLE III.

Showing Thickness of Masonry Lining for Side Tunnels through Soft
Ground.

+------------------------------+----------+----------+-----------+
| CHARACTER OF MATERIAL. | KEYSTONE.|SPRINGERS.| INVERT. |
+------------------------------+----------+----------+-----------+
| | Ft. | Ft. | Ft. |
|Laminated clay, first variety |1.6 to 2.3|1.8 to 3 |1.5 to 2 |
|Laminated clay, second variety|2.3 to 3 |3 to 4.1|2 to 2.6 |
|Laminated clay, third variety |3 to 4 |4.1 to 5 |2.6 to 3.29|
|Quicksand |1.6 to 2.5|1.3 to 2 |1.3 to 2 |
+------------------------------+----------+----------+-----------+

CHAPTER IX.

TUNNELS THROUGH HARD ROCK; GENERAL DISCUSSION; REPRESENTATIVE MECHANICAL
INSTALLATIONS FOR TUNNEL WORK.

The present high development of labor-saving machinery for excavating
rock makes this material one of the safest and easiest to tunnel of any
with which the engineer ordinarily has to deal. To operate this
machinery requires, however, the development of a large amount of power,
its transmission to considerable distances, and, finally, its economical
application to the excavating tools. The standard rock excavating
machine is the power drill, which requires either air or hydraulic
pressure for its operation according to the special type employed. Under
present conditions, therefore, the engineer is limited either to air or
water under compression for the transmission of his power. Steam-power
may be employed directly to operate percussion rock drills; but owing to
the heat and humidity which it generates in the confined space where the
drills work, and because of other reasons, it is seldom employed
directly. Electric transmission, which offers so many advantages to the
tunnel builder, in most respects is largely excluded from use by the
failure which has so far followed all attempts to apply it to the
operation of rock drills. As matters stand, therefore, the tunnel
engineer is practically limited to steam and falling water for the
generation of power, and to compressed air and hydraulic pressure for
its transmission.

Whether the engineer should adopt water-power or steam to generate the
power required for his excavating machinery depends upon their relative
availability, cost, and suitability to the conditions of work in each
particular case. Where fuel is plentiful and cheap, and where
water-power is not available at a comparatively reasonable cost,
steam-power will nearly always prove the more economical; where,
however, the reverse conditions exist, which is usually the case in a
mountainous country far from the coal regions, and inadequately supplied
with transportation facilities, but rich in mountain torrents,
water-power will generally be the more economical. In a succeeding
chapter the power generating and transmission plants for a number of
rock tunnels are described, and here only a general consideration of the
subject will be presented.

=Steam-Power Plant.=--A steam-power plant for tunnel work should be much
the same as a similar plant elsewhere, except that in designing it the
temporary character of its work must be taken into consideration. This
circumstance of its temporary employment prompts the omission of all
construction except that necessary to the economical working of the
plant during the period when its operation is required. The power-house,
the foundations for the machinery, and the general construction and
arrangement, should be the least expensive which will satisfy the
requirements of economical and safe operation for the time required. It
will often be found more economical as a whole to operate the machinery
with some loss of economy during the short time that it is in use than
to go to much greater expense to secure better economy from the
machinery by design and construction, which will be of no further use
after the tunnel is completed. The longer the plant is to be required,
the nearer the construction may economically approach that of a
permanent plant. As regards the machinery itself, whose further
usefulness is not limited by the duration of any single piece of work,
true economy always dictates the purchase of the best quality. Speaking
in a general way, a steam-power plant for tunnel work comprises a boiler
plant, a plant of air compressors with their receivers, and an electric
light dynamo. When hydraulic transmission of power is employed, the air
compressors are replaced by high-pressure pumps; and when electric
hauling is employed, one or more dynamos may be required to generate
electricity for power purposes, as well as for lighting. In addition to
the power generating machines proper, there must be the necessary piping
and wiring for transmitting this power, and, of course, the equipment of
drills and other machines for doing the actual excavating, hauling, etc.

=Reservoirs.=--When water-power is employed, a reservoir has to be
formed by damming some near-by mountain stream at a point as high as
practicable above the tunnel. The provision of a reservoir, instead of
drawing the water directly from the stream, serves two important
purposes. It insures a continuous supply and constant head of water in
case of drought, and also permits the water to deposit its sediment
before it is delivered to the turbines. The construction of these
reservoirs may be of a temporary character, or they may be made
permanent structures, and utilized after construction is completed to
supply power for ventilation and other necessary purposes. In the first
case they are usually destroyed after construction is finished. In
either case, it is almost unnecessary to say, they should be built amply
safe and strong according to good engineering practice in such works,
for the duration of time which they are expected to exist.

=Canals and Pipe Lines.=--For conveying the water from the reservoirs to
the turbines, canals or pipe lines are employed. The latter form of
conduit is generally preferable, it being both less expensive and more
easily constructed than the former. It is advisable also to have
duplicate lines of pipe to reduce the possibility of delay by accident
or while necessary repairs are being made to one of the pipes. The pipe
lines terminate in a penstock leading into the turbine chamber, and
provided with the necessary valves for controlling the admission of
water to the turbines.

=Turbines.=--There are numerous forms of turbines on the market, but
they may all be classed either as impulse turbines or as reaction
turbines. Impulse turbines are those in which the whole available energy
of the water is converted into kinetic energy before the water acts on
the moving part of the turbine. Reaction turbines are those in which
only a part of the available energy of the water is converted into
kinetic energy before the water acts on the moving vanes. Impulse
turbines give efficient results with any head and quantity of water, but
they give better results when the quantity of water varies and the head
remains constant. Reaction turbines, on the contrary, give better
results when the quantity of water remains constant and the head varies.
These observations indicate in a general way the form of turbine which
will best meet the particular conditions in each case. The number of
turbines required, and their dimensions, will be determined in each case
by the number of horse-power required and the quantity of water
available. The power of the turbines is transmitted to the air
compressors or pumps by shafting and gearing.

=Air Compressors.=--An air compressor is a machine--usually driven by
steam, although any other power may be used--by which air is compressed
into a receiver from which it may be piped for use. For a detailed
description of the various forms of air compressors the reader should
consult the catalogues of the several makers and the various text-books
relating to air compression and compressed air. Air compressors, like
other machines, suffer a loss of power by friction. The greatest loss of
power, however, results from the heat of compression. When air is
compressed, it is heated, and its relative volume is increased.
Therefore, a cubic foot of hot air in the compressor cylinder, at say,
60 lbs. pressure, does not make a cubic foot of air at 60 lbs. pressure
after cooling in the receiver. In other words, assuming pressure to be
constant, a loss of volume results due to the extraction of the heat of
compression after the air leaves the compressor cylinder. To reduce the
amount of this loss, air compressors are designed with means to extract
the heat from the air before it leaves the compressor cylinder. Air
compressors may first be divided into two classes, according to the
means employed for cooling the air, as follows: (1) Wet compressors, and
(2) dry compressors. A wet compressor is one which introduces water
directly into the cylinder during compression, and a dry compressor is
one which admits no water to the air during compression. Wet compressors
may be subdivided into two classes: (1) Those which inject water in the
form of spray into the cylinder during compression, and (2) those which
use a water piston for forcing the air into confinement.

The following brief discussion of these various types of compressors is
based on the concise practical discussion of Mr. W. L. Saunders, M. Am.
Soc. C. E., in “Compressed Air Production.” The highest isothermal
results are obtained by the injection of water into the cylinders, since
it is plain that the injection of cold water, in the shape of a finely
divided spray, directly into the air during compression will lower the
temperature to a greater degree than simply to surround the cylinder and
parts by water jackets which is the means of cooling adopted with dry
compressors. A serious obstacle to water injection, and that which
condemns this type of compressor, is the influence of the injected water
upon the air cylinder and parts. Even when pure water is used, the
cylinders wear to such an extent as to produce leakage and to require
reboring. The limitation to the speed of a compressor is also an
important objection. The chief claim for the water piston compressor is
that its piston is also its cooling device, and that the heat of
compression is absorbed by the water. Water is so poor a conductor of
heat, however, that without the addition of sprays it is safe to say
that this compressor has scarcely any cooling advantages at all so far
as the cooling of the air during compression is concerned. The water
piston compressor operates at slow speed and is expensive. Its only
advantage is that it has no dead spaces. In the dry compressor a
sacrifice is made in the efficiency of the cooling device to obtain low
first cost, economy in space, light weight, higher speed, greater
durability, and greater general availability.

Air compressors are also distinguished as double acting and simple
acting. They are simple acting when the cylinder is arranged to take in
air at one stroke and force it out at the next, and they are double
acting when they take in and force out air at each stroke. In form
compressors may be simple or duplex. They are simple when they have but
one cylinder, and duplex when they have two cylinders. A straight line
or direct acting compressor is one in which the steam and air cylinders
are set tandem. An indirect acting compressor is one in which the power
is applied indirectly to the piston rod of the air cylinder through the
medium of a crank. Mr. W. L. Saunders writes in regard to direct and
indirect compression as follows:--

“The experience of American manufacturers, which has been more
extensive than that of others, has proved the value of direct
compression as distinguished from indirect. By direct compression is
meant the application of power to resistance through a single straight
rod. The steam and air cylinders are placed tandem. Such machines
naturally show a low friction loss because of the direct application
of power to resistance. This friction loss has been recorded as low as
5%, while the best practice is about 10% with the type which conveys
the power through the angle of a crank shaft to a cylinder connected
to the shaft through an additional rod.”

=Receivers.=--Compressed air is stored in receivers which are simply
iron tanks capable of withstanding a high internal pressure. The purpose
of these tanks is to provide a reservoir of compressed air, and also to
allow the air to deposit its moisture. From the receivers the air is
conveyed to the workings through iron pipes, which decrease gradually in
diameter from the receivers to the front.

=Rock Drills.=--The various forms of rock drills used in tunneling have
been described in Chapter III., and need not be considered in detail
here except to say that American engineers usually employ percussion
drills, while European engineers also use rotary drills extensively. A
comparison between these two types of drills was made in excavating the
Aarlberg tunnel in Austria, where the Brandt hydraulic rotary drill was
used at one end, and the Ferroux percussion drill was used at the other
end. The rock was a mica-schist. The average monthly progress was 412
ft., with a maximum of 646 ft., with the rotary drills, and an average
of 454 ft. with the percussion drill.

=Excavation.=--Since considerable time is required to get the power
plant established, the excavation of rock tunnels is often begun by
hand, but hand work is usually continued for no longer a period than is
necessary to get the power plant in operation. Generally speaking, the
greatest difficulty is encountered in excavating the advanced drift or
heading. Based on the mode of blasting employed, there are two methods
of driving the advanced gallery, known as the circular cut and the
center cut methods. In the first method a set of holes is first drilled
near the center of the front in such a manner that they inclose a cone
of rock; the holes, starting at the perimeter of the base of the cone,
converge toward a junction at its apex. Seldom more than four to six
holes are comprised in this first set. Around these first holes are
driven a ring of holes which inclose a cylinder of rock, and if
necessary succeeding rings of holes are driven outside of the first
ring. These holes are blasted in the order in which they are driven, the
first set taking out a cone of rock, the second set enlarging this cone
to a cylinder, and the other sets enlarging this cylinder to the
required dimensions of the heading. The number of holes, however, varies
with the quality of rock and they are seldom driven deeper than 4 or 5
ft. This method of excavating the heading, which is commonly followed by
European engineers, is illustrated in Figs. 50 to 52. In these figures
are indicated the number of holes in each round and the sequence of
rounds for the soft, medium and hard rock, as used in the Turchino
tunnel of the Genova Ovada Asti line of the Mediterranean Railway of
Italy. The heading was about 9 ft. square, and five sets of holes were
used in blasting, the depths being 3.91, 4.26 and 4.6 ft. for soft,
medium and hard rock, respectively, and the amount of dynamite consumed
was 2.38, 3.91 a…

source: Project Gutenberglicence: Public domain (per item)year: —id: 60043citation: https://www.gutenberg.org/ebooks/60043characters: 200,001

record · JSON · record JSON

Related services and records

Services

  • Estate — measured countries, lanes and facts
  • Intel — live corroborated events
  • Legal — statutes, cases and citations
  • Encyclopedia — articles with inline sources
  • Space — launches, satellites and orbits
  • Search — federated search and reports
  • Pass — passport account and SSO
  • Corpora — read-only corpus origins
  • e01 — self-hosted corpora and tools

Text and metadata only; each target carries its own sources. Missing data is published as no-data, never estimated.